25A-185 (22) ALLIED TESTING LABORATORIES, INC. 115 St. George Road e Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Fax: (413) 736-1838 CONCRETE FIELD REPORT NO. 69 DATE: 9/22/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center - Freezer Cooler Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Cooler Slab Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 9/22/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 10:00 134 3500 4" Cooler Slab SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 10:00 134 4" 74°F 72°F 2.6 Weather: Fair Temp: 74°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Fax: (413) 736-1838 CONCRETE FIELD REPORT NO. 68 DATE: 9/21/95 Client. Facility Constructors, Inc. rr° ' Project: Coca Cola Bottling & Distribution Center - Freezer Co Contractor: DOS Concrete �� 2 Producer: Construction Service . Location of Concrete Placement: Freezer Slab ,,, , Mr{ Reported to: Facility Constructors, Inc. - At;tention: Mr. John Newto CYLINDER FABRICATION DATE CAST: 9/21/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 08:15 260 3500 3 1/2" Freezer Slab SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. 7 Air 08:15 260 3 1/2" 60°F 74°F 2.4 Weather: Cloudy Temp: 60°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 67 DATE: 8/8/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center - Freezer Cooler Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Piers, Freezer Cooler Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 8/8/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 13:50 112 3000 2" Piers, Freezer Cooler SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. 7 Air 13:50 112 2" 82°F 78°F 3.8 Weather: Clear Temp: 82°F No. Yds: 2 Respectfully submitted, ALLIE I TORIES, INC. I�� By: Chester V. Dawicki Director of Testing Services Copy: n k Mr. A. Patillo, City of Northampton Bldg. Dept. N Mr. J. Sullivan, Coca Cola Construction Site , MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. s` ALLI D TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (4 13) 736-1846 tuT CONCRETE! FE ,D RPORT:,i ®. ,v . . ,. 66 lt4p • .8/4/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center - Cooler Freezer Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Cooler Freezer, Ramp Slab and Foundation Wall Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 8/4/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set 411-A,B,C,D 09:00 260 3500 1} 3" Ramp Slab to Cooler Freezer Set 112—A,B,C,D 14:00 260 3000 2 1/2" Foundation Wall, Cooler Freezer SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 09:00 260 3" 85°F 80°F 2.2 14:00 260 2 1/2" 90°F 84°F 4.6 Weather: Pt. Sunny Temp: 85-90°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 65 DA 3/9 ry Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, Mtn Contractor: DOS Concrete , Producer: Construction Service Location of Concrete Placement: Apron Replacement Slab Li�i t-tl? i•.3 `r �4 phi. :rf !�S Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 8/3/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 07:30 259 4000 4" Apron Replacement Slab SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 07:30 259 4" 70°F 81°F 4.6 Weather: Cloudy Temp: 70°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 15 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 64 $/2/95 Client: Facility Constructors, Inc. ° Project: Coca Cola Bottling & Distribution Center, Northampton, MA F it i1 Contractor: DOS Concrete Producer: Construction Service i ; ls 8 Location of Concrete Placement: East Apron Slab over New Sewage Line `' Reported to: Facility Constructors, Inc. — Attention: Mr. John Newton DE"!0V` ` ` ) CYLINDER FABRICATION DATE CAST: 8/2/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B.C.D 09:30 245 4000 4" East Apron Slab Over New Sewage Line SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Cone. Temp. 7 Air 09:30 245 4" 90°F 86°F 5.4 Weather: Sunny Temp: 90°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 63 DATE:; Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA °m„r-°-° Contractor: DOS Concrete .4 Producer: Construction Service Location of Concrete Placement: Apron over New Sewage Lines `' Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton -:2 rcn CYLINDER FABRICATION °C-' ' DATE CAST: 8/1/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 09:30 260 4000 3 1/2" Apron over New Sewage Lines SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 09:30 260 3 1/2" 95°F 84°F 5.4 Weather: Sunny Temp: 95°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site 1,A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 62 DATE: '95. Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center- Freezer Cooler Building Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Foundation Walls, Cooler Freezer Building Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 7/31/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 11:30 245 3000 4" Foundation Walls, Cooler Freezer Building SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 11:30 245 4" 90°F 84°F 5.0 Weather: Sunny Temp: 90°F No. Yds: 15 REMARKS: Reinforcing incorporated in today's placement was found to be in accordance with Drawing #RO1. j d Respectfully submitted, ALLIED TESTING LABORATORIES, INC. to ,,, �n A By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. r INC. ALLIED TESTING LABORATORIES, 115 St. George Road • Springfield, Massachusetts 01 104 R I Phone: (413) 736-1846 61 DATE: X7112/95 CONCRETE FI�¢ Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Footings, Freezer Cooler Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 7/12/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 09:30 124 3000 31 'aotings, Freezer Cooler SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. 7 Air 09:30 124 3" 70°F 76°F 4.0 Weather: Clear Temp: 70°F No. Yds: 12 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. r, By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRE E 60 DATE: _7 f 1U/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Footings for Freezer Cooler, Lines J & 2.9 and Walls for ramp to Freezer Reported to: Facility Constructors, Inc. — Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 7/10/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 14:00 124 3000 Vootings, for Freezer Cof' er,ti Lines J & 2.9 and Walls for Ramp to Cooler SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 14:00 124 3" 80°F 75°F 4.6 Weather: Fair Temp: 80°F No. Yds: 14 REMARKS: Reinforcing incorporated in today's placement found to be in accordance with Drawing #ROl. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. 44;,yz, By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 59 DATE,,*, . 6/20/95 r: Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: South Apron Slab @ Loading Docks - 5th and Last Pour Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 6/20/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 09:00 158 4000 3 1/2" South Apron Slab @ Loading Dock: 5th and Last Pour Set #2-A,B,C,D 11:30 260 4000 4" Same SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 09:00 158 3 1/2" 80°F 74°F 5.4 11:30 260 4" 90°F 76°F 5.8 Weather: Sunny Temp: 80-90°F No. Yds: 110 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 58 .' b Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: South Aprin Slab at Loading Docks - 4th Pour Reported to; Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 6/19/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 08:30 257 4000 3 1/2" South Apron Slab @ Loading Docks 4th Pour Set #2-A,B,C,D 11:30 248 4000 4" Same SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 08:30 257 3 1/2" 85°F 72°F 5.4 11:30 248 4" 88°F 74°F 5.0 Weather: Sunny Temp: 85-90°F No. Yds: 105 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. z~ i� •,1 i3 'V.4"i�' - By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. T4r ALLIED TESTING LABORATORIES, INC. I I S St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 57 DATE: 6/16/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete �, (�7 �!p �r� �F` k Producer: Construction Service Location of Concrete Placement: South Apron Slab - 3rd Pour j ,UN 2 0199: Reported to: Facility Constructors, Inc. - Attention: Mr. John Newt6 OF 801L0!tit ,�ORTHPg CYLINDER FABRICATION DATE CAST: 6/16/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 09:00 262 4000 3 1/2" South Apron Slab 3rd Pour Set #2-A,B,C,D 11:00 250 4000 4" South Apron Slab 3rd Pour SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 09:00 262 3 1/2" 65°F 68°F 5.6 11:00 250 4" 75°F 70°F 5.2 Weather: Sunny Temp: 65-75°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 56 DATE: 6/15/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: South Apron Slab at Loading Docks — 2nd Pour Reported to: Facility Constructors, Inc. — Attention: Mr. John NewtCV7i- CYLINDER FABRICATION DATE CAST: 6/15/95 s I`plNGit v p�� QRIHRMPSbW hv (,i�� ' IDENTIFICATION TIME TRUCK CLASS SLUMP EX LOCATION A,B,C,D 10:00 261 4000 3" South Apron Slab @ Loading Docks 2nd Pour SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slum Air Temp. Cone. Temp. Z Air 10:00 261 3" 60°F 68°F 5.0 Weather: Sunny Temp: 60°F Respectfully submitted, ALLIED TESTING LABO,rR�ATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 55 DATE: ' + 95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: South Apron Slab at Loading Docks - 1st Pour Reported to: Facility Constructors, Inc. - Attention: Mr. John N n s CYLINDER FABRICATION L 0 Z-�. � i DATE CAST: 6/14/95 `OZ.;! E:;,t1fy$ DEPT OF BUy.. NORTi�ki" Itl Nik ViI060 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 10:00 124 4000 " " ` South Apron Slab @ Loading Docks lst Pour SLUMP TESTS TI;"IPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. 7 Air 10:00 124 3 1/2" 55°F 68°F 5.4 Weather: Cloudy Temp: 55°F No. Yds: 45 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED I U I INCA LAbUK.A 1 VKItJ, IN'k.. 115 St. George Road .Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 54 DATE: 6/13/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: South Apron @ Drain Slab; Hot-box Slab Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 6/13/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 09:30 252 4000 3 1/2" South Apron @ Drain Slab; Hot-Box Slab SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 09:30 252 3 1/2" 60°F 66°F 4.6 Weather: Cloudy/Rain Temp: 60°F No. Yds: 35 1 , Respectfully submitted, 5 ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road i Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 53 DATE: 6/9/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Slab at South Retaining Wall Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 6/9/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 09:00 261 4000 4" Slab-South Retaining Wall SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. 7 Air 09:00 261 4" 65°F 70°F 4.2 Weather: Fair Temp: 65°F No. Yds: 22 Respectfully submitted, ALLIED TESTING L BO RATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road *Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRET ELI)Akkiw( . 52 DATE: 6/6/95 Client• DEPT G li�1r G fNSPEt,Ti�JNS NNR A fi tors, Inc. Project. oca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Driveway Strip at Underground Fire Loop Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 6/6/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 11:30 112 4000 3 1/2" Driveway Strip at Underground Fire Loop SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 11:30 112 3 1/2" 80°F 74°F 5.0 Weather: Fair Temp: 80°F No. Yds: 5 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George R • is 01 104 CONCRETE FIELD REPORT NO. 51 61995 513JI95 DEPT Of BUILDING INSPECTIONS Client: Facility Constructors, Inc. NORTHAMPrON MAOIG60 Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Retaining Wall - South Loading Dock Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 5/31/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 11:30 250 3000 " Retaining Wall-South Loading Dock SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 11:30 250 4" 80°F 70°F 4.8 Weather: Fair Temp: 80°F No. Yds: 36 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 50 DATE: 5/2,6/9 5 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Service Location of Concrete Placement: Footing for Retaining Wall, South Loading Dock Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 5/26/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 11:45 261 3000 l/Z" Footing for Retaining Wall South Loading Dock SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 11:45 261 3 1/2" 65°F 68°F 4.0 REMARKS: 1. Rebar installed per drawing submitted by DOS to Faciity on 5/22/95. No. Yds: 25 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. Slab On Grade Facility Group Coca Cola Northampton 5-24-95 J.5-M 1-4 Truck# Time Batched Time Job Time Mixing Time Pouring Time Finished Slump. 259 5:00 5:30 5 to 10 min 5:30 5:40 262 5:00 5:45 5:45 6:00 2 260 5:10 5:50 5:50 6:05 257 5:20 6:15 6:15 6:25 21/2 144 5:25 6:30 6:30 6:40 3 245 5:30 6:25 6:30 6:45 156 5:45 6:35 6:40 6:50 21/2 261 5:50 6:35 6:45 6:55 131 6:00 6:45 6:50 7:00 3 132 6:05 6:50 6:55 7:05 128 6:10 7:00 7:00 7:10 31/2 262 6:45 7:05 7:05 7:20 125 6:30 7:10 7:10 7:20 3 127 6:35 7:15 7:20 7:35 259 7:00 7:20 7:30 7:35 21/2 254 7:10 7:30 7:30 7:45 126 7:20 7:35 7:40 7:55 3 250 7:30 7:40 7:45 7:55 112 7:00 7:45 7:55 8:05 31/2 245 7:45 8:00 8:00 8:10 144 7:55 8:05 8:00 8:20 3 156 7:55 8:10 8:20 8:30 261 8:00 8:15 8:25 8:40 23/4 132 8:10 8:10 8:40 8:50 131 8:15 8:25 8:45 9:00 21/2 128 8:20 8:30 8:50 9:05 125 8:30 8:40 9:05 9:30 3 126 8:50 1 9:00 1 9:10 10:00 ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 49 DATI 5114/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: S-F Concrete Producer: Construction Service Location of Concrete Placement: Slab on Grade, Lines J.5-M, 1-4 REPORTED TO: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 5/24/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set 411-A,B,C,D 06:15 257 3500 � I/2" Slab on Grade, Lines J.5-L, 3-4 Set 412-A,B,C,D 06:30 144 3500 3" Slab on Grade, Lines L-M, 3-4 Set 413-A,B,C,D 06:45 261 3500 3 1/2" Slab on Grade, Lines J.5-L, 2-3 Set #4-A,B,C,D 07:30 259 3500 2 1/2" Slab on Grade, Lines L-M, 2-3 Set 415-A,B,C,D 08:00 144 3500 2" Slab on Grade, Lines J.5-L, 1-2 Set 416-A,B,C,D 09:00 131 3500 3" Slab on Grade, Lines J.5-M, 1-2 Set 417-A,B,C,D 09:15 125 3500 2 3/4" Slab on Grade, Lines J.5-M, 1-2 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. 7 Air 06:15 257 2 1/2" 62°F 66°F 1.5 06:30 144 3" 62°F 64°F 1.2 06:45 261 3 1/2" 62°F 65°F 1.8 07:30 259 2 1/2" 62°F 63°F 1.4 08:00 144 2" 62°F 64°F 1.1 09:00 131 3" 62°F 66°F 1.5 09:15 125 2 3/4" 62°F 68°F ' REMARKS: 1. Temperatures inside building ranged from 600-70°F. 'A AY ',,'1 0f ;t DEPT OF BUILDMG INuPECJKJdS Respectfully submit e , NORTHAN;Pt01d CvEAC165fl ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER. A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. Lines Facility Group Coca Cola Northampton 5-23-95 M-P J.5-M 1-5 4-5 Truck# Time Batched Time @ Job Time Mixing Time Pouring Time Finished Slump. 261 5:00 5:45 5 to 10 min 5:50 6:00 3 262 4:50 5:40 6:00 6:10 245 5:15 6:00 6:05 6:15 21/2 257 5:20 6:10 6:10 6:25 156 5:30 6:15 6:15 6:30 31/2 144 5:45 6:30 6:35 6:45 125 5:55 6:45 6:45 7:00 3 261 6:30 6:40 6:45 7:05 262 6:35 6:45 6:50 7:00 21/2 245 6:45 6:55 7:00 7:10 131 6:50 7:00 7:05 7:15 259 6:55 7:05 7:10 7:20 3 132 7:00 7:10 7:10 7:20 197 6:30 7:15 7:20 7:35 31/2 174 6:30 7:20 7:25 7:40 254 7:10 7:25 7:25 7:35 2 137 6:45 7:30 7:35 8:00 250 7:10 7:25 7:40 8:05 23/4 165 6:45 7:30 7:45 8:15 156 7:10 7:30 8:10 8:25 2 251 7:30 7:45 8:15 8:35 245 7:45 8:05 8:20 8:35 21/2 132 7:50 8:10 8:35 8:40 260 8:10 8:30 8:30 8:40 3 125 8:20 8:40 8:45 8:55 131 8:40 8:50 9:00 9:10 31/2 259 8:55 9:10 9:15 9:25 197 9:10 9:20 9:20 9:35 254 9:20 9:30 9:30 9:45 2 174 9:30 9:45 9:45 10:00 137. 9:40 , 9:55. . 9:55 10:10. 3 250 10:00 10:15 10:20 10:35 156 10:15 10:30 10:35 10:50 21/2 132 10:25 10:45 10:50 11:15 165 10:35 10:50 11:00 11:20 31/2 245 10:45 11:00 11:05 11:30 125 11:00 11:15 11:20 11:35 31/2 131 11:20 11:35 11:40 12:00 144 11:30 11:45 11:50 1210 3 259 11:35 11:50 12:00 12:20 197 11:45 12:00 12:10 12:30 31/2 174 11:50 12:05 12:10 12:35 254 12:00 12:15 12:20 12:40 21/2 137 12:10 12:30 12:30 1:00 132 12:20 12:40 12:40 1:15 3 156 12:40 1:00 1:05 1:35 ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 48 E: 5J23/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: S-F Concrete Producer: Construction Service Location of Concrete Placement: Slab on Grade, Lines M-P, 1-5 Reported to: Facility Constructors, Inc. - Attention: Mr. John Sheridan CYLINDER FABRICATION DATE CAST: 5/23/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set 411-A,B,C,D 06:10 245 3500 1/2" Slab on Grade, Lines K-L, 4-5 Set 412-A,B,C,D 06:30 156 3500 �" to Lines L-M, 4-5 Set 413-A,B,C,D 06:45 144 3500 3 1/2" to Lines M-N, 4-5 Set 414-A,B,C,D 07:10 259 3500 2 1/2" it it Lines N-P, 4-5 Set 415-A,B,C,D 07:30 132 3500 2" Lines M-N, 3-4 Set 416-A,B,C,D 08:00 250 3500 3" Lines N-P, 3-4 Set 417-A,B,C,D 09:00 131 3500 3 1/2" it Lines M-N, 2-3 Set 418-A,B,C,D 09:30 254 3500 2 3/4" of Lines N-P, 2-3 Set 419-A,B,C,D 10:15 156 3500 3" Lines M-P, 1-2 Set 4110-A,B,C,D 11:10 245 3500 3" Lines " it Set 4111-A,B,C,D 12:20 197 3500 2 1/2" " Lines " SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck slump Air Temp. Conc. Temp. % Air 06:10 245 2 1/2" 54°F 63°F 1.2 06:30 156 3" 54°F 62°F 1.4 06:45 144 3 1/2" 54°F 64°F 1.2 07:10 259 2 1/2" 54°F 65°F 1.1 07:30 132 2" 54°F 62°F 1.6 08:00 250 3" 54°F 65°F 1.5 09:00 131 3 1/2" 54°F 66°F 1.6 09:30 254 2 3/4" 54°F 65°F 1.40 10:15 156 3" 60°F 68°F 1.2 11:10 245 3" 60°F 66°F 1.6 " 12:20 197 2 1/2" 64°F 68°F REMARKS: 1. Temperatures inside building ranged from 550-65°F wja' U� Respectfully subm''> � ALLIED TESTING LAB � 'j�NC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. Slab Facility Group Coca Cola Northampton 5-22-95 P-R 1-5 Truck# Time Batched Time @ Job Time Mixing Time Pouring Time Finished Slump. 262 5:35 6:10 5 to 10 min 6:30 6:40 21/2 261 5:30 6:00 6:30 6:45 245 5:35 6:05 6:40 6:50 21/2 259 5:40 6:10 6:30 6:50 254 5:45 6:20 6:35 6:45 132 5:50 6:30 6:45 6:55 3 257 6:05 6:35 6:55 7:05 250 6:10 6:50 6:50 7:15 2 314 .144 6:15 7:00 7:05 7:15 245 7:00 7:15 7:20 7:30 21/2 156 7:05 7:20 7:30 7:40 261 7:10 7:30 7:40 7:45 31/2 131 7:00 7:35 7:35 7:45 129 6:45 7:30 7:45 7:55 3 125 7:30 8:00 8:05 8:15 137 7:15 8:05 8:10 8:20 21/2 197 7:20 8:05 8:05 8:15 259 8:00 8:10 8:15 8:25 31/2 132 8:05 8:15 8:20 8:25 165 7:40 8:15 8;25 8:35 3 254 8:10 8:25 8:30 8:45 128 8:15 8:30 8:35 8:50 3 257 8:25 8:40 8:45 8:55 _ 134 8:00 8:40 8:45 8:55 _ 31/2 245 8:25 8:35 8:55 9:05 123 8:15 8:40 9:00 9:15 261 8:30 8:55 9:05 9:20 23/4 131 8:40 9:00 9:15 9:30 129 8:45 9:05 9:20 9:35 21/2 125 8:50 9:10 9:20 9:30 23/4 137 9:00 9:15 9:35 9:50 132 9:15 9:30 9:55 10:05 2 197 9:20 9:30 9:40 9:55 259 9:30 9:40 9:55 10:10 2112 165 9:40 9:50 10:10 10:20 128 9:50 10:05 10:20 10:35 3112 134 10:15 10:30 10:35 10:55 123 10:30 10:40 10:55 1 11:15 1 3 ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 47 E: 5/22/65 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: S-F Concrete Producer: Construction Service Location of Concrete Placement: Slab on Grade, Lines P-R, 1-5 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 5/22/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 06:45 132 3500 311 + Slab on Grade, Lines P-Q, 4-5 Set #2-A,B,C,D 07:10 257 3500 2" Slab on GRade, Lines Q-R, 4-5 Set X13-A,B,C,D 07:30 245 3500 2 1/2" Slab on Grade, Lines P-Q, 3-4 Set 414-A,B,C,D 07:45 129 3500 3" Slab on Grade, Lines Q-R, 3-4 Set #5-A,B,C,D 08:30 254 3500 2 1/2" Slab on Grade, Lines P-Q, 2-3 Set #6-A,B,C,D 09:15 261 3500 2" Slab on Grade, Lines P-Q, 2-3 Set #7-A,B,C,D 09:45 125 3500 3" Slab on Grade, Lines P-Q, 1-2 Set #8-A,B,C,D 11:00 123 3500 31/2" Slab on Grade, Lines Q-R, 1-2 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck slump Air Temp. Conc. Temp. % Air 06:40 245 2 1/2" 60°F 66°F 1.6 06:45 132 3" 60°F 64°F 1.4 07:10 257 2" 60°F 66°F 1.2 07:30 245 2 1/2" 60°F 68°F 1.5 07:45 129 3" 60°F 62°F 1.6 08:30 254 2 1/2" 60°F 63°F 1.1 09:15 261 2" 63°F 65°F 1.3 09:45 125 3" 63°F 68°F 1.8 , 11°00 123 3 1/2" 63°F 64°F 1.5 15 � JJJ sa REMARKS: "? ; 1. Temperatures inside building ranged from 600-70 0F. °• qj Respectfully subm�tte �W611«'Q `r-1tlPaF` ALLIED TESTING LAB CRIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. ' 46-B DATE 95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Service; Inc. Producer: Willard Concrete Location of Concrete Placement: North Exterior Apron @ Loading Docks, Center Strip Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 5/19/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 09:00 6 4000 3 1/2" North Exterior Apron @ Loading Docks, Center Strip Set 112-A,B,C,D 11:30 3 4000 3 1/2" Same as above SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck slump Air Temp. Conc. Temp. % Air 09:00 6 3 1/2" 55°F 62°F 5.2 11:30 3 3 1/2" 55°F 66°F 5.8 REMARKS: 1. Outside Temperatures ranged from 500-65 0F. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. Lines Facility Group Coca Cola Northampton 5-19-95 N-R 5-8 Truck# Time Batched Time @ Job Time Mixing Time Pouring Time Finished Slump. 245 5:40 6:20 5 to 10 min 6:20 6:35 21/2 262 5:30 6:15 6:20 6:30 260 5:35 6:25 6:25 6:35 3 125 5:50 6:30 6:35 6:45 259 6:00 6:40 6:40 6:50 23/4 250 6:05 6:55 7:00 7:10 251 6:10 7:00 7:10 7:15 2 133 6:20 7:10 7:15 7:30 144 6:30 7:15 7:20 7:30 21/2 260 7:00 7:20 7:30 7:40 245 7:15 7:30 7:35 7:50 3 128 7:30 7:40 7:40 7:55 261 7:30 7:40 7:45 7:55 125 7:25 7:45 7:50 8:00 31/2 132 7:30 7:50 7:55 8:05 260 7:30 8:05 8:05 8:10 3 111 7:50 8:05 8:10' 8:25 126 7:40 8:10 8:25 8:35 21/2 259 7:30 8:10 8:15 8:25 137 7:35 8:15 8:30 8:40 3 167 7:30 8:20 8:30 8:45 165 7:50 8:25 8:40 8:50 3 134 7:45 8:30 8:35 8:45 133 8:30 8:45 8:45 8:50 21/2 144 8:20 8:40 8:45 8:55 123 8:00 8:45 8:50 9:05 3 260 8:30 8:45 8:50 9:00 245 8:40 8:50 9:05 9:20 21/2 251 8:45 8:50 9:10 9:20 128 8:50 8:55 9:20 9:30 31/2 125 9:00 9:15 9:30 9:40 132 9:10 9:20 9:35 9:45 31/2 261 9:10 9:15 9:40 9:50 259 9:20 9:30 9:45 10:00 3 126 9:25 9:45 9:55 10:10 137 9:50 10:10 10:10 10:25 3 167 9:55 10:15 10:25 10:45 133 10:05 10:15 10:40 10:50 21/2 131 10:30 10:45 11:00 11:10 132 11:00 11:10 11:10 11:30 3 260 11:30 11:45 11:50 1 12:10 ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 46-A DATE. Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, Contractor: S-F Concrete -` Producer: Construction Service Location of Concrete Placement: Slab on Grade, Lines N-R, 5-8 I; "SAY 2 5 W Reported to: Facility Constructors, Inc. - Attention: Mr. John Newt )n DEPT i-! SUILD!NG I7FF-C7: CYLINDER FABRICATION NORTHAMPTON MA 01060 DATE CAST: 5/19/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set 411-A,B,C,D 06:45 262 3500 3" Slab on Grade, Lines Q-R, 7-8 Set 412-A,B,C,D 07:00 245 3500 2 3/4" Slab on Grade, Lines Q-R, 7-6 Set 413-A,B,C,D 07:15 144 3500 3" Slab on Grade, Lines Q-R, 6-7 Set 414-A,B,C,D 07;45 261 3500 2 3/4" Slab on Grade, Lines Q-R, 5-6 Set 415-A,B,C,D 08:00 125 3500 3 1/2" Slab on Grade, Lines P-Q, 5-6 Set 416-A,B,C,D 08:45 165 3500 3" Slab on Grade, Lines N-D, 5-6 Set 417-A,B,C,D 09:00 123 3500 2 1/2" Slab on Grade, Lines N-P, 7-8 Set 418-A,B,C,D 10:00 259 3500 3" Slab on Grade, Lines N-P, 7-6 Set #9-A,B,C,D 10:30 167 3500 3 1/2" Slab on Grade, Lines N-P, 6-5 Set 410-A,B,C,D 11:15 131 3500 2 3/4" Slab on Grade, Lines P-Q, 7-8 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck slump Air Temp. Conc. Temp. % Air 06:35 261 2 1/2" 55°F 62°F 1.5 06:45 262 3" 55°F 64°F 1.8 07:00 245 2 3/4" 55°F 62°F 1.4 07:15 144 3" 55°F 65!F 1.2 07:45 261 2 3/4" 55°F 62°F 1.4 08:00 125 3 1/2" 55°F 63°F 1.1 08:45 165 3" 57°F 65°F 1.3 09:00 123 2 1/2" 57°F 65°F 1.5 10:00 259 3" 58°F 64°F 1.8 10:30 167 3 1/2" 58°F 67°F 1.6 11:15 131 2 3/4" 58°F 65°F 1.2 REMARKS: 1. Temperatures inside building ranged from 550-60 0F. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A.. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 45-B DATE: 5/18/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Producer: Willard Concrete Location of Concrete Placement: North Loading Dock Exterior Apron, South and North Strip Reported to: Facility Constructors, Inc. - Attention: Mr. Job" CYLINDER FABRICATION "/JA t. 4 99: LU DATE CAST: 5/18/95 - DEPT O? Su1L!)! =t ;'. 7'td� IDENTIFICATION TIME TRUCK CLASS SLUMP North Loadin Dock Exterior Set #1-A,B,C,D 06:15 13 4000 3 1/2" Apron- Sout Strip Set #2-A,B,C,D 07:30 17 4000 3" to - South Strip Set #3-A,B,C,D 09:15 3 4000 3 1/2" it - North Strip Set X64-A,B,C,D 12:20 10 4000 3 3/4" it - North Strip SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 06:15 13 3 1/2' 55°F 64°F 5.8 07:30 17 3" 68°F 5.5 09:15 3 3 1/2" 65°F 5.6 12:20 10 3 3/4" 62°F 5.1 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. >� v4- - By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. Slag On Grade Facility Group Coca Cola Northampton 5-18-95 K-N 5-8 Truck# Timr Batched Time @ Job Time Mixing Time Pouring Time Finished Slump. 262 5:50 6:20 5 to 10 min 6:30 6:40 2 261 5:45 6:25 6:30 6:40 21/2 245 5:55 6:30 6:35 6:45 260 6:00 6:40 6:45 6:55 133 6:00 6:45 6:45 6:55 3 125 6:10 7:00 7:00 7:15 132 6:15 7:05 7:00 7:10 259 6:20 7:10 7:10 7:20 21/2 250 6:30 7:15 7:15 7:30 144 6:40 7:20 7:20 7:55 3 131 6:45 7:25 7:25 7:35 156 6:50 7:30 7:30 7:45 23/4 128 7:00 7:40 7:40 7:55 262 7:30 7:40 7:40 7:55 21/2 245 7:35 7:50 7:55 8:05 260 7:40 7:50 7:50 8:00 3 259 7:45 7:55 7:55 8:10 132 7:50 8:00 8:00 8:10 31/2 126 7:55 8:05 8:05 8:15 251 7:55 8:10 8:10 8:25 3 144 8:00 8:10 8:10 8:30 250 8:05 8:15 8:20 8:30 21/2 133 8:10 8:20 8:25 8:45 21/2 165 8:15 8:30 8:40 8:45 198 8:25 8:35 8:45 8:55 3 251 7:55 8:20 8:50 9:00 245 8:15 8:25 8:50 9:10 2 156 8:15 8:30 9:00 9:10 125 8:30 8:40 9:00 9:15 31/2 131 8:35 8:45 9:15 9:25 259 8:55 9:10 9:10 9:25 31/2 132 9:00 9:15 9:25 9:35 126 9:05 9:20 9:30 9:40 21/2 261 9:20 9:30 9:40 9:55 137 9:25 9:35 9:55 10:05 3 133 9:45 10:05 10:10 10:25 165 10:00 10:15 10:25 10:35 3 198 10:05 10:20 10:30 10:45 156 10:30 10:45 10:45 10:55 2 314 245 10:30 10:50 11:00 11:10 125 10:35 10:55 11:05 11:15 2 131 11:00 11:10 11:15 11:25 128 11:05 10:15 11:20 11:30 259 11:15 11:20 11:25 11:35 132 11:20 11:30 11:30 11:40 126 11:30 11:45 11:45 1 12:20 ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 45-A DAT 5 �f ! Client: Facility Constructors, Inc. a?j ' Project: Coca Cola Bottling & Distribution Center, NorthamptogY 2 QI ° Es Contractor: S-F Concretep a Producer: Construction Service Location of Concrete Placement: Slab on Grade, Lines K-N, 5-8 DITTOF UI T'UN 1N+,40 1 C 'r°raS �3 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 5/18/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set 111-A,B,C,D 07:00 133 3500 3" Slab on Grade, Lines K8-L8 Set 112-A,B,C,D 07:15 144 3500 2 1/2" Slab on Grade, Lines L8-M8 Set 113-A,B,C,D 07:30 156 3500 2" Slab on Grade, Lines M8-N8 Set 114-A,B,C,D 08:00 260 3500 3 1/2" Slab on Grade, Lines K7-L7 Set 115-A,B,C,D 08:30 165 3500 3" Slab on Grade, Lines L7-M7 Set 116-A,B,C,D 09:00 251 3500 3" Slab on Grade, Lines M7-N7 Set 117-A,B,C,D 09:30 132 3500 3" Slab on Grade, Lines K6-L6 Set 118-A,B,C,D 10:15 137 3500 2 3/4" Slab on Grade, Lines L6-M6 Set 119-A,B,C,D 11:15 245 3500 3" Slab on Grade, Lines M6-N6 Set 1110-A,B,C,D 12:15 126 3500 3 1/2" Slab on Grade, Lines M5-N5 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 06:45 260 2 1/2" 50°F 64°F 1.2 07:00 133 .3" 50°F 64°F 1.5 07:15 144 2 1/2" 50°F 62°F 1.4 07:30 156 2" 50°F 64°F 1.1 08:00 260 3 1/2" 51°F 66°F 1.6 08:30 165 3" 51°F 64°F 1.3 09:00 251 3" 53°F 66°F 1.6 09:30 132 3" 54°F 68°F 1.4 10:15 137 2 3/4" 56°F 66°F 1.5 11:15 245 3" 58°F 64°F 1.2 12;15 126 3 1/2" 60°F 64°F 1.8 REMARKS: 1. Temperatures inside building ranged from 50-62°F. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. G'� ' v4 : By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo,City of Northampton Bldg. dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. / Slab On Grade Facility Group Coca Cola Northampton 5-17-95 N-R 8-11 Truck# Time Patched Time @ Job Time Mixing Time Pouring Time Finished Slump. 245 5:45 6:20 5 to 10 min 6:35 6:45 21/2 260 5:50 6:30 6:35 6:45 261 5:45 6:35 6:35 6:45 2 259 5:55 6:40 6:40 6:50 257 6:00 6:45 6:50 7:10 133 6:05 6:35 6:40 7:00 3 132 6:10 6:40 6:50 7:10 250 6:15 6:45 7:10 7:20 3112 144 6:20 6:50 7:15 7:25 156 6:30 7:10 7:20 7:40 2112 260 6:45 7:15 7:25 7:40 245 7:15 7:30 7:40 7:50 3 131 7:00 7:35 7:50 8:00 261 7:20 7:30 7:50 8:05 23/4 128 7:30 7:50 8:00 8:10 262 7:40 7:55 8:05 8:15 3112 125 7:50 8:00 8:10 8:20 111 7:30 8:05 8:10 8:30 3 259 7:45 8:00 8:15 8:25 132 8:00 8:10 8:25 8:30 2 118 7:30 8:20 8:30 8:40 126 7:40 8:20 8:30 8:40 3112 133 8:00 8:25 8:35 8:45 257 8:10 8:30 8:35 9:00 3 250 8:20 8:45 8:50 9:00 144 8:30 8:50 9:00 9:15 21/2 245 8:35 8:55 9:00 9:15 156 8:55 9:10 9:20 9:30 31/2 131 9:00 9:15 9:20 9:35 128 9:10 9:20 9:35 9:45 2112 132 9:15 9:25 9:30 9:40 262 9:20 9:35 9:50 9:00 3 125 9:30 9:45 9:50 10:00 259 9:35 9:50 10:00 10:10 31/2 111 9:45 10:00 10:05 10:20 118 9:50 10:05 10:20 10:30 3 133 9:50 10:10 10:30 10:35 126 10:05 10:20 10:30 10:40 21/2 132 10:15 10:25 10:40 10:45 257 10:25 10:35 10:45 10:55 31/2 245 10:30 10:45 10:50 11:00 144 10:50 11:00 11:05 11:25 31/2 156 1 11:10 1 11:25 1 1 11:30 1 11:45 ALLIED TESTING LABORATORIES, INC. I 15 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 44 DAT#k l?f Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton Contractor: S-F Concrete Producer: Construction Service SAY 1. 4 199: Location of Concrete Placement: Slab on Grade, Lines N-R, 8-11 , Reported to: Facility Constructors, Inc. - Attention: Mr. John Ne t 06 pTOFBUI WING INSPECTIO14S + Al�60 CYLINDER FABRICATION DATE CAST: 5/17/95 IDENTIFICATION TIME TRUCK CLASS SLM4P EXACT LOCATION Set 411-A,B,C,D 07:00 132 3500 3" Slab on Grade, Lines Nll-Pll Set 412-A,B,C,D 07:30 156 3500 2 3/4" Slab on Grade, Lines Pll-Qll Set 413-A,B,C,D 07:55 131 3500 2 1/2" Slab on Grade, Lines Qll-Rll Set #4-A,B,C,D 08:15 259 3500 3 1/2" Slab on Grade, Lines N10-P10 Set #5,A,B,C,D 08:30 126 3500 3" Slab on Grade, Lines P10-Q10 Set 416-A,B,C,D 09:10 245 3500 3" Slab on Grade, Lines Q10-RlO Set 417-A,B,C,D 10:00 260 3500 2 1/2" Slab on Grade, Lines N9-D9 Set 418-A,B,C,D 10:30 133 3500 3" Slab on Grade, Lines P9-Q9 Set 419-A,B,C,D 11:00 144 3500 3 1/2" Slab on Grade, Lines Q9-R9 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck slump Air Temp. Conc. Temp. % Air 06:45 260 2 1/2" 52°F 62°F 1.2 07:00 132 3" 52°F 62°F 1.4 07:30 156 2 3/4" 52°F 64°F 1.5 07:55 131 2 1/2" 52°F 62°F 1.1 08:15 259 3 1/2" 54°F 64°F 1.5 08:30 126 3" 54°F 62°F 1.4 09:10 245 3" 55°F 66°F 1.6 10:00 260 2 1/2" 56°F 66°F 1.5 10:30 133 311 56°F 64°F 1.2 11:00 144 3 1/2" 58°F 62°F 1.8 REMARKS: 1. Temperatures inside building ranged from 50° - 60°F. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. � �.1 a 4404e. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. Facility Group Coca Cola Northampton 5-16-95 Truck# Time Patched Time @ Job Time Mixing Time Pouring Time Finished Slump. 261 5:55 6:15 5 to 10 min 6:35 6:45 21/2 245 5:50 6:30 6:40 6:50 125 6:00 6:40 6:40 7:00 3 262 5:55 6:45 6:50 7:05 259 6:00 6:50 6:50 7:00 2 133 6:10 6:45 7:00 7:15 257 6:20 6:50 7:05 7:15 132 6:30 6:50 7:05 7:15 3 250 6:25 7:00 7:15 7:30 134 6:30 7:05 7:30 7:35 31/2 144 6:35 7:10 7:30 7:45 248 6:45 7:15 7:35 7:45 3 260 7:20 7:35 7:45 7:55 156 7:30 7:40 7:45 7:55 2 261 7:30 7:40 7:55 8:05 245 7:40 7:55 8:00 8:15 2112 131 7:45 7:55 8:05 8:20 125 7:50 8:00 8:15 8:25 21/2 127 7:15 8:00 8:20 8:30 262 8:00 8:15 8:25 8:35 3112 259 8:10 8:20 8:30 8:40 257 8:15 8:20 8:40 8:55 3 133 8:20 8:30 8:40 8:50 124 8:30 8:40 8:45 8:55 23/4 248 8:40 8:50 8:55 9:05 144 8:50 9:00 9:05 9:10 3 132 8:55 9:10 9:10 9:15 260 9:00 9:05 9:10 9:20 3 156 9:10 9:15 9:20 9:30 261 9:15 9:20 9:30 9:40 23/4 245 9:20 9:30 9:35 9:45 131 9:25 9:35 9:45 10:00 31/2 125 9:30 9:40 10:00 10:10 3 127 9:45 10:00 10:10 10:20 259 10:10 10:20 10:25 10:30 257 10:15 10:25 10:30 10:40 21/2 124 10:25 10:35 10:40 10:50 144 10:30 10:40 10:45 10:55 3 248 10:40 10:50 10:55 11:05 132 10:50 11:00 11:05 11:15 156 11:00 11:20 11:20 11:30 31/2 454 11:15 11:25 11:25 11:35 133 11:25 11:35 11:40 11:55 131 11:40 11:50 11:55 12:05 3 123 1 12:00 1 12;10 1 1 12:15 12:25 7 777, -R ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736.1 846 CONCRETE FIELD REPORT NO. 43 DATE:" Client: Facility Constructors, Inc. t �r �� i i� .I iS n7. Project: Coca Cola Bottling & Distribution Center, Northampton, JJ , Contractor: S-F Concrete e995 Producer: Construction Service LIU Location of Concrete Placement: Slab on Grade, Lines K-N, 8-11 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newt n OENORTHAfwL�,i�� 6--':p --- 'P1�0(d tv�#��r CYLINDER FABRICATION DATE CAST: 5/16/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 07:00 257 3500 3" Slab on Grade, Lines Kll-Lll Set #2-A,B,C,D 07:30 250 3500 3 1/2" Slab on Grade, Lines Lll-Mll Set #3-A,B,C,D 07:40 248 3500 2 1/2" Slab on Grade, Lines Mll-Nll Set 414-A,B,C,D 08:00 245 3500 2 1/2" Slab on Grade, Lines K10-LIO Set #5-A,B,C,D 08:30 133 3500 2" Slab on Grade, Lines L10-MlO Set #6-A,B,C,D 09:10 132 3500 2 1/2" Slab on Grade, Lines M10-N10 Set #7-A,B,C,D 09:15 260 3500 3" Slab on Grade, Lines K9-L9 Set #8-A,B,C,D 10:00 125 3500 2 3/4" Slab on Grade, Lines L9-M9 Set #9-A,B,C,D 10:30 257 3500 3" Slab on Grade, Lines M9-N9 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck slump Air Temp. Conc. Temp. % Air 06:45 245 2 1/2" 46°F 60°F 1.2 07:00 257 3" 46°F 62°F 1.1 07:30 250 3 1/2" 46°F 62°F 1.5 07:40 248 2 1/2" 48°F 64°F 1.2 08:00 245 2 1/2" 48°F 66°F 1.6 08:30 133 2" 48°F 62°F 1.4 09:10 132 2 1/2" 50°F 64°F 1.8 09:15 260 3" 51°F 66°F 1.5 10:00 125 2 3/4" 52°F 68°F 1.4 10:30 257 3" 52°F 66°F 1.3 REMARKS: 1. Temperatures inside building ranged from 450 - 58°F. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. Slab On Grade Facility Group Coca Cola Northampton G-K � IHI 8-11 U Truck# Time Patched Time @ Job Time Mixing Time P uri e Slump. 260 5:50 6:20 5 to 10 min 6: , `,'"" 2 a/2 262 6:15 6:30 _.,.. .... 125 6:20 6:45 6:50 6:55 3 132 6:20 7:00 7:05 7:10 250 6:30 7:05 7:10 7:20 3 257 6:35 7:10 7:20 7:35 126 6:45 7:20 7:25 7:40 21/2 248 6:50 7:25 7:35 7:45 253 6:50 7:25 7:40 7:50 23/4 260 7:00 7:35 7:50 8:05 131 7:30 7:45 7:55 8:00 31/4 262 7:40 7:50 7:55 8:15 119 7:40 7:50 8:00 8:10 3 125 7:40 8:00 8:05 8:15 128 7:30 8:00 8:10 8:20 21/2 258 7:35 8:10 8:15 8:25 111 7:40 8:15 8:20 8:30 127 7:40 8:20 8:25 8:35 3 132 7:30 8:20 8:30 8:40 118 8:00 8:25 8:40 8:50 31/2 198 7:30 8:20 8:45 8:50 250 8:00 8:30 8:50 9:05 138 7:55 8:35 8:50 9:00 3 257 7:50 8:15 9:00 9:10 248 8:00 8:40 9:05 9:15 21/2 253 8:20 8:30 9:05 9:20 123 8:30 9:05 9:10 9:30 3 260 8:50 9:00 9:25 9:35 2 131 9:00 9:15 9:35 9:50 128 9:10 9:30 9:45 10:05 23/4 126 9:20 9:30 9:50 10:10 111 9:30 9:45 10:10 10:20 3 132 9:35 9:55 10:20 10:30 198 9:45 10:10 10:25 10:40 31/4 118 10:00 10:15 10:30 10:45 138 10:15 10:30 10:45 10:50 3 257 10:25 10:40 10:50 11:00 248 10:30 10:50 11:00 11:05 253 10:55 11:00 11:05 11:15 21/2 123 10:50 11:05 11:10 11:20 127 11:00 11:15 11:20 11:30 3112 131 11:10 11:20 11:30 11:40 129 11:20 11:30 11:40 11:50 2 119 11:30 11:40 11:40 11:50 128 11:40 11:50 11:55 12:05 126 11:45 11:55 12:00 12:30 3 111 11:55 12:05 ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 42 DATE: ; $(15/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: S-F Concrete Producer: Construction Service Location of Concrete Placement: Slab on Grade, Lines G-K, 8-11 }� k Reported to: Facility Constructors, Inc. - Attention: Mr. John Ne CYLINDER FABRICATION OF BUW DATE CAST: 5/15/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set 411-A,B,C,D 07:10 250 3500 3" Slab on Grade-Lines G-H, 8-9 Set 412-A,B,C,D 07:45 253 3500 2 1/2" Slab on Grade-Lines G-H, 9-10 Set 413-A,B,C,D 08:00 128 3500 3" Slab on Grade-Lines G-H, 10-11 Set 414-A,B,C,D 08:30 127 3500 2 3/4" Slab on Grade-Lines H-J, 8-9 Set 415-A,B,C,D 09:00 257 3500 3" Slab on Grade-Lines H-J, 9-10 Set 416-A,B,C,D 09:30 260 3500 2 1/2" Slab on Grade-Lines H-J, 10-11 Set 417-A,B,C,D 09:55 131 3500 3" Slab on Grade-Lines J-K, 8-9 Set 418-A,B,C,D 10:45 138 3500 3 1/2" Slab on Grade-Lines J-K, 9-10 Set 419-A,B,C,D 11:15 127 3500 2 3/4" Slab on Grade-Lines J-K, 10-11 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 07:00 125 2 1/2" 50°F 62°F 1.6 07:10 250 3" 50°F 60°F 1.8 07:45 253 2 1/2" 50°F 62°F 1.5 08:00 128 3" 50°F 60°F 1.1 08:30 127 2 3/4" 51°F 62°F 1.4 09:00 257 3" 51°F 60°F 1.6 09:30 260 2 1/2" 53°F 62°F 1.8 09:55 131 3" 53°F 64°F 1.4 10:45 138 3 1/2" 54°F 62°F 1.6 11:15 127 2 3/4" 55°F 64°F 1.5 REMARKS: 1. Temperatures inside building ranged from 45° - 55°F. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. 'V.4-j.. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. -� ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massach tt&444�-- 7 Phone: (413) 736-1846 r Facility Group Coca Cola Northampto ' DEPT Of FU" NNORT. Truck# Time Patched Time @ Job Time Mixing Time Pouring Time Finished Slump. 261 6:45 5 to 10 min 6:50 6:55 2 245 6:45 7:00 7:05 124 6:30 6:50 6:50 7:00 259 6:55 6:50 7:10 21/2 133 6:55 6:55 7:00 7:10 257 6:20 7:00 7:10 7:20 254 7:00 7:10 7:20 132 6:25 7:05 7:15 7:30 126 7:10 7:15 7:30 250 7:15 7:30 7:40 253 6:30 7:20 7:35 7:45 248 7:20 7:25 7:30 156 7:00 7:35 7:35 8:00 261 7:50 8:00 8:15 131 7:30 7:55 8:05 8:15 245 8:00 8:05 8:05 8:20 124 8:05 8:10 8:15 8:25 198 8:15 8:25 8:40 259 8:20 8:30 8:40 137 8:30 8:40 8:50 111 8:30 8:40 9:05 127 8:30 8:45 9:00 133 8:40 9:00 9:10 257 8:45 9:00 9:15 134 7:55 8:50 9:05 9:20 132 8:55 9:20 9:30 126 8:50 9:20 9:35 250 9:00 9:25 9:25 248 9:20 9:30 9:35 253 9:30 9:35 9:45 156 9:35 9:40 9:45 9:55 2 261 9:40 9:45 9:50 10:05 131 9:50 10:00 10:10 245 10:00 10:10 10:20 124 9:55 10:10 10:20 10:30 198 10:15 10:25 10:35 137 10:05 10:20 10:30 10:45 127 10:30 10:55 11:00 133 10:45 10:55 10:55 11:00 257 10:50 11:00 11:20 134 10:45 10:55 11:00 11:15 132 11:00 11:15 11:30 126 11:10 11:20 11:20 11:35 248 11:20 11:35 11:50 211 11:30 11:35 11:45 253 11:25 11:40 11:45 12:00 156 11:30 1 11:45 1 11:50 12:00 -7411; ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 41 DA ; .5/1,J93* Client: Facility Constructors, Inc. .. ..... „� Project: Coca Cola Bottling & Distribution Center, Northampton Contractor: S-F Concrete Producer: Construction Service 33t€ Location of Concrete Placement: Slab on Grade, Lines G-K, 5-8 F , Reported to: Facility Conntructors, Inc. - Attention: Mr. John N t0 ,...... z . CYLINDER FABRICATION DATE CAST: 5/12/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set 411-A,B,C,D 07:15 257 3500 3" Slab on Grade:Lines G-H, 5-6 Set 412-A,B,C,D 07:35 248 3500 2 1/2" Slab on Grade, Lines G-H, 6-7 Set 413-A,B,C,D 07:45 156 3500 2 1/2" Slab on Grade, Lines G-H, 7-8 Set 414-A,B,C,D 08:10 245 3500 3" Slab on Grade, Lines H-J, 5-6 Set 415-A,B,C,D 08:30 198 3500 2 1/2" Slab on Grade, Lines H-J, 6-7 Set 416-A,B,G,D 09:00 126 3500 2" Slab on Grade, Lines H-J, 7-8 Set 417-A,B,C,D 10:00 261 3500 3" Slab on Grade, Lines J-K, 5-6 Set 418-A,B,C,D 10:30 198 3500 2" Slab on Grade, Lines J-K, 6-7 Set 419-A,B,C,D 11:00 126 3500 2 3/4" Slab on Grade, Lines J-K, 7-8 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 07:00 259 2 1/2" 52°F 62°F 1.2 07:15 257 3" 52°F 62°F 1.4 07:35 248 2 1/2" 52°F 64°F 1.5 07:45 156 2 1/2" 52°F 63°F 1.8 08:10 245 3" 52°F 65°F 1.3 08:30 198 2 1/2" 53°F 640F 1.5 09:00 126 2" 54°F 66°F 1.4 10:00 261 3" 54°F 67°F 2.0 10:30 198 2" 55°F 64°F 1.6 11:00 126 2 3/4" 55°F 62°F 1.4 REMARKS: 1. Temperatures inside building ranged from 480 - 58°F. Respectfully submitted, ALLIED TESTING ABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. I 15 St. George Road a Springfield, Massachusetts 01 104 Phone: (413) 736-1846 c ry1 Ln MAY 1 Slab On Grade Facility Group Coca Cola Northam on R D-G 8-11 gvf?Ri r - Truck# Time Patched Time @ Job Time Mixing Time Pouring Time Finished Slump. 260 5:25 6:30 5 to 10 min 6:55 7:05 2 245 5:30 6:45 6:55 7:05 1 1/2 259 5:40 6:50 6:55 7:05 262 5:55 6:50 6:55 7:10 124 6:00 6:55 7:00 7:10 2 254 6:05 6:55 7:05 7:20 21/2 257 6:10 7:00 7:15 7:25 133 7:05 7:15 7:25 2 125 7:05 7:20 7:30 250 6:30 7:10 7:20 7:35 126 6:35 7:15 7:30 7:45 21/2 248 6:40 7:20 7:35 7:45 119 6:45 7:30 7:35 7:45 156 7:40 7:45 8:00 3 261 7:00 7:55 7:55 8:05 131 8:00 8:05 8:15 129 7:20 8:05 8:10 8:25 21/2 128 8:10 8:15 8:30 245 8:00 8:20 8:30 2 262 7:45 8:20 8:25 8:35 111 8:25 8:30 8:45 21/2 124 8:30 8:35 8:45 262 8:35 8:30 8:50 1 1/2 258 8:00 8:30 8:45 9:00 254 8:35 8:50 9:05 2112 127 8:45 9:00 9:15 257 8:50 9:00 9:20 3 133 8:15 8:55 9:10 9:20 3 126 9:00 9:20 9:30 250 8:35 9:10 9:20 9:30 21/2 248 9:00 9:15 9:30 9:40 119 9:10 9:20 9:45 9:55 3 156 9:25 9:50 10:00 262 9:45 9:50 9:55 10:05 3 131 9:55 10:05 10:15 129 9:50 10:10 10:25 245 10:00 10:10 10:20 10:25 128 10:15 10:25 10:35 124 10:05 10:25 10:30 10:40 111 10:25 10:35 10:50 258 10:15 10:30 10:50 11:00 133 10:40 10:50 11:05 127 10:30 10:50 11:05 11:20 119 11:30 11:35 12:00 131 11:25 11:50 12:05 12:10 129 11:30 11:55 12:05 1 12:30 ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 40 DATE 5/11/95 Client: Facility Constructors, Inc. � Project: Coca Cola Bottling & Distribution Center, Northampton, . Contractor: S-F Concrete ' Producer: Construction Service Location of Concrete Placement: Slab on Grade, Lines D8-Dll to G8-Gl Reported to: Facility Constructors, Inc. - Attention: Mr. John Newt n DEPT Of CYLINDER FABRICATION DATE CAST: 5/11/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Slab on Grade Set 411-A,B,C,D 07:10 259 3500 " Lines D to E, 8 to 9 . x Set 412-A,B,C,D 07:30 125 3500 Lines D to E, 9 to 10 Set 413-A,B,C,D 07:40 126 3500 2 '1/2" Lines D to E, 10 to 11 Set 414-A,B,C,D 07:50 119 3500 Lines E to F, 8 to 9 Set 415-A,B,C,D 08:30 245 3500 3". Lines E to F, 9 to 10 Set 416-A,B,C,D 08:50 248 3500 '-2 '1/2" Lines E to F, 10 to 11 Set 417-A,B,C,D 09:15 126 3500 2" Lines F to G, 8 to 9 Set 418-A,B,C,D 10:15 131 3500 3" Lines F to G, 9 to 10 Set 419-A,B,C,D 10:45 ill 3500 2 .1/2" Lines F to G, 10 to 10.5 Set 4110-A,B,C,D 12:00 119 3500 2 1/4" Lines F to G, 10.5 to 11 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. 7 Air 07:10 259 2 1/2" 46°F 640F 07:30 125 2" 46°F 64°F 1. 3 07:40 126 2 1/2" 46°F 62°F 1.6 07:50 119 2" 46°F 64°F 14 08:30 245 3" 48°F 66°F .0� 08:50 248 2 1/2" 48°F 65°F .':2 09:15 126 2" 48°F 64°F 1.3 10:15 131 3" 52°F 66°F 1.8 10:45 111 2 1/2" 52°F 62°F 1.4 12:00 119 2 1/4" 55°F 64°F 1.5 REMARKS: 1. Temperatures inside building ranged from 48° - 58°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. 6�� v A-�z- By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. -- ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Facility Group Coca Cola Northampton 111.95 Truck # Time Patched Time a Job Time Mixing Time Pouring Time Finished Slump. 260 6:10 6:60 5 to 10 min 6:55 7:05 21/2 245 6:05 6:50 7:05 7:10 11/2 261 6:15 6:50 7:05 7:15 262 6:55 7:10 7:20 2 124 6:10 6:55 7:10 7:20 259 7:00 7:15 7:30 257 6:20 7:05 7:20 7:30 21/2 254 7:10 7:30 7:35 133 6:20 7:10 7:30 7:35 2 125 7:15 7:35 7:30 250 6:25 7:20 7:40 7:55 21/2 126 7:25 7:50 8:00 3 253 6:35 7:30 7:50 8:05 156 7:35 8:00 8:10 131 7:10 7:40 8:05 8:15 2 198 7:45 8:10 8:20 245 7:40 8:05 8:15 8:25 261 7:55 8:10 8:20 8:30 129 8:15 8:25 8:40 21/2 262 8:00 8:20 8:30 8:40 259 8:15 8:30 8:40 8:50 3 257 8:35 8:50 9:00 254 8:30 8:50 8:55 9:05 133 8:55 9:00 9:15 250 9:00 9:15 9:20 9:30 31/4 136 9:25 9:30 9:40 253 9:30 9:35 9:45 156 9:30 9:45 9:50 10:00 21/2 131 9:35 9:45 9:50 10:00 198 9:45 10:00 10:00 10:10 2 245 10:05 10:10 10:20 261 10:10 10:20 10:30 3 129 10:00 10:15 10:20 10:30 262 10:30 10:35 10:45 21/2 124 10:20 10:35 10:40 10:50 248 10:00 10:45 10:50 10:55 259 10:50 10:55 11:05 3 250 10:55 11:05 11:10 126 10:20 10:55 11:10 11:25 23/4 133 11:15 11:20 11:25 259 11:20 11:25 11:25 21/2 131 11:15 11:30 11:35 11:50 245 11:50 11:55 12:05 3 129 11:45 12:00 12:05 12:20 127 1 12:20 1 1 12:25 1 12:45 259 12:50 12:50 --4 - ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 39 DAT*..- 5/10/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: S-F Concrete Producer: Construction Service Location of Concrete Placement: Slab on Grade, Lines D5-D8 to G5-G8 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 5/10/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Slab on Grade Set 111-A,B,C,D 07:10 261 3500 , Lines D to E, 5 to 6 Set 112-A,B,C,D 07:30 133 3500 2 j2'.' Lines D to E, 6 to 7 Set 113-A,B,C,D 07:45 250 3500 ` " ` Lines D to E, 7 to 8 Set 114-A,B,C,D 08:00 131 3500 3" Lines E to F, 5 to 6 Set 115-A,B,C,D 08:15 245 3500 3" Lines E to F, 6 to 7 Set 116-A,B,C,D 09:15 250 3500 31/4" Lines E to F, 7 to 8 Set 117-A,B,C,D 10:25 261 3500 V Lines F to G, 5 to 6 Set 118-A,B,C,D 11:15 126 3500 3 1/2" Lines F to G, 6 to 7 Set 119-A,B,C,D 11:55 245 3500 `2 314" Lines F to G, 7 to 7.5 Set 1110-A,B,C,D 13:00 259 3500 -2 1/2" Lines F to G, 7.5 to 8 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 06:55 260 2 1/2" 55°F 62°F 07:10 261 2" 55°F 660F 07:30 133 2 1/2" 55 0F 71°F 07:45 250 2 1/2" 55°F 70°F 08:00 131 3" 56°F 74°F 08:15 245 3" 56°F 72°F 09:15 250 3 1/4" 56°F 66°F 10:25 261 3" 56°F 70°F 11:15 126 3 1/2" 58°F 64°F 11:55 245 2 3/4" 58°F 65°F .f3 13:00 259 2 1/2" 58°F 62°F REMARKS: 1. Temperatures inside building ranged from 50°F - 60°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. a/.4 41.44V�Y- By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 38 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, �gkk., Contractor: S-F Concrete AY Producer: Construction Service a ^' Location of Concrete Placement: Slab on Grade, Lines A8-All to D8-D1 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newto CYLINDER FABRICATION DATE CAST: 5/9/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 07:10 245 3500 " ` Slab on Grade - Lines A8-B$ Set #2-A,B,C,D 07:45 126 3500 /2":. " 93:ab on Grade - Li v. Set #3-A,B,C,D , 07:55 260 3500 Sl h .on=e6rade..- LiVn io-b10 Set #4-A,B,C,D 08:45 198 3500 X31' 51 1 n.Gx .. . - 1 Set #5-A,B,C,D 09:15 260 3500 1/2'' Slab on Grade - Lines B8-C8' Set #6-A,B,C,D 10:00 262 3500 1/2 lab on Gr de � � es�B9 C9 ;'' e Set #7-A,B,C,D 11:00 133 3500 `� '�� '` tines Set #8-A,B,C,D 11:30 257 3500 � 2" � i Set #9-A,B,C,D 13:10 259 3500 , Lines C1 1 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. 7 Air 06:55 260 2" 48°F 62°F 4 07:10 245 3" 48°F 62°F X1.8 07:45 126 2 1/2" 50°F 64°F 3.8 07:55 260 3" 50°F 64°F 08:45 198 3" 52°F 62°F 09:15 260 2 1/2" 54°F 64°F 10:00 262 3 1/2" 56°F 66°F2 10:30 156 * 6 1/2" * Truck #156 rejected due to excessive slump 11:00 133 2 1/2" 60`F 660F 1.0 11:30 257 2 1/2" 61°F 68°F t" 13:10 259 2" 63°F 67°F 1.6 REMARKS: 1. Temperatures inside building ranged from 460 - 65°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. .Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATO� - 1 15 St. George Road •Springfield, Massachuse t;. ?I Phone: (413) 736-1846 ` "5/8/95 ak! i CONCRETE FIELD REPORT NO. 37 DAT nEPT OF BuILM14G c Client: Facility Constructors, Inc. � _�_ Project: Coca Cola Bottling & Distribution Center, Northampto �° Contractor: S-F Concrete Producer: Construction Service Location of Concrete Placement: Slab on Grade, Lines A5-A8 to D5-D8 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 5/8/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #!-A,B,C,D 07:15 259 3500 3" Slab on Grade-Lines A5-05 Set 112-A,B,C,D 07:35 125 3500 2 1/2" Slab on Grade-Lines A6-C6 Set 113-A,B,C,D 08:15 261 3500 2" Slab on Grade-Lines A7-C7 Set 114-A,B,C,D 08:30 262 3500 2 1/2" Slab on Grade-Lines C5-D5 Set 115-A,B,C,D 09:30 250 3500 2" Slab on Grade-Lines C6-D6 Set 116-A,B,C,D 10:00 112 3500 3" Slab on Grade-Lines A8-B8 Set 117-A,B,C,D 10:35 254 3500 2 3/4" Slab on Grade-Lines B8-C8 Set 118-A,B,C,D 11:00 118 3500 3" Slab on Grade-Lines C8-D8 Set 119-A,B,C,D 11:30 253 3500 3 1/2" Slab on Grade-Lines A8-B8 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. 7 Air 07:00 261 2 1/2" 48°F 64°F 1.8 07:15 259 3" 50°F 66°F 2.0 07:35 125 2 1/2" 50°F 66°F 1.6 08:15 261 2" 51°F 67°F 1.8 08:30 262 2 1/2" 51°F 63°F 1.5 09:30 250 2" 53°F 62°F 1.4 10:00 112 3" 55°F 62°F 2.2 10:35 254 2 3/4" 58°F 62°F 1.8 11:00 118 3" 58°F 60°F 2.2 11:30 253 3 1/2" 58°F 62°F 2.0 No. Yds: 454 REMARKS: 1. Temperatures inside building ranged from 48° - 60°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. U4 By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 7 DA r r Client: D.O.S. Concrete Service, Inc. Project: Coca Cola Bottling & Distribution Center 4 MAY Contractor: DOS Concrete Service, Inc. Producer: Construction Service Location of Concrete Placement: Silo Pad DEpTOf8U1tDItJG1 PE.t,TlU�JS NORTM PT MA 01060 Reported to: D.O.S. Concrete Service, Inc. - Attention: Mr. Fred Sirard CYLINDER FABRICATION DATE CAST: 5/1/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set X11-A,B,C,D 08:45 261 4000 4" Silo Pad Set #2-A,B,C,D 10:45 260 4000 2 1/2" Silo Pad SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck slump Air Temp. Conc. Temp. % Air 08:45 261 4" 52°F 60°F 5.7 10:45 260 2 1/2" 62°F 62°F 5.5 Weather: Cloudy Temp: 520-62°F No. Yds: 60 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. �V'`n,. ��� 'C U%w� By: Chester V. Dawicki Director of Testing Services MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 36 DATE: 4/24/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: S-F Concrete Producer: Construction Service Location of Concrete Placement: Slabs between Locking Dock Pits Diamonds @ Columns Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 4/24/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 10:30 245 3500 4" Slabs Between Locking Dock Pits Diamonds @ Columns SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 10:30 245 4" 54°F 66°F 2.0 Weather: Fair Temp: 54°F No. Yds: 20 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 35 - PAGE TWO DATE: 4/21/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Truck Time Time Time Time Time No. Batched @ Job Mixing Pouring Finished Slum 260 06:05 06:55 5-10 Min. 07:00 07:15 2" 252 06:15 07:00 it 07:05 07:15 2 1/2" 256 06:50 07:00 it 07:15 07:25 258 06:20 07:05 if 07:25 07:35 261 06:35 07:20 It 07:35 07:45 2" 124 06:40 07:20 07:35 07:45 245 07:15 07:30 07:45 08:10 2 1/2" 156 07:00 07:20 07:45 08:00 119 07:10 07:45 08:05 08:20 131 07:20 08:10 08:15 08:30 2 1/2" 111 07:15 08:05 " 08:30 08:45 127 07:30 08:05 08:45 09:00 262 08:00 08:10 " 08:50 09:00 3" 125 07:35 08:10 " 08:55 09:10 257 08:10 08:25 " 09:05 09: 15 259 08:15 08:35 " 09:10 09:20 261 08:20 08:35 09:20 09:25 2 1/2" 124 08:35 09:00 09:30 09:40 245 08:55 09:15 09:30 10:00 3" 156 08:45 09:20 09:40 09:50 119 09:15 09:25 10:20 10:35 131 09:00 09:15 " 10:30 10:35 2 1/2" 111 09:30 09:45 " 10:35 10:45 262 09:55 10:10 10:45 11:00 1 1/2" 127 09:35 10:15 " 10:45 11:00 254 10:15 10:40 11:05 11:15 2" 257 10:30 10:40 " 11:15 11:30 156 11:15 11:35 11:40 11:50 131 11;45 11:45 " 12:00 12:15 3" 111 11:55 11:55 12:20 12:25 127 12:10 12:10 12:30 12:45 MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1-84.611 CONCRETE FIELD REPORT NO. 35 DATE: 4/21/95 Client: Facility Constructors, Inc. ~ 26 ., .x; Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: S-F Concrete VY Producer: Construction Service Location of Concrete Placement: Slab on Grade-Lines G3-G5,H3-H5, J3-J5, Kl-K5 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 4/21/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 07:30 259 3500 2" Slab on Grade-Lines G3-G4 Set #2-A,B,C,D,E 08:20 131 3500 2 1/2" Slab on Grade-Lines G4-G5 Set #3-A,B,C,D 08:45 262 3500 3" Slab on Grade-Lines H3-H4 Set #4-A,B,C,D,E 09:10 257 3500 3" Slab on Grade-Lines H4-H5 Set #5-A,B,C,D 10:30 131 3500 2 1/2" Slab on Grade-Lines J3-J4, J4-J5 Set X16-A,B,C,D,E 11:15 257 3500 2 1/2" Slab on Grade-Lines K1-K5 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 07:00 260 2" 45°F 62°F 1.6 07:10 262 1 1/2" 45°F 62°F 1.5 07:30 259 2" 46°F 66°F 1.8 08:20 131 2 1/2" 48°F 68°F 2.2 08:45 262 3" 48°F 66°F 2.0 09:10 257 3" 50°F 64°F 1.8 10:30 131 2 1/2" 50°F 66°F 1.5 11:15 257 2 1/2" 50°F 64°F 1.4 Weather: Cool No. Yds: 324 REMARKS: 1. Temperatures inside building ranged from 420 - 55°F 2. Unit Weight - 155.8 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. a' za � ► - By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. CONCRETE FIELD REPORT NO. 34 - PAGE TWO DATE: 4/20/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Truck Time Time Time Time Time No. Batched @ Job Mixing Pouring Finished Slump 245 06.:50 07:05 5-10 Min. 07:15 07:25 2 1/2" 257 07:00 07:05 07:20 07:30 3" 260 06:25 07:10 07:30 07:40 254 07:05 07:10 07:30 07:40 3 1/2" 262 06:35 07:15 " 07:40 07:45 259 06:45 07:15 07:45 07:50 261 06:50 07:20 07:50 07:55 2 1/2" 129 07:20 07:40 07:55 08:05 131 07:30 07:40 08:05 08:10 124 07:40 07:45 08:10 08:20 248 07:10 08:00 08:15 08:25 2 1/2" 156 07:15 08:00 08:20 08:30 111 07:20 08:15 08:30 08:45 245 07:50 08:20 " 08:35 08:45 2 1/2" 127 07:30 08:20 " 08:45 09:00 257 08:10 08:20 08:50 09:05 260 08:15 08:35 09:00 09:20 254 08:25 08:30 09:05 09:20 1 1/2" 262 08:35 08:45 09:15 09:25 259 08:40 08:55 09:25 09:35 133 09:00 09:15 09:35 09:45 129 08:50 09:20 " 09:45 10:00 1 1/2" 124 09:10 09:30 09:45 10:00 248 09:15 09:30 " 10:00 10:10 156 09:30 10:00 10:10 10:20 245 09:50 10:05 " 10:10 10:20 111 09:45 10:10 " 10:20 10:30 127 10:00 10:15 " 10:25 10:35. 2" 257 10:05 10:30 " 10:35 10:45 2 1/2" 254 10:15 10:30 " LO:35 10:50 262 10:30 10:40 10:45 11:00 259 10:40 10:50 " 10:50 11:05 133 10:50 11:00 " 11:00 11:15 2" 129 10:55 11:10 11:15 11:25 1 1/2" 124 11:00 11:15 11:25 11:35 248 11:15 11:25 11:35 11:45 2 1/2" 245 11:20 11:30 11:35 11:50 156 11:30 11:45 11:50 12:10 111 11:50 12:00 " 12:15 12:30 2" 127 12:10 12:30 " 12:30 12:45 ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 34 DATE: 4/20/95 Client: Facilit Constructors, Inc. Project: Bottling & Distribution Center, Northampton, MA!. �j Contractor: ncrete Producer: Construction Service Location of Concrete Placement: Slab on Grade, Lines C-G, 3-5 2 6 Reported to: Facilities Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 4/20/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 07:35 254 3500 3 1/2" Slab on Grade-Lines C3-D3 Set #2-A,B,C,D,E 08:10 124 3500 2" Slab on Grade-Lines C4-05 Set #3-A,B,C,D 08:40 245 3500 2 1/2" Slab on Grade-Lines D3-E3 Set #4-A,B,C,D,E 09:00 260 3500 1 1/2" Slab on Grade-Lines D4-D5 Set #5-A,B,C,D 09:40 129 3500 1 1/2" Slab on Grade-Lines E3-F3 Set #6-A,B,C,D,E 10:15 111 3500 2 1/2" Slab on Grade-Lines E4-E5 Set X17-A,B,C,D 11:15 129 3500 2" Slab on Grade-Lines F3-G3 Set #8-A,B,C,D,E 12:00 156 3500 2 1/2" Slab on Grade-Lines F4-G5 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 07:10 245 2 1/2" 46°F 64°F 1.5 07:35 254 3 1/2" 46°F 62°F 2.0 08:10 124 2" 50°F 66°F 1.2 08:40 245 2 1/2" 50°F 64°F 1.5 09:00 260 1 1/2" 52°F 60°F 1.6 09:40 129 1 1/2" 52°F 65°F 2.2 10:15 111 2 1/2" 58°F 60°F 1.4 11:15 129 2" 58°F 62°F 1.8 12:00 156 2 1/2" 58°F 66°F 1.2 Weather: Sunny/Cool No. Yds: 420 REMARKS: 1. Temperatures inside building ranged from 400 - 55°F. 2. Unit Weight - 154.3 3. Yield - 26.8 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki' Copy: Director of Testing Services Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 33 - PAGE TWO DATE: 4/19/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Truck Time Time Time Time Time No. Batched @ Job Mixing Pouring Finished Slump 260 07:20 07:45 5-10 Min. 07:45 07:55 3" - 2 1/2" 245 07:30 07:50 it 07:55 08:05 3 1/2" - 2" 262 07:45 08:00 if 08:05 08:1.0 2 1/2" 259 07:55 08:05 it 08:12 08:20 257 08:05 08:15 08:20 08:35 3 1/2" 254 08:15 08:20 08:25 08:35 250 08:25 08:30 08:35 08:45 124 08:30 08:40 " 08:45 08:55 3" 156 08:35 08:40 " 08:55 09:00 119 08:40 08:55 Too Wet 09:00 09:30 260 08:50 09:05 5-10 Min. 09:10 09:20 3 1/2" 245 09:05 09:20 09:20 09:30 3" 262 09:26 09:30 09:30 09:40 259 09:25 09:35 09:40 09:45 3" 257 09:30 09:45 09:50 10:00 254 09:40 09:50 10:00 10:10 250 09:50 10:05 " 10:10 10:20 3 1/2" 124 10:00 10:15 10:15 10:30 156 10:15 10:25 10:30 11:10 MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 33 DATE: 4/19/95 Client: F nstructors, Inc. Project: 4i Oottling & Distribution Center, Northampton; . Contractor: S-F Concrete r Producer: Construction Service { Location of Concrete Placement: Slab on Grade, Lines A-C, 3-5 2 6 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newt n _� CYLINDER FABRICATION DATE CAST: 4/19/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 08:30 257 3500 3 1/2" Slab on Grade- A3-B3 Line Set #2-A,B,C,D,E 09:15 260 3500 3 1/2" Slab on Grade- :A4-B4 Line Set #3-A,B,C,D 09:45 259 3500 3" Slab on Grade- B3-C3 Line Set #4-A,B,C,D,E 09:55 250 3500 3 1/2" Slab on Grade- B4-C4 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Cone. Temp. 7. Air 07:45 260 3" 46°F 62°F 2.5 08:15 245 2 1/2" 50°F 64°F 1.8 08:30 257 3 1/2" 50°F 63°F 2.0 09:15 260 3 1/2" 50°F 64°F 2.4 09:45 259 3" 53°F 62°F 1.8 09:55 250 3 1/2" 58°F 64°F 2.2 REMARKS: 1. Temperatures inside building ranged from 45° - 58°F. 2. Unit Weight - 155.2 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. � 4 By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ---Z4fg ALLIED TESTING LABORATORIES, INC. 1 1 S St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 32 DATE: 4/10/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Dock Leveler Pits - Slab Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 4/10/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 13:30 136 3000 3 1/2"'°p';' Slab, Dock Leveler Pits F STUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. 7 Air 13:30 136 3 1/2" 50°F 68°F 4.2 Weather: Sunny/Mild No. Yds: 3 1/2 REMARKS: 1. Outside temperatures ranged from 280 - 50°F. 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #RO1. Respectfully submitted, ALLIED ��T�ES'TI'N/G LABORATORIES, INC. O-flv(%E{'�� v,4-�& By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. I 15 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 31 DATE: 4/3/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Dock Leveler Pits, Wl Line, WJ to WN Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 4/3/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 11:30 156 3000 4" Dock Leveler Pits W1 Line, WJ to WN SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 11:30 156 4" 50°F 60°F 5.2 Weather: Sunny/Mild REMARKS: 1. Outside temperatures ranged from 300 - 55°F. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 30 Client: Faciity Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Service Location of Concrete Placement: Wall, W1 Line WK-WM Reported to: Faciity Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/30/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION i A,B,C,D 11:30 258 ` 3 #fda23,. W1'E;Ine WK-' SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 11:30 258 45°F 62°F 4.8 REMARKS: 1. Outside temperatures ranged from 300 - 45°F. 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #RO1. Respectfully submitted, ALLIED TEEST'I'NG LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 29 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, NOrthampton, MA,;-,I,,, Contractor: DOS Concrete ` 3 { Producer: Construction Service Location of Concrete Placement: Reported to: Facility Constructors, Inc. - Attention: Mr. John NewtoQ���'iyE � , nl YLINDER k' BRZAT : DATE CAST: 3/28/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 13:30 258 e, Ott SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 13:30r � 50°F 68°F 4.0 REMARKS: 1. Outside temperatures ranged from 32° - 54°F. 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #RO1. Respectfully submitted, ALLIED TEST� �ABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. -Z4f1;; ALLIED TESTING LABORATORIES, INC. I 15 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 28 D 3/2719.5 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Dock Levelers Pits at W1 Line Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/27/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 13:30 252 3 1/2re Dock Levelers Pits at W1 Line SLUMP TEST TEMPERATURES AIR CONTENT Time Truck slump Air Temp. Conc. Temp. % Air 13:30 252 �2.f 52°F 66°F 4.2 Weather: Sunny/Cool No. Yds: 11 REMARKS: 1. Outside temperatures ranged from 41° - 57°F. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. Y.A a By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. -� ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 27 DAT&, 3/23/95, Client: Faciity Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall WR Line W2 to W1.5; Wal1'W3 WC to WA; Top Pier WP W2 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/23/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 15:00 254 4" Wall WR Line W2 to W1.5; Wall W3 Line WC to WA; Top Pier WP W2 SLUMP TEST TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 15:00 254 . 46°F 62°F 4.8 Weather: Cloudy REMARKS: 1. Outside temperatures ranged from 350 - 50°F. 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #RO1. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. Y.. P-P By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfrekd;Massackwsetts 01 104 Phone: (413) 736484 CONCRETE FIELD REPORT NO. 26 DAWN" Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall WR Line W4.5 to W2; Wall W1 Line WP.5 to WN.5; Interior Footing WP-W2 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/22/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 14:30 2443ti,4U � � 4 W2.. :. Co WN.5 Interior Footing WP-W2' SLUMP TEST TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 14:30 244 ' 48°F 60°F 4.6 Weather: Cloudy/Cool REMARKS: 1. Outside temperatures ranged from 370 - 52°F. 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #ROl. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. a 4w;r4& By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 1 1 S St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1 846 CONCRETE FIELD REPORT NO. 25 ,. 3/ 1j9 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall, WR Line W5.5 to W4 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/21/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 13:30 252Ot� l/' " Wall, WR Line W5.5 to W4 SLUMP TEST TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 13:30 252 " 54°F 66°F 2 REMARKS: 1. Outside temperatures ranged from 42° - 560F. 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #R01. Weather: Cloudy/Rain No. Yds: 19 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. -L4g--" ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 24 DATE: 3/20/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall WR Line W6.5 to W5, WR Line W1.5 to W1; Footing W1 Line WR-WP.5 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/20/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 13:00 245 3000 4" Wall, WR Line W6.5 to W5, WR Line W1.5 to W1 Set #2-A,B,C,D 15:30 250 3000 4" Footing, W1 Line WR-WP.5 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 13:00 245 4" 50°F 65°F 4.7 15:30 250 4" 53°F 66°F 4.9 REMARKS: Outside temperatures ranged from 340 - 530F. Weather: Sunny Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 23 DATE: 3/17/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall WR Line W8 to W6.5 - Footing W1 Line WP.5 to WM Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/17/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 13:15 245 3000 4" Wall WR Line W8 to W6.5 Set #2-A,B,C,D 15:00 252 3000 3" Footing W1 Line WP.5 to WM SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 13:15 245 4" 52°F 68°F 5.5 15:00 252 3" 50°F 64°F 4.6 REMARKS: 1. Outside temperatures ranged from 38° - 54°F. 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #RO1. Weather: Lt. Rain/Cloudy No. Yds: 70 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 22 DATE: 3/16/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall WR Line W9.5 to W8 - Footing W1 Line WR to WQ.5 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/16/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set 411-A,B,C,D 12:45 245 3000 2 1/2" Wall WR Line W9.5 to W8 Set 412-A,B,C,D 15:00 252 3000 3" Footing W1 Line WR to WQ.5 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 12:45 245 2 1/2" 58°F 64°F 4.2 15:00 252 3" 58°F 66°F 4.8 REMARKS: 1. Outside temperatures ranged from 360 - 58°F. 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #R01. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 21 DATE: 3/15/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall Wll Line WQ.S to WR; Wall WR Line Wll to W9.5; Interior Column Footing W2-WQ; Exterior Footing WR W2.5-W1 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/15/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 13:00 248 3000 3 1/2" Wall Wll Line WQ.S to WR Wall WR Line Wll to W9.5 Interior Column Footing W2-WQ Exterior Footing WR W2.5-W1 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slum Ai_r Temp. Conc. Temp. % Air 13:00 248 3 1/2" 54°F 66°F 4.4 REMARKS: 1. Outside temperature ranged from 40° - 54°F. 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #R01. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone; (413) 736-1846 L0a , CONCRETE `IELD REPORT N0. 20 DATE: 3/14/95 Client 4 't '""Facility"constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Exterior Footings WR Line W4.5 to W2.5 - Wall Wll Line j,TN.5- WQ.5 Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/14/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set 411-A,B,C,D 12:45 253 3000 2 1/2" Exterior Footings WR Line W4.5 to W2.5 Set 412-A,B,C,D 14:30 245 3000 3 1/2" Wall Wll Line WN.5-WQ.5 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 12:45 253 2 1/2" 52°F 64°F 4.8 14:30 245 3 1/2" 52°F 66°F 5.6 REMARKS: 1. Outside temperature ranged from 38°F - 55°F. 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #RO1. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 19 DATE: 3/13/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement:Exterior Footings WR Line W5.5 to W6.5 - Wall Wll Line WM-WN.5; Interior Column Footings W2-WK, W2-WL, W2-WM Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/13/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EKACT LOCATION Set #1-A,B,C,D 13:30 254 3000 4" Exterior Footings WR Line W5.5 to W6.5 Set #2-A,B,C,D 15:00 253 3000 2 3/4" Wall Wll Line WM - WN.5 Exterior Column Footings W2-WK, W2-WL, W2-WM SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck slump Air Temp. Conc. Temp. 7 Air 13:30 254 4" 62°F 72°F 5.4 15:00 253 2 3/4" 60°F 68°F 4.2 REMARKS: 1. Outside temperature ranged from 400 - 64°F 2. Reinforcing incorporated in today's placement found to be in agcordance with Drawing #RO1. Weather: Sunny/Mild Respectfully submitted. ALLIED TESTING LABORATORIES, INC. avet. v4.4,z. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 1 1 S St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 18 DATE: 3/10/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall W1 line WJ to WK: Ext. ftg. WR line Wll to W6.5; Int. col. ftgs. WL-W3, WM-W3, WN-W3, WQ-W3 Reported to: Facility Constructors, Inc. - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/10/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1 A,B,C,D 13:00 245 3000 2 1/2" Wall Wl line WJ to WK Set #2 A,B,C,D 15:00 258 3000 3" Ext.ftg. WR line Wll to W6.5; int.col.ftgs WL-W3, WM-W3,WN-W3, WQ-W3 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 13:00 245 2 1/2" 38°F 68°F 4.6 15:00 258 3" 36°F 66°F 4.2 REMARKS: 1. Outside temperature ranged from 28 - 36°F 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #RO1. Weather: mild/sunny Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 17 DATE: 3/9195 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Grade beam W3 line WE; wall Wll line WJ to WM; ext. ftg. WR line Wll to W8 Reported to: Facility Constructors, Inc. - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/9/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1 A,B,C,D 11:45 252 3000 4" Grade beam W3 line WE Set #2 A,B,C,D 15:00 245 3000 3" Wall Wll ne to WM.; ext. ftg. WR line W11 to W8 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 09:45 257 2 1/2" 38°F 61°F 4.3 11:45 252 4" 41 63 5.4 15:00 245 3" 39 60 5.0 REMARKS: 1. Outside temperature ranged from 35 - 41°F 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #RO1 3. Cold Weather Protection: Wall was covered and heated after pour. Footings were covered. Weather: sunny/cold Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 16 DATE: 3/8/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Footings W1 line WJ to WK; Int. column ftgs. WM-W4 WQ-W3; Exterior ftg. Wll line WQ-WR; wall W11 line WH to WJ Reported to: Facility Constructors, Inc. CYLINDER FABRICATION DATE CAST: 3/8/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1 A,B,C,D 11:00 127 3000 3 1/2" Footings Wl line WJ to WK Set #2 A,B,C,D 14:30 252 3000 2 3/4" Int.col.ftgs. WM-W4 WQ-W3; Ext. ftg. Wll line WQ-WR; wall Wll line WH to WJ SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. 7 Air 11:00 127 3 1/2" 58°F 70°F 4.0 14:30 252 2 3/4" 60°F 68°F 5.2 REMARKS: 1. Outside temperature ranged from 50 - 62°F 2. Reinforcing incorporated in today's placement found to be in accoreance with Drawing #R01. Weather: warm/sunny Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. --L4fj� ALLIED TESTING LABORATORIES, INC. 1 1 S St. George Road s Springfield, Massachusetts 01 104 Y Phone: (413) 736-1846 CONCRETE FIELD REPORT N0. 15 'fi t 3/7/95 `h Client: Facility Constructors, Inc. W Project: Coca Cola Bottling & Distribution Center, Northampton, MA. Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Exterior Ftgs. W11 Line WN to .WP.S - Interior Col. Ftgs.WN-W5 WP-W5 WQ-W5 - Footing WC-W11 to W6 - Wall WE-WG at W11 Line Reported to: Facility Constructors, Inc. - Attention: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/7/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1-A,B,C,D 10:15 257 3000 "} Exterior Ftgs. W11 Line WN to WP.S Set 912-A,B,C,D 13:00 125 3000 3" Int. Col. Ftgs. WN-W5 WP-W5 WQ-W5 Set X13-A,B,C,D 14:30 258 3000 2 1/2" Footing WC-W11 to W6 Wall WE-WG at W11 Line SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 10:15 257 $0. 43°F 66°F 5.4 13:00 125 3" 51°F 68°F 4.6 14:30 258 2 1/2" 50°F 62°F 4.0 REMARKS: 1. . A' SoAn 2 � F tfi" � ttc —?lacement found to be in accordance kith Weather: Cloudy/Mild Respectfully submitted, ALLIED TESTING LABORATORIES, INC. �X& aAa.- By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 14 DATE: 3/6/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall W11 WC to WE; int. ftgs. WM-W7, W6, .WP.W6, WP-W7, WQ-W6, WL-W5 Reported to: Facility Constructors, Inc. - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/6/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 13:30 245 3000 3 1/2" Wall W11 WC to IdE; int.ftgs. wTM1-W7, W6, WP.W6, WP-W7, WQ-W6, WL-W5 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 13:30 245 3 1/2" 44°F 66°F 4.5 REMARKS: 1. Outside temperature ranged 42 - 46°F 2. Reinforcing incorporated in today's placement found to be in accordance with Drawing #ROl. Weather: cloudy/mild Respectfully submitted, No. Yds: 50 ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, City of Northampton Bldg. Dept. C. Sherrill, Coca Cola Construction Site - � V k �er MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 13 DATE: 3/3/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall W11 line WA to WC; ext.col.ftgs. WK.5 to WM.5; Int.col.ftgs. WQ-W10 W9 W8; WP-W7 W10; W7-WN Reported to: Facility Constructors, Inc. - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/3/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1 A,B,C,D 11:30 254 3000 2 1/2" Wall Wll line WA to WC Set #2 A,B,C,D 14:30 .125 3000 3 1/2" Ext.col.ftgs. WK.5 to WM.5; Int. col ftgs. WQ-WlO W9 W8; WP-W7 W10; W7-WT SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 11:30 254 2 1/2" 42°F 66°F 4.8 14:30 125 3 1/2" 43 0F 64°F 4.2 REMARKS: 1. Outside temperature ranged from 32°-44°F 2. Reinforcing incorporated in today's placement found to be in accordance with drawing #ROI. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, City of Northampton Bldg. Dept. C. Sherrill, coca Cola Construction Site 8 OR, 1 1.'L' } MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / 1.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 12 DATE: 3/2/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall W3 line W8 to Wll; Int.col.ftgs. WM-W10 W9 W8 Ext.col.ftgs. WH to WK WN-W7 W8 W9 W10; WP W8 W9 W10 Reported to: Facility Constructors, Inc. - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 3/2/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1 A,B,C,D 11:30 252 3000 3" Wall W3 line W8 to Wll Set #2 A,B,C,D 15:00 258 3000 2J" Int.col.ftgs. WM-W10 W9 W8; ext. col. figs. WH to WK WN-W7 W8 W9 W10 WP-W8 W9 W10 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 10:00 258 2 1/2" 64°F 10:45 253 62°F 11:30 252 3" 42°F 64°F 4.8 15:00 258 2 1/2" 41°F 61°F 4.2 REMARKS: 1. Temperature range = 28°F to 42°F 2. Wall was tented and heated; temperature 55-65°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, City of Northampton Bldg. Dept. C. Sherrill, Coca Cola Construction Site r MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 11 Date: 3/1/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Exterior col. ftgs. line W11 WA to WH; int. col. ftgs. WL-W7,W8,W9; piers WB10, WC9, Reported to: Facility Constructors, Inc. - Att: Mr. John Newton fl CYLINDER FABRICATION g,i!:, 810 DATE CAST: 3/1/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1 A,B,C,D 13:00 254 3000 3 1/2" Exterior col. ftgs. line Wll WA-WH Set #2 A,B,C,D 14:30 133 3000 3" Int.col.ftgs. WL—W7,W8,W9 Piers WB10,WC9,WE9,WFl0,WG10 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 13:00 254 3 1/2" 42°F 60°F 4.6 14:30 133 3" 40°F 62°F 4.2 REMARKS: Contractor cautioned to provide cold weather protection. Outside temperature ranged 250 to 42° Reinforcing incorporated in today's placement found to be in accordance with drawing #R01 (footings-piers) Respectfully submitted, c,LLIED TESTING LABORATORIES, INC. Y.k a By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, City of Northampton Bldg. Dept. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. I 15 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 10 DATE: 2/23/95 Client: Facilities Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall WA line W5-W8; int. col. footings WK-W10, W8 W7 WL-W10 W9 Reported to: Facilities Constructors, Inc - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 2/23/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 14:00 126 Wall WA line W5-W8 Int.col. footings WK-W10 W8 W7; WL- W10-W9 SLUMP TEST TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 14:00 126 40°F 60°F Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 9 DATE: 2/22/95 Client: Facilities Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Wall @ loading dock area line W3, WA-WD, WA-W3,W5 Interior column footings WJ-W7 W8 W9 W10; WL-W8 Reported to: Facilities Constructors, Inc. - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 2/22/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 10:45 245 3000 3" Wall @ loading dock area line W3, WA-WD, WA-W3, W5; int.col. ftgs. WJOW7 W8 W9 W10, WL-W8 SLUMP TEST TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 10:45 245 3" 40°F 62°F 5.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. Y.-& v4 :-& By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FI hi�!REPORT NO. 8 DATE: 2/21/95 Client: _ __ _Fac`xlities Constructors, Inc. P�;6ject Coc� Cola Bottling & Distribution Center, Northampton, MA Contractor•''' ' DOS,-Concrete Producer: Construction Service Location of Concrete Placement: Exterior and interior column footings Reported to: Facilities Constructors, Inc. - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 2/21/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 11:00 126 3000 2 1/2" Exterior column footing WA-W9.5,W10 W10.5 Interior column footings WG-W7 W8,W9; WH-W7,W8,W9,W1O' footing W3 WD-WE SLUMP TEST TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 11:00 126 2 1/2" 40°F 62°F 4.8 REPIARKS: Reinforcing incorporated in today's placement found to be in accordance with drawing #RO1. Weather: Cloudy/mild Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. Anthony Patillo,' City of Northampton Bldg. Dept. . Mr. Charles Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. -w .... ..� ALLIED TESTING LABORATORIES, INC. f t' _ 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCR E P F9&D REPORT NO. 7 DATE: 2/20/95 Facilities Constructors, Inc. Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Interior column footings and exterior column footings Reported to: Facilities Constructors, Inc. - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 2/20/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 11:30 244 3000 2 1/2" Interior column footings, line WE-W10, WF-W7,W8,W9,W10; WA-W5.5,W6,W6.5,W7, W7.5,W8,W8.5,W9; Exterior column ftgs. columns W4-WG,WF,WE SLUMP TEST TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 11: 30 244 2 1/2" 50°F 60°F 4.5 REMARKS: Reinforcing incorporated in today's placement found to be in accordance with drawing #RO1. Weather: sunny/mild Respectfully submitted, ALLIED TESTING LABORATORIES, INC. 1X4 v� By: Chester V. Dawicki Director of Testing Services Copy: Mr. Anthony Patillo, City of Northampton Bldg. Dept. Mr. Charles Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. v �"? ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 a - 3 199v Phone: (413) 736-1846 CONCq't , SPORT NO. 6 DATE: 2/17/95 E��° Clie'' ?iAnr T! .°' � 'ci11ties Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Interior column footings and exterior footings Reported to: Facilities Constructors, Inc. - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 2/17/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1 A,B,C,D 11:30 132 3000 3" Interior column footings line WD-W7, W8,W9,WiO WE-W7,W8,W9 Set #2 A,B,C,D 15:00 119 3000 2}" Exterior footings line WA-W3 W6 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. I Air 11: 30 132 3" 40°F 60°F 5.0 15:00 119 2j" 56°F 4. 2 REMARKS: Reinforcing incorporated in today's placement found to be in accordance with drawing #RO1. Weather: sunny/mild Respectfully submitted, ALLIED TESTING LABORATORIES, INC. C44 v . - By: Chester V. Dawicki Director of Testing Services Copy: Mr. Anthony Patillo, City of Northampton Bldg. Dept. Mr. Charles Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 4 CONCRETE FIELD REPORT NO. 5 DAT 4 4. Client: Facilities Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement:- Interior column footings and exterior footings Reported to: Facilities Constructors, Inc. - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 2/16/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION Set #1 A,B,C,D 11:30 132 3000 2 1'/2"� Interior column footings line A- W8,W9,W10; $C-W7,W8,W9,W10 Set #2 A,B,C,D 14:00 254 3000 3*i'., Exterior footings line WB-WA W3 SLUMP TESTS TEMPERATURES AIR CONTENT Time Truck Slump Air Temp. Conc. Temp. % Air 11:30 132 ' 40°F 58°F 4.2 15:00 254 56°F 4.8 Weatheer: : Sunny/warm Respectfully submitted, ALLIED TESTING LABORATORIES, INC. yw-e v4--& By: Chester V. Dawicki Director of Testing Services Copy: Mr. Anthony Patillo, City of Northampton Bldg. Dept. Mr. Charles Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / .A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 CONCRETE FIELD REPORT NO. 4 DATE: 2/15/95 Client: Facilites Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Contractor: DOS Concrete Producer: Construction Service Location of Concrete Placement: Interior column footings Reported to: Facilities Constructors, Inc. - Att: Mr. John Newton CYLINDER FABRICATION DATE CAST: 2/15/95 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 15:00 124 3000 3 1/2" Interior ^ol.,3mn fontinas, line WB- W4,W5,W6,W7; line WK-W2,W3; line W3-WC-WB SLUMP TEST TEMPERATURES AIR CONTENT Time Truck Slu Air Temp. Cone. Temp. % Air 15:00 124 3 1/2" 26°F 60°F 5.2 Weather. : cloudy/cold Respectfully submitted, ALLIED TESTING LABORATORIES, INC. yt4tA t1- By: Chester V. Da:;icki Director of Testing Services Copy: Mr. Anthony Patillo, City of Northampton Bldg. Dept. Mr. Charles Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 84 of Soils Tests Date: 8/8/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) M (pcf) M 1 Center pier, west end in Freezer Cooler 100.8 13.6 104.2 96.7 2 Center pier, east end in Freezer Cooler 99.4 13.1 104.2 95.4 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site ! AlJ� ! ! p�3 f r MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. D TESTING LABORATORIES INC. 3 1 1 S St. George Road •Springfield, Massachusetts 01 104 _ Phone: (413) 736-1846 eP E , 3n l Tests Date;, J31/95 Client: Facility Constructors, Inc. Project: t rig; .0 pr1but.ion Center, Northampton,, MA Subject: So s Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) (7) BACKFILL OVER NEW SEWER LINES AT PARKING LOT 1 101.4 11.0 104.2 97.3 2 101.8 11.4 104.2 97.7 3 100.2 11.7 104.2 96.2 4 102.8 10.4 104.2 98.6 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 82 of Soils Tests Date: . fif,1�J95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) (7) RAMP INTO FREEZER-COOLER 1 1st lift 120.6 4.5 126.2 ,6 .m 2 1st lift 121.4 5.3 126.2 6.2 3 1st lift 120.2 5.5 126.2 95.2 4 lst lift 122.4 4.6 126.2 -17.0 5 2nd lift 119.8 5.3 126.2 6 2nd lift 121.2 3.8 126.2 1: 96,0 7 2nd lift 122.6 4.0 126.2 1,47.1 8 2nd lift 123.6 3.4 126.2 98.0 •' 9 3rd lift 121.4 4.3 126.2 . 10 3rd lift 122.6 4.7 126.2 . 11 3rd lift 123.4 4.7 126.2 7.$ 12 3rd lift 121.2 5.2 126.2 ? Respectfully submitted, ALLIED TESTING LABORATORIES, INC. n By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. . 81 of Soils Tests tie: 7/11/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. — Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD — ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) (�) SUBGRADE, MONTESSORI SCHOOL PARKING LOT 1 120.4 5.1 126.2 2 121.5 3.2 126.2 46.3 3 120.2 4.6 126.2 95.E 4 121.8 3.7 126.2 96.5 Respectfully submitted, ALLIED TESTING LnABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site r. �5 i rq €5 K '1b a 1S MEMBER:MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. I 15 St. George Road •Springfield, Massachusetts 01.104 Phone: (413) 736-1846 Report No. 79 of Soils Tests Date: 6/27/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject; Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) (7) SOUTH APRON UNDER PAVEMENT 1 i 122.2 7.5 126.2 96.8 2 123.5 4.9 126.2 97.9 3 121.8 3.0 126.2 96.5 4 122.8 3.7 126.2 97.3 5 124.6 4.2 126.2 98.7 6 121.2 4.4 126.2 96.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.TM. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ED TESTING LABORATORIES, INC. p 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 jepobto. 78 of Soils Tests Date: 6/26/95 CTient: Facility Constructors, inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (') (Pcf) (�) BACKFILL SMH1 to SMH2 1 100.4 14.1 104.2 96.3 1 2 ' 99.8 12.7 104.2 95.8 3 101.6 12.0 104.2 97.5 4 100.8 13.3 104.2 96.7 5 102.4 9.2 104.2 98.3 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. 4. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES.. INC. I 15 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 77 of Soils Tests Date: 6/12/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (�) SUB BASE ACCESS ROAD, SOUTH END, 1ST 100' 1 121.8 7.3 126.2 96.5 2 123.4 4.9 126.2 97.8 3 122.6 7.0 126.2 97.1 4 124.8 6.3 126.2 98.9 5 123.7 8.8 126.2 98.0 6 124.0 7.7 126.2 98.2 7 121.6 8.7 126.2 96.3 8 - - 123.0 7.0 126.2 97.5 Respectfully submitted, ...A , ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 76 of Soils Tests Date: 6/8/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) (�) SUB BASE UNDER CONCRETE SOUTH APRON, LAST 9 BAYS 1 123.5 7.3 126.2 97.8 2 126.0- 6.5 126.2 99.8 3 125.8 7.4 126.2 99.7 4 124.6 4.6 126.2 98.7 5 123.2 8.0 126.2 97.6 6 124.2 5.9 126.2 98.4 7 122.9 9.5 126.2 97.4 8 123.6 7.2 126.2 98.0 9 125.0 4.6 126.2 99.0 10 124.5 7.1 126.2 98.6 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, Cityof Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 75 of Soils Tests Date: 6/7/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (7) SUB BASE UNDER SOUTH APRON, 1ST 10 BAYS UNDER CONCRETE 1 121.8 7.3 126.2 96.5 2 125.6 5.3 126.2 99.5 3 124.2 7.6 126.2 98.4 4 123.4 5.2 126.2 97.6 5 122.8 7.3 126.2 97.3 6 124.4 6.7 126.2 98.6 7 122.6 6.2 126.2 97.1 8 125.2 7.3 126.2 99.2 9 124.3 5.1 126.2 98.5 10 124.8 7.4 126.2 98.9 11 ? "'" 123.8 7.1 126.2 98.1 12 14'; 124.1 6.0 126.2 98.3 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 1 1 S St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 74 of Soils Tests Date: 6/6/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (7) BACKFILL BEHIND RETAINING WALL, SOUTH APRON 1 1st lift 100.6 11.7 104.2 96.5 2 1st lift 103.3 11.0 104.2 99.1 3 2nd lift 101.4 12.0 104.2 97.3 4 2nd lift 100.1 11.2 104.2 96.1 5 3rd lift 102.5 10.4 104.2 98.4 6 3rd lift 99.8 13.0 104.2 95.8 7 4th lift 101.8 11.8 104.2 97.7 8 4th lift 102.4 9.2 104.2 98.3 9 Top lift (gravel) 124.2 6.5 126.2 98.4 10 Top lift (gravel) 123.5 7.3 126.2 97.8 Respectfully submitted, y ALLIED TESTING LABORATORIES, INC. [i ft 51995 DT U, By: Chester V. Dawicki � r{^� Director of Testing Services Copy: Mr. A. Patillo, City of Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 1 1 S St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 73 of Soils Tests Date: 6/5/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (�) FIRE LOOP UNDER SOUTH APRON 1 100.4 13.1 104.2 96.3 2 101.2 10.9 104.2 97.1 3 p' ,3 100.8 13.7 104.2 96.7 4 'I ` 99.5 13.2 104.2 95.5 5 10 1 102.4 12.5 104.2 98.3 6 �S 101.5 10.9 104.2 97.4 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, Cityof Northampton Bldg. Dept. Mr. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 72 of Soils Tests Date: , 6/2/95 Client: Facility Constructors, Inc. --, Project: Coca.Cola Bottling and Distribution Center, North 40,9 f� 0 W la ` Subject: Soils Tests � ��a . a• Reported to: Facility Constructors, Inc. - Att: Mr. John Newto SUN TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D292A DEFT OF BUILDING IPJSP 10j ���JS NORTHAMPTON MA OlG6O TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) M BACKFILL @ RETAINING WALL APRON SIDE - LOADING DOCK 1 101.4 11.0 104.2 97.3 2 103.6 9.6 104.2 99.4 3 ' 100.4 11.2 104.2 96.4 ` 4 101.2 10.2 104.2 97.1 5 102.8 11.3 104.2 98.7 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. Za v4 :. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, City of Northampton Bldg. Dept. Coca Cola Construction Site, Mr. J. Sullivan MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413)736-1846 Report No. 71 of Soils Tests Date:r, 3/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Nortl Mt , Subject: Soils. Tests v • k Reported to: Facility Constructors', Inc. a TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD — ASTM D2922 DEPT OF BUILDING INSPECTIONS NORTHAMPTON,MA 01060 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (Pcf) C7) BACKFILL AROUND CB 1 SOUTH DOCK$ 1 ! 101.6 10.6 104.2 97.5 2 1 100.2 10.6 104.2 96.2 3 ' 102.6 10.3 104.2 98,5 BACKFILL AT RETAINING WALL, NORTH SIDE 4 101.5 12.9 104.2 97.4 5 99.8 13.0 104.2 95.8 6 100.4 11.1 104.2 96.3 7 101.3 8.8 104.2 .2 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, City of Northampton Bldg. dept. Coca Cola Cosntruction Site, Mr. J. Sullivan MEMBER: A.S.TM. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES; INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 70 of Soils Tests Datft 25/95 t' Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. — Att: Mr. John Newton Inspector on site this date observed excavation for retaining wall at south shipping docks. tue to high water tablib that excess in this area, it was , over excavated and 18" of stone was put in place to stabilize the soil below footing. Also began excavation for south apron. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, City of Northampton Bldg. Dept. Coca Cola Construction Site, Mr. J. Sullivan MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. f M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 69 of Soils Tests a 5/23/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) M (pcf) M FINE GRADING BELOW SLAB LINES J.5-M 1-4 1 r' 126.4 4.7 130.0 =x,97.2 2 128.2 5.0 130.0 98.6 3 127.3 6.4 130.0 '98.0 4 126.7 5.6 130.0 97.5 5 129.0 5.3 130.0 99.2 6 128.4 3.4 130.0 98.8 7 126.0 4.3 130.0 '97.0 8 127.6 4.6 130.0 18.1 9 126.6 6.2 130.0 97:4 10 129.1 4.7 130.0 99.3 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services a M 2 Copy: A. Patillo, City of Northampton Bldg. Dept. �1 Coca Cola Construction Site, Mr. J. Sullivan MAY 3 1995 � AY 0 F ..� _w. P,i du MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 68 of Soils Tests P ,ye: 5/22/9 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) (7) FINE GRADING BELOW SLAB M-P 1-5 LINES 1 125.2 5.1 130.0 i 2 127.5 4.6 130.0 $ 1 3 126.4 3.2 130.0 97.2 4 128.2 5.0 130.0 X8.6 5 127.3 4.3 130.0 •:98.0 , 6 126.0 4.6 130.0 96.9 FINE GRADING BELOW SLAB J.5-M 4-5 7 129.0 4.0 130.0 99.2 8 127.1 5.1 130.0 97.8 9 126.2 5.2 130.0 97.1 10 128.3 4.8 130.0 48.7 11 128.8 6.0 130.0 9901 12 125.4 5.9 130.0 96.5 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki - �•- Director of Testing Services Copy: A. Patillo, City of Northampton Bldg. Dept. MAY 3 01995 Coca Cola Construction Site, Mr. John Sullivan DEPT Of SUI �ar 0 !`�iUfti9 rr P� e, MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 67 of Soils Tests Date 9195. Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northamp ._. Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton 1\4 AY ,d .J TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 DEPT OF BUILDING INSPEL TIONS TEST DRY MOISTURE MAXI NORTIIAMPi0N MA 01060 NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) M (pcf) M FINE GRADING BELOW SLAB - LINE P-R 1-5 1 124.9 3.1 130.0 6.0 2 125.6 4.6 130.0 96.6 ., 3 ' 126.2 5.0 130.0 97.1 4 124.6 5.1 130.0 95.8 5 125.2 3.4 130.01.3 6 127.6 3.8 130.0 7 126.8 5.3 130.0 " 8 126.2 3.9 130.0 9 126.8 4.6 130.0 10 128.2 5.0 130.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, City of Northampton Bldg. Dept. Coca Cola Construction Site, Mr. John Sullivan a:r.. MEMBER: A.S.TM. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 66 of Soils Tests Date: . Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, NorthaiC- onq �( Subject: Soils Tests 15 Reported to: Facility Constructors, Inc. - Att: Mr. John Newtc SAY 2 3 TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922EpT�.,�f>�Sli C�?N�« S 1060 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) (7) FINE GRADING BELOW SLAB, LINES N-R 5-8 1 123.8 5.4 130.0 2 I 124.7 2.4 130.0 ± a�4 3 125.1 3.0 130.0 .2 4 126.6 2.2 130.0 .3 .,.E 5 123.6 3.1 130.0 .1 6 125.4 2.4 130.0 VT 7 124.5 2.2 130.0 8 127.4 3.4 130.0 9 126.8 4.4 130.0 10 125.3 5.9 130.0 11 128.2 5.0 130.0 y 12 125.0 5.9 130.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. A.. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, City of Northampton Bldg. dept. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.TM. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 65 of Soils Tests Dat 5} 7195. . Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Nort ����- --° Subject: Soils Tests �� - Reported to: Facility Constructors, Inc. - Att: Mr. John Ne� MAY 2 3 i99-7r TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D292 DEPT OF BUILDING INSPECTIONS NORTHAMPTON MA 01060 TEST DRY MOISTURE MA=Tff NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (�) FINE GRADE BELOW SLAB LINES K-N 5-8 S & F Concrete 1 / 126.4 5.1 130.0 2 127.2 4.9 130.0 X718 3 128.6 4.6 130.0 :9 4 126.2 4.2 130.0 0`.'1 5 125.4 5.9 130.0 X16.5 6 127.1 6.0 130.0 .8 7 129.4 4.7 130.0 9 '5 8 125.5 5.6 130.0 g .5 9 125.8 7.0 130.0 8 10 127.3 3.1 130.0 X8.0 11 126.6 5.7 130.0 12 127.7 5.5 130.0 98.2 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. e. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, City of Northampton Bldg. Dept. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road a Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 64 of Soils Tests D Client: Facility Constructors, Inc. `� �,i �R Project: Coca Cola Bottling & Distribution Center, Norm - Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John N IrMAY 2 21996 ' TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D292 DEPT OF BUILDING INSPECTION PvOr�THAhiFTON h1A 01060 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (Pcf) (Pcf) (7) NORTH LOADING DOCK APRON, SOUTH END STRIP 1 120.3 7.5 126.2Ty 2 122.7 8.3 126.2 3 122.7 7.2 126.2 4 124.6 7.7 126.2 5 121.1 7.4 126.2 ° - 6 123.3 8.3 126.2 97 CENTER STRIP_ 7 125.2 7.3 126.2 Z 8 124.2 6.6 126.2 ' ± 9 121.7 6.6 126.2 10 124.8 6.2 126.2 11 125.5 7.2 126.2 .G _ 12 123.7 6.4 126.2 Of NORTH LOADING DOCK APRON, NORTH END STRIP 13 123.0 6.3 126.2 7 14 122.1 6.0 126.2 15 124.8 7.1 126.2xi 16 126.0 6.2 ; 126.2 _ 17 124.6 8.1 126.2 ' 18 123.7 7.1 126.2 FINAL GRADE BELOW SLAB, LINES N-4 8-11 (S & F Concrete) 1 127.4 4.1 130.0 2 128.2 5.0 130.0 6 3 126.8 5.3 130.0 4 128.0 3.8 130.0 5 129.6 4.4 130.0 6 127.8 5.2 130.0 7 125.1 7.6 130.0 8 124.6 6.9 130.0 9 126.4 4.9 130.0 10 127.2 3.3 130.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Copy: Director of Testing Services A. Patillo, City of Northampton Bldg. Dept. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 63 of Soils Tests Date: Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northam b Subject: Soils Tests MAY i 819 Q .,. Reported to: Facility Constructors, Inc. - Att: Mr. John Newton " TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) M (pcf) FINE GRADING NINE K-N 8-11 S-F CONCRETE 1 124.9 3.3 130.0 96.1 2 124.6 3.3 130.0 95.8 3 r 125.3 2.2 130.0 96.4 4 125.2 3.2 130.0 96.3 5 126.2 4.6 130.0 97.0 6 130.3 3.6 130.0 100.2 7 128.9 4.1 130.0 99.1 8 124.6 4.4 130.0 95.8 9 124.7 3.1 130.0 95.9 10 124.2 3.1 130.0 95.6 11 130.6 4.7 130.0 100.5 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. G'L'-de-" v4 . By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. J. Sullivan, coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. I 15 St. George Road e Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 62 of Soils Tests Date>�. , = 95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests a Reported to: Facility Constructors, Inc. - Att: Mr. John Newton Flay - � r4 i� TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 OFBU N(;TEST DRY MOISTURE MAXI M DEPNRTHAM P ON MA 01C060N5 NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (%) (pcf) (7) SUBGRADE LINE N-R 8-11 1 1/ 125.2 2.3 122.8 9 2 ! 119.6 3.0 122.8 97.4 3 117.1 4.6 122.8 4 117.4 3.6 122.8 95.6 5 121.8 3.0 122.8 99.2 6 119.4 3.4 122.8 97.2"' 7 124.3 3.3 122.8 101.3 8 120.6 4.8 122.8 "08.2 9 121.6 5.4 122.8 0 10 122.0 4.6 122.8 `9.9.3" , 11 120.2 5.5 122.8 §8.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, :'Northampton Bldg. Dept. J. Sullivan, Coca Cola Construction Site __ MEMBER: A.S.T.M. A.C.I. A.W.S. A.S.N.T. M.C.I.B. I.A.C.R.S. ALLIED TESTIN.C�....�LABOR ATORIES, INC. 115 St. Georgeg Ad�S k i i�dA1 z husetts 01 104 hone: (413) 736-I UU MAY 1 7 W Report No. 61 of Soils Tests ate xJ95 Client: Facility Constuctors, CTIONS Project: Coca Cola Bottling and Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) M (pcf) M SUBGRADE LINES J-M 5-11 1 121.7 3.4 122.8 .E 2 122.6 4.2 122.8 x,99.9 3 119.5 6.0 122.8 97.3 4 119.0 2.6 122.8 15.9 5 123.0 3.9 122.8 100.2 6 126.0 6.2 122.8 P2.6. 7 123.9 3.9 122.8 .9 g 123.8 2.5 122.8 *ay.9` 9 116.9 4.0 122.8 ' •2 10 125.4 3.1 122.8 Q2•i Respectfully submitted, ALLIED TESTING LABORATORIES, INC. XA vA"z- By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 60-A of Soils Tests Date: 5/10/95 W 2 21 Client: Facility Constructors, Inc. 1�M Project: Coca Cola Bottling and Distribution Center, Northanpt Subject: Soils Tests R ILDINGWPRT. = ,S NORTHAMPTON W U Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (%T-- % (Pcf) SUB GRADE LINES M-R 1-8 1 120.7 4.0 122.8 98.3 2 i 119.8 5.3 122.89 'G 3 124.1 3.2 122.8 �f)� 4 123.1 3.4 122.8 1VO` 3 5 117.8 3.5 122.8 1S.9 6 122.9 3.3 122.8 l 7 123.3 3.7 122.8 8 117.8 6.7 122.8 ."" 9 118.5 4.8 122.8 10 119.7 6.3 122.8 .- 11 118.6 4.9 122.8 12 120.8 4.5 122.8 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. aLf, vA-,J'- By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 59 of Soils Tests Date: 5/8/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, No ;, Subject: Soils Tests " u Reported to: Facility Constructors, Inc. - Att: Mr. John Ne MAY ' 5 TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D292 J, ^N BtJ1LD'tdG '�S h1A 01066 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (7) FINE GRADING BELOW SLAB LINE E5-Ell to G5-Gll 1 125.6 2.4 130.0 96.6 2 125.0 3.2 130.0 96.1 3 ' 126.4 3.0 130.0 97.2 4 123.6 3.4 130.0 98.1 5 127.5 4.8 130.0 99.6 6 129.5 4.1 130.0 97.8 7 127.2 4.5 130.0 95.5 8 124.1 2.8 130.0 96.7 9 125.7 3.5 130.0 98.1 10 127.5 3.0 130.0 95.0 Respectfully submitted, ALLIED T-ELSTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. J. Sullivan;, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 60 of Soils Tests Date: 5/9/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Construction, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (7) FINE GRADING BELOW SLAB LINE G5-Gll to J5-Jll 1 123.5 2.9 130.0 95.0 2 1/ 124.0 3.2 130.0 95.3 3 ' 124.9 3.1 130.0 96.0 4 124.5 2.4 130.0 95.7 5 125.8 2.5 130.0 96.8 6 123.8 2.8 130.0 95.2 7 129.8 4.1 130.0 99.8 8 129.3 4.9 130.0 99.4 9 124.9 4.7 130.0 96.0 10 124.2 3.3 130.0 95.6 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road a Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 58 of Soils Tests Date: 5/5/95 Client: Facility Constructors,Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: . Facility Constructors, Inc. Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) (7) SUBGRADE BELOW SLAB G5 to Gll to J5 to Jll 1 121.6 3.7 122.8 99.0 2 ; 119.4 4.9 122.8 97.2 3 120.5 3.4 122.8 98.1 4 120.8 5.0 122.8 98.4 5 119.6 5.0 122.8 97.4 6 118.7 5.1 122.8 96.7 7 120.0 5.5 122.8 97.7 8 118.3 6.0 122.8 96.3 9 119.2 4.5 122.8 97.1 10 121.2 4.6 122.8 98.7 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. J. Sullivan, Coca Cola Cosntruction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 57 of Soils Tests Date: 5/4/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (7) SUBGRADE BELOW SLAB E5-G5, Ell-Gll 1 117.5 5.2 122.8 95.7 2 119.2 4.5 122.8 97.1 3 118.6 5.6 122.8 96.6 4 117.2 4.9 122.8 95.4 5 118.3 5.0 122.8 96.3 6 120.4 4.9 122.8 98.0 7 119.9 4.1 122.8 97.6 8 118.8 5.9 122.8 96.7 9 117.8 4.9 122.8 96.0 10 119.6 4.7 122.8 97.4 FINE GRADING BELOW SLAB LINES C5-Cll to E5-Ell 1 127.6 3. 9 130.0 98.1 2 128.0 4.2 130.0 98.5 3 126.4 4.2 130.0 97.2 4 125.2 4.3 130.0 96.3 5 127.4 4.1 130.0 98.0 6 128.4 3.2 130.0 98.8 7 126.5 3.9 130.0 97.3 8 127.1 4.3 130.0 97.8 9 126.2 4.4 130.0 97.1 10 128.8 3.9 130.0 99.1 Respectfully submitted, ALLIE TESTING LABORATORIES, INC. By: Chester AaMiZclki Copy: Director of Testing Services A. Patillo, Northampton Bldg. Dept. J. Sullivan, Coca Cola Construction Site MMEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 56 of Soils Tests Date: 5/3/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (Pcf) M (Pcf) FINE GRADING BELOW SLAB A5-05 to All-Cll 1 124.7 3.1 130.0 95.9 2 128.8 3.9 130.0 99.1 3 126.4 4.1 130.0 97.2 4 126.8 4.4 130.0 97.5 5 125.3 3.3 130.0 96.4 6 126.0 4. 2 130.0 97.0 7 127.5 4.8 130.0 98.1 8 124.8 4.0 130.0 96.0 9 125.1 4.4 130.0 96.2 10 128.4 3.4 130.0 98.8 11 128.6 3.0 130.0 99.0 12 127.5 3.8 130.0 98.1 REMARKS: Fine Grading work performed by S-F Concrete Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. iiit ALLIED TESTING LABORATORIES, INC. 115 St. George Road *Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 55 of Soils Tests Date: 5/2/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Q n S Reported to: . Facility Constructors, Inc. - Att: Mr. John Newton MAY 19-95- TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 DEPT O f BUI BUILDING P11 60 NS TEST DRY MOISTURE MAXIMU NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) SUBGRADE BELOW SLAB C5-E5 to Cll-Ell 1 118.5 4.9 122.8 96.5 2 119.4 5.3 122.8 97.2 3 120.2 5.0 122.8 97.8 4 120.6 4.0 122.8 98.2 5 119.2 5.8 122.8 97.1 6 120.8 3.5 122.8 98.4 7 121.6 3.9 122.8 99.0 8 120.0 4.8 122.8 97.7 NORTH END SPRINKLER RISER C LINE 9 117.4 5.4 122.8 95.6 10 117.2 5.4 122.8 95.4 11 118.3 5.2 122.8 96.3 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. J. Sullivan, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES; 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 54 of Soils Tests Date Client: Facility Constructors, Inc. co Project: Coca Cola Bottling and Distribution Center, Northampton, Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) SUBGRADE BELOW SLAB B5-05 to Bll-Cll 1 119.4 4.3 122.8 7.2= 2 122.1 5.3 122.8 X99.1 3 118.5 5.6 122.8 9 6.S" 4 120.7 4.5 122.8 98.3 5 119.9 5.5 122.8 97.6 z 6 120.2 4.4 122.8 97.9 7 121.6 4.2 122.8 99.0 g 119.8 5.5 122.8 95 9 120.0 3.8 122.8 10 120.2 4.6 122.8 90 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 53 of Soils Tests Date: 4/28/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton1e1! U MAY _ 41995 TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 .............. TEST DRY MOISTURE MAXI M` NO. LOCATION DENSITY CONTENT DENSITY '' COMPACTION (pcf) M (pcf) UNDERGROUND ELECTRICAL LINE J6-Jll 1 118.6 4.9 122.8 96.6 2 l 119.2 5.9 122.8 97.1 3 117.5 7.0 122.8 95.7 4 120.2 5.3 122.8 97.8 5 117.2 6.5 122.8 95.4 Respectfully submitted, ALLIED TESTING ABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 52 of Soils Tests Date: 4/27/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) SUBGRADE UNDER SLAB WA LINE W6-Wll 1 118.4 5.3 122.8 96.4 2 120.2 5.1 122.8 97.9 3 121.4 3.4 122.8 98.8 4 119.8 5.3 122.8 97.5 5 121.6 4.8 122.8 99.0 6 119.5 4.3 122.8 97.3 7 118.9 3.9 122.8 96.8 8 120.6 4.3 122.8 98.2 9 121.0 4.6 122.8 98.5 10 121.6 5.4 122.8 99.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. Y . vA.�'/-: By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 51 of Soils Tests Date: 4/25/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton , MA Subject: Soils Tests Reported to: Facility Constructors, Inc. — Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD — ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) UNDERGROUND ELECTRICAL FOR EMERGENCY LIGHTS AND EXHAUST FANS WA LINE 5-11 1 118.6 4.7 122.8 96.6 2 y- � � � � 117.5 4. 7 122.8 95.7 3 I ;.' IS 120.4 4.0 122.8 98.0 4 MAY 2 6% 119.3 4.5 122.8 97.1 5 118.2 6.1 122.8 96.2 6 DEPT r 31;1 '� 117.8 5.9 122.8 96.0 P, i'�J �aA,JiG6t? Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Construction Site NAEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 1 1 5 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 50 of Soils Tests Date: 4/24/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling & Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. — Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD — ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (Pcf) C') UNDERGROUND ELECTRICAL D LINE 6 to 11 FOR AIR ROTATION SYSTEM 1 ' 118.3 4.1 122.8 96.3 2 117.5 4.5 122.8 95.7 e`er 3 119.0 4.6 122.8 96.9 t 4 MAY 2 1919' 118.5 4.3 122.8 96.5 5 117.6 5.6 122.8 95.8 L[_P1 OF BUILDING MS" ; N�IRTNAIFTON Respectfully submitted, ALLIED TESTING LABORATORIES, INC. a a'"L'e- By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill;, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 49 of Soils Tests Date: 4/20/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (Pcf) (7) FINE GRADING LINE J1-J5 K1-K5 1 126.0 4.8 130.0 96.9 2 127.1 3.3 130.0 97.8 3 127.2 3.1 130.0 97.8 4 126.2 3.2 130.0 97.1 5 124.8 4.6 130.0 96.0 6 127.6 3.8 130.0 98.1 7 128.0 4.4 130.0 98.5 8 126.4 4.3 130.0 97.2 9 125.6 3.8 130.0 96.6 10 126.8 4.6 130.0 97.5 11 125.2 4.9 130.0 96.3 12 124.8 6.7 130.0 96.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. O�� V,A,�- By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 48 of Soils Tests Date: 4/19/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) M (Pcf) M SUBGRADE LINES C3-05 E3-E5 PLUMBING TRENCH 1 120.6 5.8 122.8 98.2 2 122.8 5.6 122.8 100.0 3 119.2 4.4 122.8 97.1 4 120.2 5.3 122.8 98.0 5 118.4 4.3 122.8 96.4 6 118.2 6.5 122.8 96.2 SUBGRADE LINES J3-J5 K5-K1 7 120.0 4.0 122.8 97.7 g 121.4 5.1 122.8 98.8 9 118.4 4.4 122.8 96.4 10 119.6 5.2 122.8 97.4 11 120.3 5.1 122.8 98.0 12 117.8 5.8 122.8 96.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr.Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. _ ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 47 of Soils Tests Date: 4/17/95 Client: 44W nstructors, Inc. Project: ottling and Distribution Center, Northampton, MA Subject: Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) SUBGRADE LINES A5-All 1 119.8 4.0 122.8 97.5 2 121.2 4.3 122.8 98.7 3 120.6 6.5 122.8 98.2 4 118.6 5.6 122.8 96.6 5 118.0 5.4 122.8 96.1 SUBGRADE LINES B5-Bll 6 120.4 4.3 122.8 98.0 7 119.7 4.0 122.8 97.5 8 120.2 5.3 122.8 98.0 9 119.6 3.5 122.8 97.4 10 121.5 3.4 122.8 98.9 11 119.8 4.2 122.8 97.5 12 120.1 5.5 122.8 97.8 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. T4r ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 46 of Soils Tests Date: 4/14/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION_ DENSITY CONTENT DENSITY COMPACTION (pcf) M (pcf) M SUB GRADE BELOW SLAB LINE A3-C3 A5-05 Sub Contractor: Gagliarducci Construction Co. 1 118.4 3.7 122.8 96.4 2 119.2 4.5 122.8 97.1 3 118.8 5.5 122.8 96.7 4 ! 117.6 5.2 122.8 95.8 . 5 120.4 4.1 122.8 98.0 6 119.0 4.4 122.8 96.9 7 118.6 6.7 122.8 96.6 8 119.6 6.5 122.8 97.4 BELOW SLAB LINES A3-C3 TO A5-05 Sub Contractor: S-F Concrete 1 127.2 3.2 130.0 97.8 2 125.4 2.9 130.0 96.4 3 123.6 4.0 130.0 95.1 4 126.4 3.5 130.0 97.2 5 125.6 5.4 130.0 96.6 6 128.4 4.8 130.0 98.8 7 124.2 5.5 130.0 95.5 8 125.4 4.3 130.0 96.5 9 124.8 6.2 130.0 96.0 REMARKS: Fine Grade work, done by S-F Concrete, above underground electrical and plumbing. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. - ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 45 of Soils Tests Date: 4/13/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (%) (pcf) (7) BELOW SLAB J3-J5 to E3-E5 Sub Contractor: S-F Concrete 1 128.8 2.9 130.0 99.1 2 126.1 4.2 130.0 97.0 3 124.6 2.6 130.0 95.8 4 125.6 2.2 130.0 96.6 5 126.4 4.0 130.0 97.2 6 127.2 4.2 130.0 97.8 7 128.6 2.8 130.0 98.9 8 125.4 3.5 130.0 96.5 9 125.8 4.0 130.0 96.8 10 126.4 4.9 130.0 97.2 11 128.4 3.3 130.0 98.8 12 129.2 2.6 130.0 99.4 Remarks: Finegrading of subgrade work done by S-F Concrete Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr.Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 44 of Soils Tests Date: 4/12/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) M (pcf) (%) SUBGRADE BELOW SLAB J3-J5 TO E3-E5 Sub Contractor: Gagliarducci Construction 1 118.2 2.7 122.8 96.2 2 118.5 5.8 122.8 97.3 3 117.5 4.9 122.8 95.7 4 118.8 4.9 122.8 96.7 5 117.2 4.5 122.8 95.4 6 120.6 3.0 122.8 98.2 7 121.8 2.7 122.8 99.2 8 119.6 4.8 122.8 97.4 9 120.8 4.8 122.8 98.4 10 117.6 5.0 122.8 95.8 11 118.4 5.2 122.8 96.4 12 119.2 4.0 122.8 97.1 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 43 of Soils Tests1 Date: 4/10/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) %) (pcf) %) BACKFILL OF DRAINAGE LINE, SOUTH END OF BUILDING DMH131-DMH4 1 101.2 12.2 104.2 97.1 2 100.8 11.6 104.2 96.7 3 99.6 14.8 104.2 95.6 4 100.1 11.5 J04 2 96.1 5 98.4 12.0 104.2 94.4 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site .MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. -- ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 42 of Soils Tests Date: 4/7/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) BACKFILL ROOF DRAINS K LINE 1-5 1 lst lift 102.6 11.3 104.2 98.5 2 101.5 13.7 104.2 97.4 3 102.4 11.1 104.2 98.3 4 103.8 12.1 104.2 99.6 5 101.8 10.5 104.2 97.7 6 2nd lift 116.8 3.1 122.8 95.1 7 118.6 3.2 122.8 96.6 g 118.6 3.2 122.8 97.0 9 119.8 4. 2 122.8 97.5 10 117.4 4.8 122.8 95.6 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 1 1 S St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 41 of Soils Tests Date: 4/6/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) �7) BACKFILL DRAIN LINE REMOVAL NORTH END OF BLDG. 1 117.3 4.3 122.8 95.5 2 119.2 6.0 122.8 97.0 3 118.6 5.2 122.8 96.6 4 116.8 5.9 122.8 95.1 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 40 of Soils Tests Date: 4/5/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (Pcf) (7) (Pcf) (7) BACKFILL AROUND DOCK LEVELER PITS W1 LINE WJ TO WN 1 118.6 4.9 122.8 96.6 2 120.2 4.5 122.8 98.0 3 117.5 4.8 122.8 95.7 4 119.4 3.8 122.8 97.2 5 118.8 3.4 122.8 96.7 6 117.0 5.4 122.8 95.3 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 39 of Soils Tests Date: 4/4/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. — Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD — ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (7) BACKFILL AROUND DOCK LEVELER PITS W3 LINE 1 118.4 4.9 122.8 96.4 2 117.8 6.6 122.8 96.0 3 120.6 5.0 122.8 98.2 4 118.0 4.7 122.8 96.1 5 119.5 4.4 122.8 97.3 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. (i,'r- v 410:1�1 By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 38 of Soils Tests Date: 4/3/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newt,on`` TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 j TEST DRY MOISTURE MAXIMUM W' NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) C7) (pcf) C7) BELOW DOCK LEVELER PITS W1 LINE WJ TO WN 1 118.8 4.8 122.8 96.7 2 121.4 5.1 122.8 98.8 3 119.6 4.6 122.8 97.4 4 117.3 5.9 122.8 95.5 5 118.2 6.4 122.8 96.2 6 120.3 5.1 122.8 98.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. e By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 1 1 S St. George Road .Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 37 of Soils Tests Da 3W31,/95 fi Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) BACKFILL @ W1 LINE WALL DOCK PIT LEVELERS 1 117.3 3.5 122.8 X5.5 2 119.7 3.2 122.8 5 3 120.4 2.1 122.8 'fl 4 118.1 5.3 122.8 5 117.8 6.4 122.8 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Norhampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. I 15 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 36 of Soils Tests Date: 3/30/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. — Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD — ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (Pcf) (Pcf) BACKFILL AROUND DOCK LEVELER PITS @ W1 LINE 1 118.2 6.9 122.8 2 117.0 6.4 122.8 3 119.6 4.7 122.8 4 120.2 5.0 122.8 7. ; 5 118.5 4.6 122.8 0."5 ' BELOW DOCK LEVELERS PITS @ W3 LINE 6 117.5 4.8 122.8 145-4, 7 7 119.1 4.3 122.8 8 120.6 4.1 122.8 .2,0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 "- Report No. 35 of Soils Tests X00 V ., Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampt? Subject: Soils Tests Reported to: Facility Constructors, Inc. — Att: Mr. John Newton L. . TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD — ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (7) BELOW DOCK LEVELER PITS W1 LINE 1 117.3 6.2 122.8 f 5.5 2 119.6 5.5 122.8 J91.4 3 118.5 5.6 122.8 5 4 120.4 3.6 122.8 x10.0 5 118.8 7.4 122.8 967 6 117.0 8.1 122.8 45.3 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 34 of Soils Tests Date: 'b-/24/9-5 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: FIELD DENSITY TESTS - ASTM D1556 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (7) BACKFILL INSIDE W1 LINE WP-WM LINE 1 117.4 5.3 122.8 2 120.2 4.3 122.8 97.9 3 119.6 4.0 122.8 ,_ .4 4 119.2 6.0 122.8 97.1 5 118.4 5.4 122.8 96.4` BACKFILL OUTSIDE W1 LINE WP-WM LINE 6 117.0 7.2 122.8 X95.3; 7 119.2 5. 9 122.8 97.1 8 120.6 3.5 122.8 ,W2 9 121.4 3.9 122.8 98.8 10 118.8 4.2 122.8 ",96:7 Respectfully submitted, ALLIED TTE. ESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 33 of Soils Tests Dt3 3/23/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION ~ (pcf) (pcf) (7) BACKFILL OUTSIDE W1 LINE WR TO WN 1 119.4 6.2 122.8 70-2 2 117.8 5.8 122.8 96.0 , 3 118.5 7.5 122.8 4 1204.4 4.8 122.8 98.0 BACKFILL INSIDE WR LINE W4 - W2 5 118.8 5.5 122.8 96.7 6 117.0 7.5 122.8 95.3 7 119.8 5.8 122.8 97.5 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road .Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 32 of Soils Tests 1/22/95 t Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY.' OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (') (Pcf) (�) BACKFILL INSIDE WR WALL AT W6 to W4 1 Elev. 95.00 119.8 5.5 122.8 2 Elev. 95.00 117.6 6.5 122.8 _a 95.8 3 Elev. 95.00 118.4 6.2 122.8 96.4 ,4 4 Elev. 95.00 120.4 6.0 122.8 98.0` 5 Elev. 97.00 116.8 4.0 122.8 A5.1 6 Elev. 97.00 117.6 5.9 122.8 5.8 7 Elev. 97.00 118.2 6.5 122.8 ,�6.2 8 Elev. 97.00 117.4 5.3 122.8 95.6 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. v4"'e- By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 1 1 S St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 31 of Soils Tests Date: 3/21/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM No. LOCATION DENSITY CONTENT DENSITY COMPACTION (Pcf) (Pcf) BACKFILL INSIDE W3 LINE WA TO WC 1 118.6 6.3 122.8 96.8 2 120.4 6.0 122.8 98.0 3 119.2 5.2 122.8 97.1 4 119.6 5.5 122.8 97.4 BACKFILL WR LINE W9-W6 5 120.2 5.6 122.8 97.9 6 120.5 6.1 122.8 98.1 7 117.8 5.8 122.8 96.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site ,MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 30 of Soils Tests Date: 3/17/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northamptonv- M - - Subject: Soils Tests ; Reported to: Facility Constructors, Inc. — Att: Mr. John Newton 3 ( t TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD — ASTM D2922 F _ ` TEST DRY MOISTURE NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (7) BACKFILL INSIDE WR LINE Wll—W9 1 117.4 4.4 122.8 95.6 2 118.5 5.1 122.8 96.5 3 119.0 6.4 122.8 96.9 4 117.8 5.4 122.8 96.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ""Tu`__`,,A,'­L'LIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. ;,r--29 of Soils Tests Date: 3/16/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) L7) BACKFILL INSIDE Wll LINE WN-WR 1 117.4 4.6 122.8 95.6 2 118.8 5.5 122.8 96.7 t 3 119.2 4.5 122.8 97.1 4 117.8 4.9 122.8 96.0 5 118.2 6.9 122.8 96.2 6 120.4 6.0 122.8 98.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 28 of Soils Tests Date: 3/15/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (�) BACKFILL INSIDE W11 LINE WK.5 to WP 1 119.6 5.7 122.8 97.4 2 120.4 7.0 122.8 98.0 3 118.3 5.3 122.8 96.3 4 117.6 6.1 122.8 95.8 5 119.0 5.7 122.8 97.0 6 120.1 6.2 122.8 97.8 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill;, Coca Cola Cosntr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.1.B. / I.A.C.R.S. ow EI-,. ALLIED TESTING LABORATORIES, INC. l ! 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 27 of Soils Tests Date: 3/14/95 ClieTk. Facility Constructors, Inc. Project,:"'- Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (Pcf) (Pcf) M 1 Backfill inside Wl line WJ-WK, lst: lift, elev. 94.60 117.4 6.1 122.8 95.6 2 same as above 118.3 5.5 122.8 96.3 3 2nd lift 117.8 4.6 122.8 96.0 4 Same as above 116.9 6.2 122.8 95.2 5 Backfill outside Wl line WJ-WK, 1st lift, elev.94.60 118.8 5.7 122.8 96.7 6 Same as above 119.5 6.8 122.8 97.3 7 2nd lift 117.5 7.6 122.8 95.7 8 Same as above 119.2 5.3 122.8 97.1 9 Below interior col. footing line W2-WQ 100.4 13.3 104.2 96.3 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. txk vA-, - By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 26 of Soils Tests Date: 3/13/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (Pcf) (pcf) M INTERIOR COLUMN FOOTING 1 WL-W2 99.6 14.7 104.2 95.6 2 WM-W2 ; 100.7 12.6 104.2 96.6 3 WN-W2 101.8 13.3 104.2 97.7 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: ester . `awicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. --y C. Sherrill, Coca Cola Constr. Site O M LM,A R 16 ' ' F DEPT Or Wii.D!NG INSPLCT10:43 N'0fiTHWPTrt4 MA 010H MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. �4Nr ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 25 of Soils Tests Date Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soil Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) t') (pcf) C7) BAC'KFILL INSIDE W11 LINE WF-.TH 1 l 118.0 5.2 122.8 06..1 j 2 117.4 4.5 122.8 .6' 3 120.4 5.1 122.8 ":.0 4 119.2 5.3 122.8 07.1 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. ytz;a aA�- By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.TM. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES; ; 1 ,�w ► .,.? , 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 A i Report No. 24 of Soils Tests Date: $' Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) C') BELOW INTERIOR COLUMN FOOTINGS 1 WL-W3 101.6 13.6 104.2 97.5 r 2 WM-W3 99.9 13.7 104.2 95.9 3 WN-W3 100.6 13.5 104.2 96.5 BACKFILL INSIDE Wll LINE WD TO WF 4 117.6 4.1 122.8 95.7 5 119.2 3.7 122.8 97.1 6 118.6 5.2 122.8 96.6 7 117.8 6.6 122.8 96.0 situation at WR line from Wll to W6 at ootin ova s 4u.., : tY.Lhs correct a sump pump was installed at W6 line to relieve ",. . . f Lion. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 23 of Soils Tests . " Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) C7) (pcf) FOOTING WC LINE W6-Wll 1 119.6 5.7 122.8 97.4 2 118.2 5.4 122.8 96.2 3 120.1 6.1 122.8 97.8 4 118.6 6.1 122.8 96.6 BACKFILL INSIDE W11 LINE WA TO WE 5 119.2 5.4 122.8 97.1 6 118.4 7.0 122.8 96.4 7 119.8 7.2 122.8 97.5 8 120.8 3.4 122.8 98.4 BELOW INTERIOR COLUMN FOOTING - 9 W4-WQ 99.2 15.3 104.2 95.2 10 W4-WD 100.4 13.3 104.2 96.1 11 W4-WN 101.6 13.8 104.2 97.5 12 W4-WM 100.1 13.2 104.2 96.1 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. X& Iv By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC.. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 22 of Soils Tests '/ Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: SIEVE ANALYSIS— Lab. No. 6085 .� Identification: Stone material for wet area Passing Sieve No. 7 Pass ` 1 1/2 100.0 1 55.4 3/4 31.6 1/2 13.1 3/8 6.9 4 4.5 8 4.2 16 3.9 30 3.2 50 2.4 100 1.8 200 .8 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. Y76 vA' - By: Chester V. Dawicki Director of Testing Services MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 21 of Soils Tests Date: 3/6/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) M (pcf) M BACKFILL INSIDE WA LINE W8-Wll 1 118.0 5.6 122.8 96.1 2 119.4 6.0 122.8 97.2 3 120.1 6.2 122.8 97.8 4 118.5 5.6 122.8 96.5 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 1 1 S St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 20 of Soils Tests Date: 3/3/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) (7) BACKFILL INSIDE WA LINE W6-W8 1 119.4 5.9 122.8 97.2 2 j 120.2 4.5 122.8 97.9 3 118.4 5.1 122.8 96.4 4 119.0 6.5 122.8 97.0 5 118.2 5. 7 122.8 96.1 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site EArkADCD n cTne / nr- i / A %AIC n cNIT I AAr^ Ia l I er' Pc ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 19 of Soils Tests Date: 3/2/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton REMARKS: Severe water conditions existing starting on Wll at WK.5 to WN this date. Due to these conditions, each exterior footing was over excavated and stone was put in place to correct elevation. Two sub-pumps were installed to remove excess water from this area during construction of forms for footings. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. YZA4 aA"...& By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site F MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 1 1 S St. George Road 9 Springfield, Massachusetts 01104 Phone: (413) 736-1846 Report No. 18 of Soils Tests Date: 3/1/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (Pcf) (7) (pcf) (7.) BELOW EXTERIOR FOOTINGS LINE W11, WF-WK 1 99.5 14.0 104.2 95.5 2 100.4 15.1 104.2 96.3 3 100.8 13.7 104.2 96.7 4 99.8 15.4 104.2 95.8 5 100.1 13.9 104.2 96.1 6 101.0 13.1 104.2 97.0 7 99.4 13.5 104.2 95.4 8 100.6 13.8 104.2 96.5 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site a MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.1.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. I 15 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 17 of Soils Tests Date: 2/28/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE -BY NUCLEAR METHOD- ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (Pcf) (Pcf) BACKFILL OUTSIDE W3 AT WA-WC 1 119.6 4.8 122.8 97.4 2 117.8 5.4 122.8 96.0 3 !' 118.0 7.3 122.8 96.1 i 4 120.4 6.0 122.8 98.0 Weather: heavy rains Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / .A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. '"" Ni.:.,y{Y:i ICY• I k A ProgfieQ,1'lassach use tts 01 104 Phone: (413) 736.1 846 Report No. 16 of Soils Tests Date: 2/27/95 Client: Facility Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facility Constructors, Inc. — Att: Mr. John Newton. TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD — ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) M (Pcf) (7.) BACKFILL INSIDE LINE W3 WA TO WE 1 118.2 5.4 122.8 96.2 2 119.4 5.2 122.8 97.2 3 117.6 5.6 122.8 95.8 4 117.2 5.5 122.8 95.4 5 119.8 6.3 122.8 97.5 6 118.6 6.7 122.8 96.6 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: A. Patillo, Northampton Bldg. Dept. C. Sherrill, Coca Cola Constr. Site 1i t MFMRFR: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 15 of Soils Tests Client: Facilities Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facilities Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) BELOW INTERIOR COLUMN FOOTING 1 WP-W4 100.4 14.1 104.2 96.3 2 WP-W5 99.1 13.8 104.2 95.1 3 WP-W6 101.5 14.1 104.2 97.4 4 WP-W7 118.6 4.4 122.8 96.6 5 WP-W8 117.8 5.8 122.8 96.0 6 WP-W9 119.4 5.9 122.8 97.2 7 WP-W10 118.8 6.0 122.8 96.7 8 WQ-W4 98.6 15.0 104.2 95.0 9 WQ-W5 100.5 15.2 104.2 96.4 10 WQ-W6 101.3 13.3 104.2 97.2 11 WQ-W7 118.6 5.8 122.8 96.0 12 WQ-W8 119.4 4.3 122.8 97.2 13 WQ-W9 120.2 5.5 122.8 97.9 14 WQ-W10 118.6 5.6 122.8 96.5 119.8 6.5 122.8 97.5 120.6 4.3 122.8 98.2 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. A. Patillo, Northampton Bldg. Dept. Mr. C. Sherrill, Coca Cola Constr. Site. MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. L- 115 St. George Road + Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 14 of Soils Tests Client: Facilities Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facilities Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (Pcf) (Pcf) BELOW INTERIOR COLUMN FOOTING 1 WL-W4 100.4 13.1 104.2 96.3 2 WL-W5 99.2 13.3 104.2 95.2 3 WL-W6 101.2 14.2 104.2 97.1 4 WL-W7 118.4 2.7 122.8 96.4 5 WL-W8 117.2 4.6 122.8 95.4 6 WL-W9 119.2 4.4 122.8 97.1 7 WL-W10 118.8 4.0 122.8 96.7 8 WM-W4 100.4 14.3 104.2 96 ' a 9 WM-W5 101.8 13.5 104.2 97.7 10 WM-W6 100.6 15.7 104.2 96.5 11 WM-W7 118.2 3.2 122.8 96.2 12 WM-W8 119.4 5.2 122.8 97.2 13 WM-W9 120.2 5.5 122.8 97.8 14 WM-W10 119.8 6.4 122.8 97.5 15 WN-W4 99.2 13.5 104.2 95.2 16 WN-W5 100.6 13.8 104.2 96.5 17 WN-N6 101.4 13. 6 104.2 97.3 18 WN-W7 120.6 5.5 122.8 98.2 19 WN-W8 119.5 5.9 122.8 97.3 20 WN-W9 117.8 3.9 122.8 96.0 21 WN-W10 118.6 5. 7 122.8 96.6 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. Copy: Mr. A. Patillo, Northampton Bldg. Dept. , Mr. C. Sherrill, Coca Cola Constr.Site. By; Chester V. Dawicki Director of Testing Services MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 s w Report No. __13 of Soils Tests Client: Facilities Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facilities Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (pcf) BELOW INTERIOR COLUMN FOOTINGS 1 Line WJ-W7 99.5 13.4 104.2 2 Line WJ-W8 101.6 12.4 104.2 97.5 3 Line WJ-W9 100.1 13.3 104.2 96.1 4 Line WJ-W10 100.8 13.9 104.2 96.7 5 Line WK-W10 100.0 12.4 104.2 95.9 6 Line WK-W'9 101.8 13.5 104.2 97.7 7 Line WK-1k'8 102.2 11.7 104.2 98.1 8 Line WK-W7 99.2 13.9 104.2 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. Anthony Patillo, Northampton Bldg. Dept. Mr. Charles Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 12 of Soils Tests Date: Client: Facilities Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facilities Constructors, ' Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (%) (Pcf) (7) BELOW INTERIOR. FOOTINGS 1 Line WG-W7 97.6 15.2 101.1 96.5 2 Line WG-W8 99.4 11.1 101.1 98.3 3 Line WG-W9 98.4 15.4 101.1 97.3 4 Line WG-W1.0 98.2 14.9 101.1 97.1 5 Line WH-W7 97.8 14.1 101.1 96.7 6 Line WH-W8 96.9 16.8 101.1 95.8 7 Line WH-W9 97.2 15.0 101.1 96.1 8 Line WH-W10 98.6 14. 2 101.1 97.5 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. Anthony Patillo, Northampton Bldg. Dept. Mr. Charles Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. =OWN I -14r ALLIED TESTING LABORATORIES, INC. 115 St. George Road .Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 11 of Soils Tests Date: Client: Facilities Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northampton, MA Subject: Soils Tests Reported to: Facilities Constructors, Inc. - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (') (pcf) (7.) INTERIOR COLUMN FOOTINGS 1 Line WF-W1_0 101.4 13.0 104.2 97.3 2 Line WF-W9 100.6 14.5 104.2 96.5 3 Line WF-W8 101.8 14.3 104.2 97. 7 4 Line WF-W7 99.4 13.7 104.2 95.9 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. lZ& a 44va., By: Chester V. Dawicki Director of Testing Services Copy: Mr. Anthony Patillo, Northampton Bldg. Dept. Mr. Charles Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 73&,-,!846 REVISED Report No. 10 of Soils Tests 3 2 1895 Client: Facilities Constructors, Inc. �;�� SU Project: Coca Cola Bottling and Distribution C= II' 7;'J� tpton, MA Subject: Soils Tests 1 Reported to: Facilities Constructors, Inca - Att: Mr. John Newton TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION_ DENSITY CONTENT DENSITY * COMPACTION (Pcf) (Pcf) BELOW COLUMN FOOTINGS 1 Line ivB W-10 98.4 14.2 101.1 2 Line WC-W7 97.8 13.5 101.1 96.7 3 Line WC-W8 99.5 10.9 101.1 98.4 4 Line WC-W9 100.1 13.1 101.1 99.0 5 Line WC-Wl0 98.8 14.2 101.1 97.7 6 Line W5-W7 @ WA 99.8 12.4 101.1 98.7 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services Copy: Mr. Anthony Patillo, Northampton Bldg. Dept. Mr. Charles Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. : hc ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 9 of Soils Tests Date r Client: Facilities Constructors, Inc. Project: Coca Cola Bottling and Distribution Center, Northamp>ton, Subject: Soils Tests `' FEB Reported to: Facilities Constructors, Inc. - Att: Mr. John Newton on that exists along line W3 from WA to WE, each R � 4;4wr excavated and stone was put in to bring footings up to After talking to representative of Huntley Associates, it was decided as an ".insurance" policy to instail,..,interior footing drains. TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 ' TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (Pcf) BELOW COLUMN FOOTINGS 1 Line WK-W2 100.4 13.7 104.2 96.3 2 Line WK-W3 99.5 13.1 104.2 95.5 3 Line WB-W4 101.8 13.3 104.2 97. 7 4 Line WB-W5 100.5 12.0 104.2 96.4 5 Line WB-W6 102.8 13.4 104.2 98.6 6 Line WB-W7 100.2 14.5 104.2 96.2 7 Line WB-W8 99.9 15.4 104.2 95.9 8 Line WB-W9 101.4 11.2 104.2 97.3 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. %0 vA By: Chester V. Dawicki Director of Testing Services Copy: Mr. Anthony Patillo, Northampton Bldg. Dept. Mr. Charles Sherrill, Coca Cola Construction Site MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S.