Loading...
25A-179 (10) f � s � 3 r� a� z 1� i u t 4, ! d 13 3 A � * A Olt- r-_ -;�� �; k ��t � r * . CERTIFICATE OF Distribution to: r SUBSTANTIAL AOWNER CHITECT a COMPLETION CONTRACTOR p g ' 1%9 AIA DOCUMENT G704 OTHER ❑ �VL U DE HA PION MA. 01 60 PROJECT: Van Cort Instruments , Inc . P orporation (name, address) Northhampton , Massachusetts ARCHITECT'S PROJECT NUMBER: 10497 TO (Owner): CONTRACTOR:Sverdrup Corporation CONTRACT FOR: New Manufacturing Facility Van Cort Instruments , Inc . 29 Industrial Drive East Northhampton , MA 01060 CONTRACT DATE: September 15 , 1987 DATE OF ISSUANCE: May 31 , 1988 PROJECT OR DESIGNATED PORTION SHALL INCLUDE: Entire Facility The Work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof designated above is hereby established as which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below. DEFINITION OF DATE OF SUBSTANTIAL COMPLETION The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect when construction is sufficiently complete, in accordance with the Contract Documents, so the Owner can occupy or utilize the #ow Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents. A list of items to be completed or corrected, prepared by the Contractor and verified and amended by the Architect, is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work'in accordance with the Contract Documents. The date of commencement of warranties For items on the attached list will be the date of final payment unless otherwise agreed to in writing. i Sverdrup Corporation ARCHITECT Y DATE The Contractor will complete or correct the Work on the list of items attached hereto withi days from the above Date of Substantial Completion. Sverdrup Corporation 1.;27 CONTRACTOR BY 1, IfATE The Owner accepts the Work or designated portion thereof as substantially com and ill assume full possession thereof at 8 : 00 A .M. (time) on May 31 8 (date). VAN A- L OWNER OTE The responsibilities of the Owner and the Contractor f security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: (Note—Owner's and Contractors legal and insurance counsel s ould determine and review insurance requirements and coverage; Contractor shall secure consent of surety company, if any.) AIA DOCUMENT 0704 • CERTIFICATE OF SUBSTANTIAL COMPLETION • APRIL 1978 EDITION • AIA° C 1978• THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G704-1978