25A-046 (9) The Children's House, Minutes 5/9/97, page 2. 12. Job Meetings: These will be held Thursdays at 8:00, with the first Meeting scheduled for Thursday 15 May 1997 u(D, 9:00 am. Laura, Roger, and Owner's representatives will meet just prior to this at 8:00 am. Respectfully Submitted, • Laura Fitch, AIA Margo Jones Architects cc: Susan Swift; Bob Raymond; Roger Cooney; Wright Builders; Tony Patillo,Northampton Building Inspector AFTER MEETING ACTIONS: 1. Contract signed between Owner and Wright Builders 12 May 1997. 2. Corridor rating: Laura will review code to double check that 1 hour rating was intentionally deleted. — Y,#V 11,011,f ^&v Gods>. 3. Conservation Commission approved plan on 5/12. 4. ANR Plan signed by City Planning Dept on 5/12. 5. Bruce Cleare requested list of submittals that will be required by MJA/FCD. 6. Bruce requested submittal process information, i.e. submit to FCD & cc MJA or visa- verse. 7. Bruce applied for building permit at City of Northampton. MARGO JONES Architects May 13, 1997 THE CHILDREN'S HOUSE. a Montessori School Pre-Construction Conference: 09 May 1997 Present: Susan Swift, Director & BC; Herb Mayer, Treasurer & BC; Bob Raymond, Chair BC; Bob Brick, President of Board & BC; Jonathan Wright, Skip Valencik (site foreman), Bruce Cleare (job manager), Wright Builders, Inc.; Roger Cooney, Full Circle Design; Laura Fitch, MJArchs. ITEMS OF DISCUSSION: 1. Permit: Wright Builders needs a recorded plan before they car, proceed with building permit application. Roger will go to City Hall from here. The inspector is away until Tuesday. 2. Utility Survey: Skip said they will be marking utilities with orange lines soon. 3. Contract: The Contract was reviewed with particular attention paid to May 9th clarification list. 4. Lighting: Wright Builders is carrying $7,474 allowance. They do not think the lighting levels are adequate and cannot increase specified lighting without raising this allowance. This will be handled with submittals (and Change Order if necessary). 5. Other items that will be specifically addressed at submittal stage: Ceiling tile, ceilings in classrooms, VCT. 6. Decisions: Wright Builders will provide a spread sheet of the necessary decisions. 7. Paving: $9,451 allowance (includes bit. cone. & tree removal). Susan requested that Wright Builders revise quote for new plan and with bituminous paving. The will ask Conservation Commission to permit the parking paved and unpaved. 8. Change Orders: a. Star Burst at East: no, they do not want this one. 9. Paddle fans: Wright Builders should clarify how many fans they are currently carrying. Later Note: They have deleted a total of four fans, leaving a total of four (two per classroom). 10. Ordering of Materials: Jonathan wanted to know at what point he is authorized to order materials. It was generally agreed that a decision would be made on Monday, and that signing of the Contract on this day, would trigger this authorization. 11. Who does what?: Laura would like to clarify the roles (particularly between herself and Roger) during the construction period. She suggested that she should handle shop drawings, attend job meeting (and provide minutes), and process any Change Orders. Jonathan expressed concern about the lack of continuity, as he has been working with Roger up until this point. He also said he will need very quick turn around on all submittals because of the tight time frame. This will be worked out between Owner, MJArchs, and Full Circle Design ASAP. 308 MAID' STREET, 3RD FLOOR GREENFIELD, MA 01301 413-773-5551 fax: 413-773-5552 The ,Children's House, Minutes May 17, 1991, page 2 9. Trusses: Roger thought Rugg Lumber's price was high and had requested that WB work directly with his manufacturer, but they have not returned calls. Roger will try to get them to respond. 10. Lighting: a. Roger revised the lighting count (with original fixture types) . WB to price. b. They are carrying $7, 474 allowance, but have a credit proposal for approx. $2,000 for increased lighting with cheaper fixtures. Laura requested cuts of these fixtures. - 11. Classroom Ceilings: a. Laura clarified that the "Nubby" acoustic treatment (alternate) was supposed to be 4' x 8' sheets (not 12"x12" as priced) . She will send information and WB will look at price again. b. Laura would also like to get price for glued on acoustic tile; she will forward information. 12. Paving: Correction: the $9,451 allowance included traprock, not bituminous. WB will re-price per new plan, paved, and unpaved. 13 . Change Orders: Star Burst: pending. . . NEW BUSINESS: 1. Prints: Jonathan would like a set of originals. Roger gave him some. 2 . Trees: Root & Crown pruning should be done right away. Jonathan said they are scheduled to drop trees on Monday, so this could be done at same time. Roger said that for every i" dia. trunk, construction should be held back 12" from trunk. Anything within this limit would required pruning prior to disturbing. 3 . Foundation Detail: 4" shelf for slab. This would leave 4 inches for 2x6 sole plate, allowing it to overhang the 1" Thermal Break. 4 . Computer Wiring: Bob reported that there is a parent who has volunteered to run phone, cable, & fiber optics for materials cost only. Jonathan agreed to try to help make this work. 5. Plantings at North side of existing building: WB will dig up and place against North wall of other classroom. School will be responsible for mulching and watering until they can be replanted. The next meeting was scheduled for Thursday 22 May 1997 @ 8:00 am. Respectfully Submitted, 2%lit� Laura Fitch, AIA Margo Jones Architects cc: Susan Swift; Bob Raymond; Roger Cooney; Wright Builders; Tony Patillo, Northampton Building Inspector MARGO JONES Architects 2 11997 May 17, 1997 �j THE CHILDREN'S HOUSE a Montessori School Pre-Construction Conference II: 15 May 1997 Present: Herb Mayer, Treasurer & BC; Bob Raymond, chair BC; Jonathan Wright, Skip Valencik (site foreman) , Bruce Cleare ( job manager) , Wright Builders, Inc. ; Roger Cooney, Full Circle Design; Laura Fitch, MJArchs. OLD BUSINESS: 1 . Permit: Foundation only permit received, allowing GC to do anything up to and including the slab. Waiting period for Planning Bd. is over on June 2nd when full permit can be applied for. Wright Builders [WB] needs a copy of recording sheet from the registry. Jonathan said they intend to dig on Tuesday. 2 . Utilities: Dig safe has been called; and they will be cleared to dig anytime after 4 pm Friday. 3 . Site Protection: a location for the site fence was agreed upon by all parties. Jonathan said they will keep all construction within fence, and fence intact, but that the school is responsible to keep children from hanging on fence. School is over on June 13th with Summer Program ( just one classroom) starting a few weeks later. 4 . Who does what? Roger & Laura to attend weekly meetings (for the start at least) ; Laura to keep minutes and handle most business. Jonathan requested that minutes be done ASAP after meeting and faxed to him. 5. Submittals: a. Laura submitted a list of required submittals. She will need 5 copies (LF, RC, Owner, Wright-2) . They should be sent through MJArchs unless there is a pressing need to have them faxed directly to Roger. One set of color samples adequate. b. Cubby shop drawings only required if they detail differently; Library shelving needs detailing. C. Heating/Ventilating: Ray Bennet to provide line drawing as well as equipment cuts. 6. Phone List, Schedule of Values, & List of Subs to be supplied by WB. 7. Concrete & Soil testing: As it would add two days to the schedule (for lab results) , and the job is residential in scale, it was decided not to require this. If the subsoils under footings do not look good, Laura might like Ryan Hellwig to take a look. WB will provide concrete mix data. S. 8" stone to be deleted: This was required only for possible radon mitigation (Energy Crafted Home) but is in conflict with subslab ' 'pes (sanitary code) . Gravel backfill (in 10" lifts) Will stAi be included. 308 MAIN STREET, 3RD FLOOR GREENFIELD, MA 01301 413-773-5551 fax: 413-773-5552