25A-179 (12) ARCHITECT'S OWNER ❑ FIELD REPORT ARCHITECT ❑ CONSULTANT ❑ AIA DOCUMENT G711 FIELD PROJECT: Van Cort Instruments, Inc. FIELD REPORT NO: 9 CONTRACT: 9/15/87 ARCHITECT'S PROJECT NO: 10497 DATE 2/4/88 TIME WEATHER Snow 6" TEMP. RANGE 34-28 EST. % OF COMPLETION 85% CONFORMANCE WITH SCHEDULE (+, -) - 4 weeks WORK IN PROGRESS PRESENT AT SITE Window frames being installed in office. Office ductwork being installed. Iron workers installing steel for facade. Plumber installing gas piping in office. OBSERVATIONS Massachusetts Electric turned on permanent power to facility. Architectural finishes being ins all d in off' Gave drywall contractor details for drywalling at soffit and steel columns. Several leaks in roof - instructed iron workers to correct. Excessive snow hampering final sitework grading. JUN ITEMS TO VERIFY None INFORMATION OR ACTION REQUIRED None S�FRED Apo� o j No. 05913 ATTACHMENTS None P`,O DTI F REPORT BY: AIA DOCUMENT G711 • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages ARCHITECT'S O A WHIR a FIELD REPORT CONSULTANT ❑ AIA DOCUMENT 0711 FIELD PROJECT: Van Cort Instruments, Inc. FIELD REPORT NO: 15 CONTRACT: 9-15-87 ARCHITECT'S PROJECT NO: 10497 DATE 4-29-88 TIME 3:00 P.M. WEATHER Clear TEMP. RANGE 560 — 370 EST. % OF COMPLETION 987 - Punch-List CONFORMANCE WITH SCHEDULE (+, —4 Weeks WORK IN PROGRESS PRESENT AT SITE All contractors basically clearing up their work areas and are pulling off the site. Only minor punch-list items are being addressed at this time. OBSERVATIONS Owner has moved some office equipment in completed office areas and is setting up his office lay-out. Final security systems are being installed in office. All architectural finishes have been completed. Iron workers have finished the facade work. Should be last field report, will complete certificate of "Substantial completion" form next week. JUN !J I ITEMS TO VERIFY None INFORMATION OR ACTION REQUIRED All contractors need to submit all 0 & M RED q manuals to owner. Parking lot paving is scheduled for next week. V�;1�N �• r� c� Expect no problems. N . 059"3 y r ATTACHMENTS None REPORT BY: G� AIA DOCUMENT G711 ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages ARCHITECT'S OWNER CT O FIELD REPORT CONSULTANT ❑ AIA DOCUMENT G711 FIELD PROJECT: Van Cort Instruments, Inc. FIELD REPORT NO: 14 CONTRACT: 9-15-88 ARCHITECT'S PROJECT NO: 10497 DATE 4-15-88 TIME 12;05 P.M. WEATHER Cloudy TEMP. RANGE 440 - 370 EST. % OF COMPLETION 98% CONFORMANCE WITH SCHEDULE (+, -> -4 Weeks WORK IN PROGRESS PRESENT AT SITE L. Erik Van Cort, Kate Van Cort Ceiling pads are going in. Staining of wood door & frames is completed. Electrical contractor lamping fixtures in office. OBSERVATIONS Carpet has been ordered and will arrive next week, contractor is alerted to install ASAP. Brass entrance is completed, looks good. Sprinkler contractor has completed work and has pulled off job. Wood flooring is being installed in office foyer, should be complete by Monday. All contractor's working on "Punch-list" items. Site grading is being completed. Concrete patio is being completed this date. ITEMS TO VERIFY None INFORMATION OR ACTION REQUIRED Need to apply for Northampton final permits. r�s RED ARC Ora Cl V. S n ! , CO ATTACHMENTS None V r."� �� REPORT BY: G�iLt"ti � AIA DOCUMENT G711 • ARCHITECT'S FIELD REPORT OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages ARCHITECT'S OWNER ARCHITECT O FIELD REPORT CONSULTANT ❑ AIA DOCUMENT G711 FIELD 4o'' PROJECT: Van Cort Instruments, Inc. FIELD REPORT NO: 13 CONTRACT: 9-15-87 ARCHITECT'S PROJECT NO: 10497 DATE 4-1-88 TIME 10:00 A.M. WEATHER Clear/Cool TEMP. RANGE 520 - 320 EST. % OF COMPLETION 96% CONFORMANCE WITH SCHEDULE (+, -> -4 Weeks WORK IN PROGRESS PRESENT AT SITE Electrical and HVAC and Painting in office area. Final site grading is being done by Dietz. Wood doors, frames and hardware is going in office area. OBSERVATIONS HVAC contractor has replaced all filters in all RTU's. Owner started moving in equipment in plant area. Most of owner's equipment need to be wired by electrical contractor. This additional work is delaying electrical works in office. Owner is aware of this, should not create any problems. All office glazing has been completed and office casework is being installed. Painter hopes to stain casework over the week-end. As Having some difficulty in having drywall contractor man the job. JUN, IQRR ITEMS TO VERIFY Delivery date for "Brass entrance doors" INFORMATION OR ACTION REQUIRED Office carpet needs to be selected by owner. `s��REO AR�h'i No.06913 n ST.LOUIS, MO 4"'Y ATTACHMENTS None F REPORT BY: AIA DOCUMENT G711 • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION • AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages ARCHITECT'S OWNER CT � A FIELD REPORT CONSULTANT ❑ AIA DOCUMENT G711 FIELD PROJECT: Van Cort Instruments, Inc. FIELD REPORT NO: 12 CONTRACT: 9-15-87 ARCHITECT'S PROJECT NO: 10497 DATE 3-17-88 TIME 12:30 P.M. WEATHER Cloudy/L. Rain TEMP. RANGE 480 - 300 EST. % OF COMPLETION 95% CONFORMANCE WITH SCHEDULE (+, —4 Weeks WORK IN PROGRESS PRESENT AT SITE Plumber doing finish works in office. Electrical working on perimeter outlets and wiring RTU on office portion of project. HVAC is approximately 90% completed in office area. OBSERVATIONS Electrical contractor completed exterior building lights this week. Plumber was instructed to remove the water closets in office rest-rooms and install tank type water closets per design. Drywall contractor instructed to re-sand and re-putty several walls in office. This contractor's work leaves a lot to be desired. HVAC contractor waiting for delivery of controls for RTU's. Security man is installing systems in the office area. JUN 9 ITEMS TO VERIFY None INFORMATION OR ACTION REQUIRED HVAC contractor needs to replace all air D_AR�y, filters in all RTU prior to starting systems. cvq., ATTACHMENTS None . ? " REPORT BY: AIA DOCUMENT G711 • ARCHITECT'S FIELD REPORT OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages ARCHITECT'S OWNER CT O A FIELD REPORT CONSULTANT ❑ AIA DOCUMENT G711 FIELD PROJECT: Van Cort Instruments, Inc. FIELD REPORT NO: 11 CONTRACT: 9/15/87 ARCHITECT'S PROJECT NO: 10497 DATE 3%4/89 TIME 11:00 a.m. WEATHER Snowing — 3" TEMP. RANGE 32-28 EST. % OF COMPLETION CONFORMANCE WITH SCHEDULE (+, —) —4 weeks WORK IN PROGRESS PRESENT AT SITE Electricians wiring lights Sprinkler Contractor adjusting several Plumber doing rough-in in office of his heads to match ceiling elevations HVAC - ductwork proceeding in office Drywall framing 100% complete in office OBSERVATIONS Structural Systems is fixing dents in copper facade. Electricians wiring machinery for Owner in Machine Shop and Woodworking Shop. Pliimhor doing gaspiping in nffica fnr RTU's New England Telephone installed telephone lines into building this week. Electrical Inspector checked on office wiring and received an "OK". AN 9 ITEMS TO VERIFY Plumber needs to obtain inspection on Gas Piping. INFORMATION OR ACTION REQUIRED ✓�r�R�6 AR kr�e 4.�a V. �^ F� c I lo. 05913 m ATTACHMENTS �'. \, A'.O J' REPORT BY: 144 AIA DOCUMENT G711 ARCHITECT'S FIELD REPORT OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages ARCHITECT'S OWNER ARCHITECT O FIELD REPORT CONSULTANT ❑ AIA DOCUMENT G711 FIELD PROJECT: Van Cort Instruments, Inc. FIELD REPORT NO: 10 CONTRACT: 9-15-87 ARCHITECT'S PROJECT NO: 10497 DATE 2-19-88 TIME 4:00 P.M. WEATHER Clear/Cold TEMP. RANGE 41° — 17° EST. % OF COMPLETION 90% CONFORMANCE WITH SCHEDULE (+, —) —4 Weeks WORK IN PROGRESS PRESENT AT SITE L. Erik Van Cort Electrical being worked on in office. HVAC proceeding in office. Iron workers working on facade. Plumber testing gas piping in office. OBSERVATIONS Drywall contractor will complete drywall on this date in office. Sprinkler contractor (HFP) installing heads in office and (Western Mass. Acoustics) ceiling contractor installing grid in office area. Painter is making plans to (over the weekend) put prime coat on J of the office walls. All roof leaks have been repaired and work in office area is proceeding nicely. t E , ITEMS TO VERIFY None INFORMATION OR ACTION REQUIRED None ��REU AR0 V G o No. C,9".3 r ATTACHMENTS None REPORT BY: " AIA DOCUMENT G711 • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION AIA® • © 1972 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C.20006 page of pages ' I t 801 North Eleventh 314 436-7600 St.Louis,Missouri 63101 C o HP oR A r i o N JUN 9 , i � P June 7, 1988 o�aT.of su��ai� �.��certs r�orzm��r�ro�.�+�.oiosn Mr. William Nimohay Building Inspector City of Northampton 212 Main Street Northampton, Massachusetts 01060 Dear Mr. Nimohay: Please find enclosed with this brief letter the Architect Field Reports #9 thru 15 for the Van Cort Instruments, Inc., project located at 29 Industrial Drive East. As soon as the owner signs the Substantial Completion form, I will forward the certificate to your office. Also included for your use or file is a photo of the colored rendering of the project. I thought you and your office might find it interesting. If you need any further information, please do not hesitate to give me a call. Sincerely, L o J unz Projec Director LJK/kl Enclosure