25A-107 (7) 7i �; APR 1 7 2002
rsTc "�Lt;iNSYECTitstVS
6-APR-2002 09;47:09
Hampshire County Registry of Deeds
Marianne L. Donohue, Register of Deeds Receipt No: 168451
33 King Street
Northampton, MA 01060-3298
Name: CHRISTOPHER AOUADRO
Addr: 33 WILSON AVENUE
Receipt Type: OR NORTHAMPTON, MA 01060
Total Pages: 0003 Payment
Fee: $ 10.00 Fees Taxes
Tax: $ 0100 Cash: $ 0.00 $ 0.00
Misc: $ 20.00 Check: $ 30.00
Charge: $ 0.00 $ 0•D0
Charge Code:
Comment: FINDING RECORDING---355 BRIDGE STREET NORTHAMPTON
Receipted By: BETH
DOCUMENTS: 992211452 to 992211452 Status: PAID
Type Page Doc Mref Consider$ Record Fee Excise Tax Stat Misc Fee Record Date
'- - - --- ---- ----------- ----------- - Document# Book/No/Page Status
MIS3 003 0001 QOOQ 0.00 10.00 -- ------ ----------------- --------- --------------
Q.00 20.00 16-APR-2002 09:46 992211452 OR /660910314 INI7
Page 0001 of 0001
4C)
-XI
Now
Note:in all A Zones,the reference level is the top of the lowest floor,In V Zones the reference level irs the battom of the lowest
horizontal structural member(see diagram an page 2). Agents should refer to the Flood Insurance Manual for instruction an lowest
floor definition.
DIAGRAM NUMBER 5 DIAGRAM NUMBER 6
ALL BUILDINGS, INCLUDING MANUFACTURED(MOBILE) ALL BUILDINGS,INCLUDING MANUFACTURED(MOBILE)
HOMES ELEVATED ON PiERS,POSTS,COLUMNS,SHEAR HOMES ELEVATED ON PiERS,POSTS,COLUMNS,SHEAR
WALLS,WITH OR WITHOUT PARKING AREA BELOW - •WALLS,WITH OR WITHOUT PARKING AREA BELOW
ELEVATED FLOOR. ELEVATED FLOOR.
Distinguishing Feature-For all zones.:me area below the elevated floor Distinguishing Feature-For V Zones only,the area below the elevated
is open,with no obstruction to the How of Hood waters(open wood lattice floor is enclosed.either partially or h Ay,by solid breakaway walls."When
work or readily removable insect screening is permissible). enclosed area is greater than Sao square teat or contains equipment
servicing the building,use Oiagram Number 7:this will result in a higher
insurance rate.The enclosed area can be used for parking,building access
or limited storage.
HIGHER FLOORS HIGHER FLOORS
(IF.utYl (IFANY) i
i
'
ELEVATE
FIRST FtaOR EL'VA7c7
REFERENCE REFERENCE FIRST F=R
LEVEL
ENCLOSE?AAEA
DIAGRAM NUMBER 7 DIAGRAM NUMBER 8
ALL BUILDINGS, INCLUDING MANUFACTURED(MOBILE)
HOMES ELEVATED ON PIERS,POSTS,COLUMNS,SHEAR ALL BUILDINGS CONSTRUCTED ABOVE AN UNFINISHED
WALLS,SOLID NON-BREAKAWAY WALLS,WiTH OR SPACE,INCLUDING CRAWL SPACE.
WITHOUT PARKING AREA BELOW ELEVATED FLOOR.
Olsdriguishing Feature.Far all zones.the area below the elevated floor is Distinguishing Feature-For A Zones only,the area below the first floor is
enclosed,either partially or fully,by solid=-breakaway walls,at contains enclosed by solid or partial perimeter wails.is unfinished.and contains no
equipment servicing the building.For V Zones only,the area is enclosed. equipment servicing the structure.The area can be used for parking,
either partially or hilly,by solid breakaway wails"having an enclosed area building access,or limited storaga%
greater than 300 square feet. For A Zones only,with an area enclosed by
solid walls having proper openings,"'and used only for parking,building
access.or limited storage,use Oiagram Number 8 to determine the
reference level.
' HIGHER FLCCAS
HIGHER FLOORS (IF ANY)
(IF ANY)
GRADE
FIRST FLOOR
FIRSTF14 ENCLOSEp AREA AErEVEL
FIA�7 r.00A LEVEL
9==cRENCc - CRAWL SAACF. .
LEVEL
aaarngs
GRACE
Under the National Flood Insurance Program's risk dassificadan and insurance coverage, a floor that is below ground level(grade)on
all sides is considered a basement even though the floor is used for living purposes,or as an office,garage,workshop,etc.
Solid breakaway walls are walls that are not an integral part of the structural support of a building and are intended through thccir design
and construction to collapse under specific lateral loading forces, without causing damage to the elevated portion of the building or
supporting foundation.An area so enclosed is not secure against forceable entry.
If the area below the lowest floor is fully enclosed, then a minimum of two openings are required with a total net area at at least are
square inch for every square foot of area enclosed with the bottom of the openings no more than one foot above grade.Alternatively.
certification may be provided by a registered professional engineer or architect that the design will allow equalization of hydrosratic
flood forces an exterior walls.If neither of these criteria are met, then the reference level is the lowest grade adjacent to the structure.
Page 6
591117a s,_o
f A
, t
j INSTRUCTIONS
The following a diagrams contain descriptions of various types of buildings.Compare the features of your building with those shown in
the diagrams and select the diagram most applicable. Indicate the diagram number on the Elevation Certificate(Section C. Item t) and
complete the Certificate. The reference level floor is that level of the building used for underwriting purposes.
NOTE:In all A Zones,the reference level is the top of the lowest floor,in V Zones the reference level is the bottom of the lowest horizontal
structural member(see diagram on page 2). Agents should refer to the Flood insurance Manual for instruction on lowest floor definition.
DIAGRAM NUMBER 1 DIAGRAM NUMBER 2
ALL SINGLE AND MULTIPLE FLOOR BUILDINGS(OTHER ALL SINGLE AND MULTIPLE FLOOR BUILDINGS(OTHER THAN
THAN SPLIT LEVEL), INCLUDING MANUFACTURED(MOBILE) SPLIT LEVEL),INCLUDING MANUFACTURED(MOBILE)
HOUSING AND HIGH RISE BUILDINGS,EITHER DETACHED OR HOUSING AND HIGH RISE BUILDINGS.EITHER DETACHED OR
ROW TYPE(E.G-TOWNHOUSE, ETC.);WITH OR WITHOUT ROW TYPE(E-G.,TOWNHOUSES,ETC.);WITH OR WITHOUT
ATTACHED GARAGE. ATTACHED GARAGE.
Distinguishing Feature-The first floor is not below ground level(grade)on Distinguishing Feature-The first floor or basement(including an
all sides'.This includes.walkout"basements.where at least one side is at or underground garage')is below ground level(grace)on ail sides'.
above grade.(Not illustrated)
HIOI IER R=As
(IF ANY)
HIGHER FLOORS
1 (IF ANY)
1
FIRST FLCOA GRAOE
FIRST FLOOR GRACE
BASEMENT(INCLUGNG
UNOERGROUNO GARAG4) R7
*L
REFERENCE REFERENCE
LEVEL
(TOP OF FLOOR) rMPOFeASEE LEVEL T FLOOR')
DIAGRAM NUMBER 3 DIAGRAM.NUMBER 4
ALL SPLIT LEVEL BUILDINGS, EITHER DETACHED OR ROW ALL SPLIT LEVEL BUILDINGS,EITHER DETACHED OR ROW
TYPE(E.G.,TOWNHOUSES, ETC.);WITH OR WITHOUT TYPE(E.G.,TOWNHOUSES,ETC.);WITH OR WITHOUT
ATTACHED GARAGE. ATTACHED GARAGE
Distinguishing Feature-The lower level is not below ground level(grade)on Distinguishing Feature-The lower level(orintwrmediate level)is below
all sides'.This includes'walkout'basements,where at least one side is at or ground level(grade)on altsides'.
above grade.
hIGNER=.CCRS H/GHE-R P OCAS
HIGHER F CCRS HIGHER FLCCRS
(IF ANY) (IF Al`'.Y) IIF ANY) (IF ANY)
1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1
1 1
1 1
UPPE?wEL GAAOE UPPER LEVEL GRADE
GRACE INTF AMEr1IATE GRACE INTF:AMEDIAra-
LEVEL Le'EL
LOwE?L°_vcL LUwER LEVEL
AEF2==-Nce -
LEV REFERENCE
'TOP OF=tCCR1 LEVEL
(TOP OF BASEMENT FLOOR-1
'Under the r Iational Flood Insurance Program's risk classification and insurance coverage'.a floor that is below ground level
(grade)on all sides is considered a basament even though the floor is used for living purposes. or as an office.garage.
workshop. erc.
Page 5
SECTION C Building Elevation.information
Item 1.The E?evasion Certificate uses a building's reference level as the point for measuring its elevation. Pages 5 and 6 of'his Elevation .
Certificate package contain a series of eight diagrams of various building types that are to be used to help determine the reference level.
Choose the diagram that best represents this building,record the diagram number, and use the indicated reference level to measure the
elevation as requested in Items 2a-d.
Item 2 Depending on the property location's FIRM Zone,complete Item 2a.2b,2c, or 2d. Use the reference level shown in the
appropriate building diagram as the point of measurement. As shown in the diagram on the back of w e.Certificate,for ail A Zones,the
elevation should be measured at the top of the reference level floor. For all V Zones,the elevation should be measured at the bottom of
the lowest horizontal structural member of the reference level floor. Reporting of elevations in Items 2a and 2b should be to the nearest
tenth of a foot,or alternatively,unless prohibited by state or local ordinance,the reference level elevation may be rounded down"to the
nearest whole foot("rounding up"is prohibited).
item 2(a). For structures located in FiRM Zones Al-A30,AE,AH,and A(with SFE's),record the elevation(to the nearest tenth of a foot)
of the top of the floor identified as the reference level in the applicable diagram.
Item 2(b). For structures located in FIRM Zones V1430,VE,and V(with SFE's),record the elevation(to the nearest tenth of a foot)of the
bottom of the lowest horizontal structural member of the floor identified as the reference level in the applicable diagram.
Item 2(c). For structures located in FIRM Zone A(without BFE's),record the height(to the nearest tenth of a foot)of the top of the floor
indicated as the reference level (from the applicable diagram)above or below the highest adjacent grade immediately next to the building.
Item 2(d). For structures located in FiRM Zone AO,the FIRM will show the base flood depth. For locations in FIRM Zone AO record the
height(to the nearest tenth of a foot)of the top of the floor identified as the reference level(from the applicable diagram)above or below
the highest adjacent grade immediately next to the building. For post-FIRM buildings,the community's floodplain management ordinance
requires that this value equal or exceed the base flood depth provided on the FiRM. For those few communities where this base flood
depth is not available, the community will need to determine if the lowest floor is elevated in accordance with their floodplain management
ordinance.
Item 3. Record the vertical datum system used in identifying the reference level elevations for all buildings. If the datum used in measuring
the elevations is different than that used on the FiRM, then convert the elevations in Items 2a-d to the datum used on the FIRM,and show
the conversion equation under the Comments section on Page 2.
Item 4. Indicate if the elevation reference mark used appears on the FiRM. Reference marks other than those shown on the FiRM may be
used for elevation determinations. in areas experiencing ground subsidence, the most recently adjusted reference mark elevations must
be used for reference level elevation determinations.
Item 5. Indicate if the reference level used in making the elevation measurement is based an actual construction or construction drawings.
Construction drawings should only be used if the building does not yet have the reference level floor in place,in which C.Ise the Elevation
Certificate will only be valid for the building during the course of construction. A post-construction Elevation Certificate will be needed once
construction is complete.
Item 6. Record the elevation measurement of the lowest grade adjacent to the building(to the nearest tenth of a foot). Adjacent grade is
defined as the elevation of the ground,sidewalk, patio,deck support,or basement entryway immediately next to the structure. This
measurement should be to the nearest tenth of a foot if this Certificate is being used to support a request for a LOMAJLOMR.
SECTION D Community Information
Completion of this section may be required by the community in order to meet the minimum floodplain management requirements of the.
NFiR Otherwise, completion of this section is not required.
Item 1.The community's floodplain management ordinance requires elevation of the building's"lowest floor"above'the BF.E. For the vast
majority of building types, the reference level and the lowest floor will be the same. If the community determines that there is a
discrepancy, record the elevation of the lowest floor.
Item 2. Enter date. These terms are defined by local ordinance.
SECTION E Certification
Complete as indicated. The Elevation Certificate may only be signed by a land surveyor, engineer,or architect who is authorized by state
or bcai law to certify elevation information when the elevation information for Zones Al-A30,AE,AH,A(with SFE's), V1-V-2, VE, and V
(with SFE's}is required. Community officials who are authorized by local law or ordinance to provide floodplain management information
may also sign this certification. In the case of Zones AO and A(without BFE's), a building official,a property owner,or an owner's
representative may sign this certification.
Certification is normally to the information provided in Sections 8 and C. If the certifier is unable to certify to the selection of reference level
diagram 6, 7 or 8 (Section C, Item 1),e.g.,because of difficulty in obtaining construction or building use information needed to determine
the Distinguishing Feature(s), the cerifier.must list the Feature(s) excluded from the certification under Comments on Page.2. The
diagram number used for the Reference level must still be entered in Section C. Item 1.
page
THE NATIONAL FLOOD INSURANCE PROGRAM
ELEVATION CERTIFICATE
PURPOSE OF THE ELEVATION CERTIFICATE
The Elevation Certificate is an important administrative tool of the National Flood Insurance Program(NFIP).
As part of the agreement for making flood insurance available in a community,the NFIP requires the community to adopt a floodplain
management ordinance containing certain minimum requirements intended to reduce future flood losses. One such requirement is that
the community"obtain the elevation of the lowest floor(including basement),of all new and substantially improved structures,and maintain
a record of all such information." The Elevation Certificate is one.way for a community to comply with this requirement.
The Elevation Certificate is also required to properly rate post-FIRM structures,which are buildings constructed after publication of the
Flood Insurance Rate Map(FIRM),for flood insurance in FIRM Zones Al-A30,AE.AO,AH,A(with Base Flood Elevations[BFE's]),
V1 430.VE, and V (with BFE's). In addition,the Elevation Certificate is also needed for pre-FIRM structures being rated under past-FIRM
flood insurance rules.
Use of this certificate does not in any way alter the flood insurance purchase requirement The Elevation Certificate is only used to provide
information necessary to ensure compliance with applicable community floodplain management ordinances,to determine the proper flood
insurance premium rate,and/or to support a request for a Letter of Map Amendment or Revision(LOMA or LOMR).Only a LOMA or
LOMR from the Federal Emergency Management Agency(FEMA)can amend the FIRM and remove the Federal requirement for a
lending institution to require the purchase of flood insurance. Note that the lending institution may still require flood insurance.
This certificate is only used to certify the elevation of the reference level of a building. If a non-residential building is being flocdproofed,
then a Floodproofing Certificate must be completed in addition to certifying the building's elevation. Floodproofing of a residential building
does not alter a community's floodplain management elevation requirements or affect the insurance rating unless the community has been
issued an exception by FEMA to allow flocdproofed residential basements.
INSTRUCTIONS FOR COMPLETING THE ELEVATION CERTIFICATE
The Elevation Certificate is to be completed by a land surveyor,engineer,or architect who is authorized by state or local law to certify
elevation information when the elevation information for Zones Al-A30,AE,AH,A(with BFE's),V1 430,VE,and V(with BFE's)is
required. Community officials who are authorized by local law or ordinance to provide floodplain management information may also
complete this form. For Zones AO and A(without BFE's), a building official;.-.a property owner,or an owner's representative may also
provide the information on this certification.
SECTION A Property Information
The Elevation Certificate identifies the building,its owner and its location. Provide the building owner's name(s),the building's complete
street address, and lot and block number. If the property address is a rural route or PO box number,provide a legal description or an
abbreviated location description based on distance from a reference paint.
SECTION B Flood Insurance Rate Map Information
In order to property complete the Elevation Certificate,it is necessary'm locate the huild rig on-the appropriate FIRM,and record the.
appropriate information. To obtain a FIRM,contact the community or call 1-800-333-1363.
The Elevation Certificate may be completed based on either the FIRM in effect at the time of the certification or the FIRM in effect when
_construction of the building was started.
Items 1 -6. Using the FIRM Index and the appropriate FIRM panel far the community,record the community number, panel(or page)
number, suffix;and Index date. From the appropriate FIRM panel, locate the property and record the zone and the BFE(or flood depth
number) at the building site. SFE's are shown an a FIRM for Zones At-A30,AE,AH,V1430,and VE;flood depth numbers are shown
for Zone AO.
Item 7. Record the vertical datum system to which the elevations on the applicable FIRM are referenced. The datum is specified in the
upper right corner of the title block of the FIRM.
Item 8. In A or V Zones where BFc s are not provided on the FIRM, the community may have established SFE's based on data from other
sources. For subdivisions and other development greater than 50 lots or 5 acres, establishment of 3FE's is required by community
ftoodplain management ordinance. When this is the case,complete this item.
Page 3
SECTION E CERTIFICATION
This certification is to be signed by a land surveyor, engineer. or architect who is authorized by,state or local law to certify elevation
information when the elevation information for Zones Al-A30,AE,AH,A(with 8FE),V1-V30,VE. and V(with 8FE) is required.
Community officials who are authorized by local law or ordinance to provide floodplain management information, may also sign the
certification. In the case of Zones AO and A(without a FEMA or community issued 8FE),a building official, a property owner.or an
owner's representative may also sign the certification.
Reference level diagrams 6, 7 and 8-Oistinguishing Features-4f the certifier is unable to certify to breakaway/non-breakaway wall,
enclosure size, location of servicing equipment, area use,wall openings,or Unfinished area Feature(s),then list the Feature(s) not
included in the certification under Comments below. The diagram number,Section C, Item 1, must still be entered.
I certify that the information in Sections B and C on this certificate represents my best efforts to interpret the dat F.
I understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Sec6o
PAUL, L,U554ER- 9,L.S. Mk- 2g(.,48 P.
CERTIFIER'S NAME LICENSE NUMBER(or Affix Seal) �.29M
Ftzo JC-cr A%octATe5 Pw q
TITLE COMPANY NAME dyOpAt 4A�0
�v t Nf7USTi2l4t� f�fLtV;✓ Ets�T NJ0P-TNOMPIL) f�. O10
AOCRE - pp CITY STATE ZIP _
13.584 "14 4
SIGNATURE OATE PHONE
Copies should be made of this Certificate for: 1)community official, 2) insurance agent/company,and 3) building owner.
COMMENTS:
ON wrrH ON PfLES.
SLAB BASEMENT PIERS.OR COLUMNS
A v A A v
ZONES ZONES ZONES ZONES ZONES
REFAENC°
REf�:7ENCE �� I,NEL REFEr�E'{E
l.c DEL \ A000 L-NLL
\1 i ELEVArrlft
1
r
::. :•. ._
USE
aASE AoucEnr :: ''� REfEREr.cE Acco
Et.WPLC-o ON .... 6PAOE M ELNAi'ON
REFERENCE AOJACENr j/
LEVEL GRACE
ACdACENT
GRACe
The diagrams above illustrate the points at which the elevations should be measured in A Zones and V Zones.
Elevations for all A Zones should be measured at the top of the reference level floor.
Elevations for all V Zones should be measured at the bottom of the lowest horizontal structural member.
Page 2
' Expie.Na3°6'-°°u
ELEVATION CERTIFICATE Expires May 31, 1993
FEDERAL EMERGENCY MANAGEMENT AGENCY
NATIONAL FLOOD INSURANCE PROGRAM
ATTENTION: Use of this certificate does not provide a waiver of the flood insurance purchase requirement. This form is used only to
provide elevation information necessary to ensure compliance with applicable community floodplain management ordinances. to
determine the proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Revision (LOMA or LOMR).
Instructions for completing this form can be found on the following pages.
SECTION A PROPERTY INFORMATION FOR INSURANCE COMPANY USE
BUILDING OWNFA*S NAME POUCY NUMBER
MC*E WAY FLAZA CONDOMIM LAM
STREET ADDRESS(Including Apt.Unit.Suite and/or Bldg.Numoer)OR P.O.ROUT;AND BOX NUMBER COMPANY NAIC NUMBER
OTHER DESCRIPTION(Lot and Black Numbers.etc-)
M11ff%0 KS M,6,0 2S A l-LIT t c)–(
CiTY STATE ZIP CODE
N0?:TqAM9T0t1) MA t 0GO
SECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION
Provide the following from the proper FIRM (See Instructions):
1.COMMUNITY NUMBER Z.PANEL NUMBER ].SUFFIX 4.DATE OF FIRM INOEX 5.FiRM ZONE 6.BASE FL000 ELEVATION
(in AO Zones,use cepm)
2
so t (0-1 U 00 2 A Apr; l 3 , 1q1 A S 3 L 25
7. Indicate the elevation datum system used on the FIRM for Base Flood Elevations(BFE): !1 NGVD'29 _Other(describe on back)
8. For Zones A or V,where no BFE is provided on the FIRM,and the community has established a BFE for this building site,indicate
the community's BFE:' 1 i I i l.L!feet NGVD (or other FiRM datum–see Section 8, Item 7),
SECTION C BUILDING ELEVATION INFORMATION
1. Using the Elevation Certificate Instructions, indicate the diagram number from the diagrams found on Pages 5 and 6 that best
describes the subject building's reference level I .
2(a). FIRM Zones Al-A30,AE,AH, and A(with BFE'. The top of the reference level floor from the selected diagram is at an elevation
of` I 111-2- .!0! feet NGVD (or other FIRM datum--see Section B, Item 7).
(b). FIRM Zones V1 430, VE, and V(with BFE). The bottom of the lowest horizontal structural member of the reference level from
the selected diagram, is at an elevation of _''feet NGVD (or other FiRM datum–see Section B, Item 7).
(c). FIRM Zone A (without BFE). The floor used as the reference level from the selected diagram is _feet above- or
below'! (check one) the highest grade adjacent to the building.
(d). FIRM Zane AO. The floor used as the reference level from the selected diagram is `feet above'' or below (check
one) the highest grade adjacent to the building. if no flood depth number is available, is the building's lowest floor(reference
level) elevated in accordance with the community's floodplain management ordinance? _ Yes No 7' Unknown
3. Indicate the elevation datum system used in determining the above reference level elevations:ZNGVO'29 _ Other(describe
under Comments on Page 2). (NOTE: If the elevation datum used in measuring the elevations is different than that used on
Me FIRM [see Section S,Item 77, then convert the elevations to the datum system used on the FIRM and show the conversion
equation under Comments on Page 2.)
4. Elevation reference mark used appears on FIRM: Yes -No (See Instructions on Page 4)
5. The reference level elevation is based on: _ actual construction 2rconstruction drawings
(NOTE.- Use of construction drawings is only valid if the building does not yet have the reference level floor in place, in which
case this certificate will only be valid for the building during the coursa of construction. A post-construction Elevation Certificate
will be required once construction is complete.)
S.The elevation of the lowest grade immediately adjacent to the building is:` t f21 (.a feet NGVD(or other FIRM datum-see
Section B, Item 7).
SECTION D COMMUNITY INFORMATION
1. If the community official responsible for verifying building elevations specifies that the reference level indicated in Section C, Item 1
is not-the "lowest floor" as defined in the community's ftoodplain management ordinance, the elevation of the building's"lowest
floor" as defined by the ordinance is: ' ' ' I : feet NGVD (or other FIRM datum–see Section 8, Item 7).
2. Date of the start of construction or substantial improvement
REPLACEV!0JS c'] ' 0•' SEE ?S=5;0E 5;0E=0R CONTIw ATICN
FEMA Form 8t-3i�MAY 9D -'S AL_?a
PAPERWORK BURDEN DISCLOSURE NOTICE �
GENERAL-This information is provided pursuant to Public Law 96-511,(The Paperwork Reduction
Act of 1980,as amended),dated December 11, 1980, to allow the public to participate more fully and
meaningfully in the Federal paperwork review process.
AUTHORITY-Public Law 96-511,amended; 44 U.S.C. 3507; and 5 CFR 1320
DISCLOSURE OF BURDEN- Public reporting burden for the collection of information entitled
"Post-Construction Elevation Certilicate/Floodproofing Certificate"(FEMA Form 81-31 and 81-65) is
estimated to average 12 minutes per response,including the time for reviewing instructions,
searching existing data sources,gathering and maintaining the data needed,and completing and
reviewing the forms. Send comments regarding the burden estimate or any aspect of the collection,
including suggestions for reducing the burden, to: Information Collections Management,Federal
Emergency Management Agency,500 C Street,S.W. 20472; and to the Office of Management and
Budget,Paperwork Reduction Project(3067-0077),Washington, D.C. 20503.
r
` APR 1 7 2002
MA 010E6
nk 'C.F(.°,�_i;'R�G i1v�PECTPGiY:;
FEDERAL EMERGENCY MANAGEIENT AGENCY
NATIONAL FLOOD INSURANCE PROGRAM
ELEVATION CERTIFICATE
Al\M
INSIR[_T(MONS