25A-179 (15) ARCHITECT'S OWNER O FIELD REPORT CONSULTANT ❑ AIA DOCUMENT G711 FIELD 1� Building Inspector PROJECT: VAN CORT INSTRUMENTS , INC- FIELD REPORT NO: 6 CONTRACT: DATED: 9/15/87 ARCHITECT'S PROJECT NO: 10497 DATE 12/22/87 TIME 3 :00 PM WEATHER Cool & Cloudy TEMP. RANGE 40 - 28 EST. % OF COMPLETION 1O00K 63% CONFORMANCE WITH SCHEDULE (+, -) - 3 weeks WORK IN PROGRESS PRESENT AT SITE Plant roof insulation being installed. Looks acceptable, but is going slowly. Plumber doing gas piping for RTU' s and electrician is doing rough-in piping for plant Liner panels going in OBSERVATIONS Electrician has installed building as required on permit drawings and has poured Transformer Pad. Building columns are now grouted. Work is proceeding slowly, but good workmanship is apparent. Weather still is a problem. Temporary heat is being used in the plant building. ITEMS TO VERIFY None Aqoy' INFORMATION OR ACTION REQUIRED None No. 06913 m � ST.LOUIS, ATTACHMENTS None , HOFN1� REPORT BY: AIA DOCUMENT G711 • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages r ARCHITECT'S OWNER CT a A FIELD REPORT CONSULTANT ❑ AIA DOCUMENT G711 FIELD IN Building Inspector PROJECT: VAN CORT INSTRUMENTS, INC. FIELD REPORT NO: 5 CONTRACT: DATED: 9/15/87 ARCHITECT'S PROJECT NO: 10497 DATE 12/11/87 TIME 4 : 00 PM WEATHER Raining TEMP. RANGE 450 - 300 EST. % OF COMPLETION 900K 56% CONFORMANCE WITH SCHEDULE (+, -) -3 weeks WORK IN PROGRESS PRESENT AT SITE Sprinklers go in, no problems . Electrician setting boxes and doing rough-in. Sheetmetal contractor delivering ductwork to site . Plumber finishing rough-in' s . Facade sheeting is well underway. OBSERVATIONS Concrete duct bank poured, required 27 cy of concrete. Entire plant roof is installed. Roof insulation will be installed from below. Office erection is proceeding very slowly. Why?? Most windows in plant are installed - workmanship is poor, and they are not insulated as drawings and specs require . Notified contractor of same, correction will be taken care of. Electrician is wiring exterior walls of plant Gas main is in place to building from Bay State Gas Company. Office is being insulated (walls) and sheated (roof) . Weather is becoming more of a problem now. ITEMS TO VERIFY None sr'�aa INFORMATION OR ACTION REQUIRED Site needs to be cleaned up. Roof insulation must start and be done correctly. Lo s No.06913 m! ATTACHMENTS None MO J� H 0 FAr P REPORT BY: Glib`+-• f-+� AIA DOCUMENT G711 • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages ARCHITECT'S O A CHIR o FIELD REPORT CONSULTANT ❑ AIA DOCUMENT G711 FIELD [N Building Inspector PROJECT: VAN COPT INSTRUMENTS , INC. FIELD REPORT NO: 4 CONTRACT: DATED: 9/15/87 ARCHITECT'S PROJECT NO: 10497 DATE 11/30/87 TIME 5 :00 PM WEATHER Heavy Rain TEMP. RANGE 470 - 370 EST. % OF COMPLETION 650K 40% CONFORMANCE WITH SCHEDULE (+, -) -2 weeks WORK IN PROGRESS PRESENT AT SITE Office is being erected and plant roof is being sheated. Wet pipe sprinkler system is being installed. Project Mgr. LJK poured light standard bases today. OBSERVATIONS Instructed contractor to get columns grouted ASAP . All building siding is installed - looks excellent. Roof insulation is not being installed correctly and will have to be re-done Several minor fabrication errors on structural steel for MBS . Some field fab will be necessary, but this will not effect building appearance or structural integrity. Drywall contractor asked to leave the job so ironworkers can finish roof insulation unhampered by their stud walls, etc. Erection of building is conforming to MBS ' s details and requirements . However, workmanship needs improving. ITEMS TO VERIFY None INFORMATION OR ACTION REQUIRED None RED A,? v NV. � F � N G ATTACHMENTS None REPORT BY: Q/Llati :4� AIA DOCUMENT G711 • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages ARCHITECT'S OWNER ARCHITECT O FIELD REPORT CONSULTANT ❑ AIA DOCUMENT G711 FIELD Building Inspector PROJECT: VAN CORT INSTRUMENTS , INC . FIELD REPORT NO: 3 CONTRACT: DATED: 9/15/87 ARCHITECT'S PROJECT NO: 10497 DATE 11/13/87 TIME 11 :00 PM WEATHER Sunny TEMP. RANGE 550 - 300 EST. % OF COMPLETION 550K - 34% CONFORMANCE WITH SCHEDULE (+, -) 1 Week WORK IN PROGRESS PRESENT AT SITE Wall siding is being installed, structural steel all completed and roof sheets are on roof in bundles . Concrete sidewalk being poured. Plumber finishing rough-in for office. OBSERVATIONS Plant SOG - 6" thick with 6 x 6 x 6 x 6 mesh and poly, poured and finish, looks excellent. Site now has temporary power from Miss . Elect. Office foundations 100% complete . Both office and plant concrete walls have 2" perimeter insulation at grade even though not shown on drawings No anchor bolt problems with office pour . Office footings and foundations have proper mix and PSI and reinforcing steel as required by permit drawings . Need for 2 x 4 Keyway was waived. Weather conditions are starting to impact job schedule . ITEMS TO VERIFY "--'444 RED AR INFORMATION OR ACTION REQUIRED (' No. 06913 s o� M,O J t��TH PSS2 ATTACHMENTS None REPORT BY: AIA DOCUMENT G711 • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages ARCHITECT'S OWNER ARCHITECT D FIELD REPORT CONSULTANT ❑ AIA DOCUMENT 0711 FIELD M Building Inspector '" PROJECT: VAN CORT INSTRUMENTS , INC. FIELD REPORT NO: 2 CONTRACT: DATED: 9/15/87 ARCHITECT'S PROJECT NO: 10497 DATE 10/30/87 TIME 10 : 30 AM WEATHER Cloudy & RainingFEMP. RANGE 800 — 700 EST. % OF COMPLETION 25% CONFORMANCE WITH SCHEDULE (+, —) OK WORK IN PROGRESS PRESENT AT SITE Owner Applied for Building Permit on 10/22/87 . Plant building is being erected - no major problems Office building layout checked and verified. Jobsite trailer arrived on site. OBSERVATIONS Building arrived on 10/21/87 . Catch basins are installed correctly. Owner ordered two additional windows for plant building. Bad soil at loading dock entrance . Instructed Dietz to dig out wet and unstable soil, and replace with processed rock fill . This will be an extra to the owner. Also suggested that this rock fill be paved with asphalt so that proper site drainage would be possible into adjacent trench drain. This will insure stable soil conditions. Site work and excavating contracts proceeding well . ITEMS TO VERIFY .... INFORMATION OR ACTION REQUIRED �REO ARC 4<v' F N V. SG rFt' CD f z No. 05913 m F.-- ATTACHMENTS None REPORT BY: '�L'ttz AIA DOCUMENT G711 • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages ARCHITECT'S OWNER ❑ a ARCHITECT ❑ FIELD REPORT CONSULTANT ❑ AIA DOCUMENT G711 FIELD ■ Building Inspector PROJECT: VAN CORT INSTRUMENTS, INC. FIELD REPORT NO: 1 CFFORRNTTTRACT:DATED 9/15/87 ARCHITECT'S PROJECT NO: 10497 10/16/87 TIME. 11: 00 A.M. WEATHER 0001 & clear TEMP. RANGE 560 - 420 EST. % OF COMPLETION 85K Or . 05% CONFORMANCE WITH SCHEDULE (-I-, —) OK WORK IN PROGRESS PRESENT AT SITE Owner Erik Van COrt Valley Concrete - striping forms and Dietz Excavating Trenching for water supply and setting a "test manhole" and extra for the owner, that was requested by Building Dept. (James Dostal) . OBSERVATIONS Forming needs to be a little neater. Contractor is using (well used) plywood forms. However, very little of concrete is exposed and PSI and mix, and placement of reinforcing steel is per drawings and specs. Questioned contractor on use of form oil and placing of same, during forming process. 4 anchor bolts not correct--had to be reset. Site is clean, and work is progressing in an orderly manner. ITEMS TO VERIFY Need to submit and receive final Building Permit from Northampton prior to arrival and erection of pre-engineered steel building. INFORMATION OR ACTION REQUIRED Change plumbing drawings to conform ED with City of Northampton requirements. ��i�NV �r F �t C) N..0661913 x ST.LOJ!S. ATTACHMENTS None REPORT BY: "000 AIA DOCUMENT G711 ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages