• Page 2 October 19,2004
1. Visual and audible trouble indicates by zone at the fire alarm
panel.
2, Trouble signal reports to U.L, Central Station.
f. All 120 Volt smoke detectors to be interconnected with-in each unit and
function independently from other units and building Fire Alarm System.
A. EQUIPMENT
1. Furnish and install a Fire-Lite model#MS5024-UD control panel.
2. Battery pack #PS 12120 for 60hrs standby.
3. Hom/Strobe unit #SSP241575.
4. Horn/Strobe Ext unit#SSP241575.
5. Knox Box 3200 Series.
6, 120 Volt System Sensor Interconnected Smoke Detectors with battery back-
up.
A. WIRING
1. Provide in accordance with the manufacturers instruction all wiring, conduit
and outlet boxes as required for the installation of a complete system as
described herein and shown in the drawings
2. Final connections between the equipment and the wiring shall be made under
the supervision of a representative of the manufacturer.
A. FINAL TEST
1. The 100% final testing of the system to be done at the completion of the
installation. A copy of the final test shall be submitted to the AHJ upon
completion.
Submitted by,
Peter ndry, P ident
P.01
w
OCT-19-04 03:46 PM
r
1. y L x*$ AhM Inc.
go Lymrltan fteet
& Hadley, MA. 0107541178
(413HMSM ,_- r,
w
F8K(413PUMMM
October 19,2004
Fire Alarm Narrative
Be RoundHill Road Condo-Project
A. GENERAL
1. Contractor shall furnish and install a complete system herein and as shown
on the drawings.
All Equipment shall be U.L, listed and all fire equipment shall meet the
requirments of NFPA 72.
B. SYSTEM OPERATION
1. The actuation of any automatic fire device shall cause the following:
a. All surpervised fire alarm homs and strobes to sound and flash.
b. Indicate the zone in alarm at the main control panel.
c. Notify the local fire department via dual line communicator.
d. Drill sequence of operation causes alarm mode of operation.
e. Trouble sequence of operation: System or circuit trouble causes the
following system operations: