25A-046 (29) THE MONTESSORI SCHOOL OF NCRTHAMPTON:
Outline Material Specifications, page 12
Lighting con' t : EXIT SIG NS : Install exit signs using LED (light-emitting-
diode) technology. Retro fit existing signs with same .
Ceiling fans ,(multi-speed) .
16720 Fire Alarm: G.C. will meet all relevant Codes requirements . G. C. will
tie-in new system with existing system.
Fire extinguisher and cases and pull stations as required by
fire chief.
END OF SPECIFICATIONS -
THE MONTESSORI SCHOOL OF NORTHAMPTON:
Outline Material Specifications , page 1_
16000 Lighting: Fixture quantity and lccaticn will be based on manufactures
specifications . Foot Candles (FC) levels listed are
minimums . GC will ver_fy design and present to Owner for
approval .
CLASSROOMS 101 & 102 : Suspended fixtures equal to Litecontrol
P-1D-9068T8-PARSS-CWM-TW-120E03-AC with 6 FO32/35k lamps .
(Desired FC Level Rance 30 40) .
LIBRARY 103 : Suspended fixtures equal to Litecontrol P-1D-
9068T8-PARSS-CWM-TW-120E03-AC with 4 FO32/35k lamps . Dimmable
Track Lighting. (FC Level Range 30 40)
HALLWAY 100 : Recessed fixtures in suspended ceiling grid
equal to Columbia J22-232UGG-FSAI2-E38120 with two 32-Watt U-
lamps, 35K lamps . (Desired FC Level Rance 20 30) .
LAVS 106 & 107 : Two can fixtures with 1 or 2 - 28 Watt
compact horizontal la<<:z over w. c . , Wall mounted 1 or 2 lamp
wrap-around above mirror. (Desired FC Level Ranae 20 30)
Install Watt stopper WS-1200/277 switchplate occupancy sensor.
LAV EX-106 : One can fixture with 1 or 2 - 28 Watt compact
horizontal lamp over w.c . , Wall mounted 1 or 2 lamp wrap-
around above mirror. (Desired FC Level Range 20 30) . Install
Wattstopper WS-1200/277 switchplate occupancy sensor.
JANITORIAL CLOSET: One can fixture with 1 or 2 28-Watt
compact horizontal lamps . (Desired FC Level Range 20 30)
STOREROOM 105 : Two can fixture with 1 or 2 28-Watt compact
horizontal lamps . (Desired FC Level Range 20 30)
OFFICE 104 : Recessed fixture in suspended ceiling grid equal
to Columbia J24-232G-FSAI2-EB8-120-120 with two FO32 . 35K
lamps . (Desired FC Level Range 30 40) .
OFFICE EX-105 : Surface mounted fixture equal to Columbia with
two FO32 . 35K lamps . (Desired FC Level Range 30 40) .
OFFICE EX-105 CLOSET: One can fixture with 1 or 2 28-Watt
compact horizontal lamps . (Desired FC Level Range 20 30)
PORCH EGRESS : Equal tc Columbia CFR626EB-132-120-RAL6 .
(Desired FC Level Range 20 30) . Install damp-rated & cold-
rated compact fluorescent lamps (rated to 20 below zero F)
PARKING LOT: Install on building damp-rated & cold-rated
flood lamp (rated to 20 below zero F)
THE MONTESSORI SCHOOL OF NO=,THAMPTON:
Outline Material Spec ifications , pane 10
Vent . con' t : Note : GC/=iAC contractor shall submit an air balance report .
Hydronic contractor shall provide motorized combustion air
intake damcers and ductwork to outside . Motors to have safety
interlocks tied to boilers .
15600 A. C. CLASSROOMS 101, 102, EX-100 , and LIBRARY:
Furnish and install 10 SEER condensing units, one piece
blower/coil units, and related components to include dual
condensate line to exterior, freon lines, and interconnection
to space thermostats . The condensing units shall be installed
on poured concrete mounting base outside (see plan) , provided
by GC and the blower/coil units shall be installed in the
attic on plywood platforms with fiberglass padding, provided
by GC. Provide all ductwork, registers, and grilles to
provide the following;
4 Ceiling supplies, 2 Ceiling filter return grilles
All ductwcrk to be a combination of insulated sheet metal and
flexible insulated spiral flex duct . The entire job is to be
covered by one year parts and one year labor warranty, while
the compressors shall have a five year limited warranty.
System to be sized as follows ; Classrooms 4 ton, Library 2 . 5 .
CLASSROOMS A,B, and EX-107:
Furnish and install 10 SEER condensing units, one piece
blower/coil units, and related .components to include dual
condensate line to exterior, freon lines, and interconnection
to space thermostats . The condensing units shall be installed
on poured concrete mounting base outside, provided by GC and
the blower/coil units shall be installed in the attic on
plywood platforms with fiberglass padding, provided by GC.
Provide all ductwork, registers, and grilles to provide the
following;
Classrooms; 3 high sidewall supplies, 2 high sidewall filter
return grilles .
Office; 1 high sidewall return, 5 floor supplies .
System to be sized as follows; Classrooms 4 ton, Library 2 . 5 .
OFFICE 104 :
Install 9, 000 BTU wall unit (see elevation) .
16000 Electrical : G. 0 will meet all relevant Codes . Verify that existing
service is adequate to carry new loads .
THE MONTESSORI SCHOOL OF NC THAIMPTON:
Outline Material Specifications, page c
15800 Ventilation:NEW WING a--.d CLASSROOM EX-100 SYSTEM.
Ventilation system shall consist f One Lifebreath model 1200
DD- POOL, cplet�-w-it h-hydr.�n. e- co:r�:r - - s
--EU� ,ed-contr-aL�--
be ma-r-nrng
-up-eon�rol-ta-be-e�ectri y-pass -val-ve--t ern maT ti7
Supply duczwork in new addition will be under slab, and
insulated duct in crawlspace (EX-100) . Insulated fresh air
and exhaust duct to exterior.
Ductwork s'--.all be installed and balanced to provide the
following air quantities :
Classroom #101 300 CFM
Classroom #102 300 CFM
Library #103 120 CFM
Office #104 30 CFM
Classroom #EX-100 330 CFM
This system shall be designed to provide tempered fresh air
during occupied hours only.
LLYYT.^ jja �Z a 4 4a� C' TTT- L'IICiJ L CT'!!i'Le C Y 1 YQ��O
HRV unit is to be cycled off during non-occupied
hours .
EXISTING CLASSROOM A & B and OFFICE AREA SYSTEM.
Ventilation system shall consist of One Lifebreath model
850DCS/FD, c�etphte�7z k� r -- °`gin -rrn-=n.
--��i"�TT"��'�-hV����A �--_�-�-'����'-fa}�r'-r�nrt F?�}-�i i r•7 nnn�-vnl -es.�
Insulated duct in crawlspace. Insulated fresh air and exhaust
duct to exterior.
Ductwork shall be installed and balanced to provide the
following air quantities :
Classroom A 330 CFM
Classroom B 330 CFM
Lounge area 90 CFM
Office areas 90 CFM
This system shall be designed to provide tempered fresh air
during occupied hours only. HRV unit is to be cycled off
during non-occupied hours .
THE MONTESSORI SCHOOL OF NORTHAMPTON:
Outline Material Specifications, page 8
Heating con' t : Radiant manifold to be located in the custod_al room. Support
manifold during concrete pour on reinforced rcd. Location to
be coordinated with GC. Approval required by owner.
System will have two zones : Zone 1 Classrooms & Library; Zone
2 Office, Hallway, and Restrooms .
Radiant tubing to have integral oxygen barrier and minimum 20
year warranty. Cross linked poiyet'_ylene tubing is preferred.
HEATING PLL�kNT:
General Contractor to evaluate the capacity c= existing-
boilers . G` will provide to owner heat loss calculations for
existing building and new addition to support evaluation
conclusions t--'
i
ing e ccmbustio =G�1 di� vent_ _ _
sealed r., rect , natural cas boiler is to
ew
be installed in existing crawl space near new additiont°r:i� ?
Boiler to be protected from low return water temperature .
Boiler to be vented through sidewall . Combustible clearances
must be observed with venting at all times .
If existing heatin !ant does hav nough capacity, then a
tempering tank is to insta a (SuperStor, BoilerMate,
Phase II , or equal) hea y the existing boilers as a
separate zone. Water f m e tank is then piped to radiant
manifold. Piping m either Lion to radiant manifolds are
the same.
Boiler and/or tempering tank to have minimum 20 year warranty
in commercial use .1-4"- {, i(,bj<-
Radiant system to be controlled by temperature limiting
device (mixing valve, injection pump, 4 way valve, etc . ) to
assure surface temperature of floor does not exceed 85
degrees F. Water temperature requirements of the system, as
determined by tubing layout, to be included with proposal .
Re-connect baseboard heating units in any area accessible
from crawl space .
15400 Plumbing: G. C. will meet all relevant Codes . Re-use existing fixtures
as indicated on design drawings . c-�,.,c( h)e-
THE MONTESSORI SCHOOL OF NG-�ITHAMPTON:
Outline Material Specifications, page 7
10800 Toilet
Accessories : Equal to 2obrick.
Grab bars : B550 series, 1 1/4" peened
finish, 42" L. , mount on solid blocking.
Mirrors : 1/4" tempered glass, 24" x 36" .
TP dispenser: 2-2730 surface mounted; single roll .
P. Towel dispenser: B-2621, surface mounted, stainless steel .
Toilet Partitions and Urinal Screen: baked enamel, heavy
duty.
Terrazzo service basin with 6" drop front . Model TES-3013
(Cust . 108) .
12500 Furnishings :Venetian blinds; i" alum mini blinds (including mounting
brackets) at all windows except toilet rooms and hallway.
15000 Heating
System: Basement mechanical room must be enlarged to meet code .
f}-55v✓�a.�:_ /11 /V trv�•_.ti� C'ic�'-�.�.ir C:.v (i1.J:Q"� �,C e_ T�.�-r«-( .t,�� -:1.�./S.J•�((
Available combustion air does not meet code . GC will install
appropriate measures to rectify.
RADIANT SLAB (See Alternatives) :
Tubing design layout drawing (s) and specification to be
provided by tubing supplier/or qualified agent . To be
reviewed by owner.
Minimum requirement is 12 inch on center (O/C) spacing
throughout slab except 6 inch O/C for the first 2 feet of
exterior perimeter of slab.
Tubing to be fastened at least every 3 feet to wire mesh.
Wire mesh/grid to be raised prior to concrete pour, to place
tubing in middle of slab upon completion of pour.
Tubing to be protected at expansion joints with one foot
sleeves of pipe insulation. Coordinate locations with General
Contractor (GC) .
Tubing attached to radiant manifold and pressurized with air
to 50 PSI during concrete pour. Heating contractor to be
present during pour, with repair fittings, in case of need
for emergency repair.
THE MONTESSORI SCHOOL OF NCRTHAMPTON:
Outline Material Specifications, page 6
09500 Suspended
Ceiling: 2 ' x 2' panels, slotted spline grid:
A. Suspension system equal to Dunn brand U.S .G. "fineline" ,
color to be white .
B . Tiles : Ll��
1) U.S .G. "Acoustone, Frost" , 2 ' x 2 ' x 3/4" , No. l �
"Shadowline" edge, 70-80 NRC, 40-44 STC, foil backed.
a*) -
cl� ,
09680 Carpet : Nylon, cz . , equal to "Academy" by Patcraft, glued down.
Glue must be rated for high temperature if used with radiant
floor system. All Carpet to be selected by Owner through
samples by Builder.
09650 Resilient
Tile : Vinyl Composite Tile, 12 x 12 inch size, 1/8 inch thick, ASTM
E84 Flame Spread 75 or less, equal to Mannignton
"Inspirations" . Match existing tile for color, to be approved
by Owner.
Sheet Vinyl : Equal to Corgoleum "Flor-Ever" , 25 mil, no-wax wearlayer.
Style and color to be selected.
OR
Armstrong "Classic Corlon" , 50 mil vinyl, wearlayer. Style
and color to be selected.
Cork: Equal to Ipocork Inc . , 12" x 12" 1/8" thick, color natural .
09900 Painting: General : Colors to be selected by Owner. Painter to provide
41x 4 ' samples .
EXTERIOR: Backprime all wood with primer/sealer, stain kill
all knots where painted. t Cj,.f P, ; SsP,ikce1:4
' C, L eez F_,,51, ;,114 ,2;i s,
Exterior trim: 2 coats Moorwood vinyl acrylic semi-solid
latex stain, #809 to match existing. C'v/y
Cedar Siding: Match existing (2 coats clear finish) .
Metal doors : 2 coats alkyd semi gloss over factory prime
coat .
INTERIOR: Plaster/gyp'bd. : 1 coat Kurfees Primer 225 , 2 coats
Kurfees Acrylic Enamel Eggsshell, by Environmental
Construction Outfitters (800) 238-5008 . a j
New wood (doors, trim, and beams) : 2 coats watco
penetrating oil .
Cubbies : stain to match existing in color.
THE MONTESSORI SCHOOL OF =C THAMPTON:
Outline Material Specifications, page 5
07900 Sealants : Exterior: silicone modified acrylic; interior: latex.
Assure prcper sealing of all wiring, piping, -window and door
framing, and other penetrations which might serve as
infiltration pathways .
Use non-expanding foam at all exterior door and window rough
openings .
08200 Doors : Exterior doors :
Type 'A' : Brosco Steel Door, B-1058G with 3S-38 sidelite .
Wood frames, adjustable aluminum thresholds . Window
configuration as shown on exterior elevations .
Type ' B' : Brosco Steel Door with half lite, 2-1058 .
Type ' C' : 1 3/4 " thick birch veneer, flush. Solid core doors
in wood frames . Custom wood frames at doors with sidelites
(Classrooms 101 and 102) . Sidelites to be tempered glass .
1 Type ' D' : Moveable wall partition (Type ' C' ) equal to Holcomb
& Hoke FolDoor Model 5500, hinged pairs, manually operated,
top supported, 3 " panel thickness, STC 42-47; with pressure
activated bottom seal activated bottom seal, lever operated,
8 ' -0" x 24' at classrooms and 8' -0" x 20' at library (See
Alternates) . Provide shop drawings . t /
/ r. cn ha4l 1 ?
�L`'r2 li^.�-�- Cnf,ZI000 q �'-jC���$i(,S�c, l v�. �.✓��r� SL[!N cull.: �/t�e''y�
08600 Windows : 616 removable, interior mullions; "Low E" glazing, full
exterior screen, match existing window manufacturer.
08700 Hardware : Brass, lever handle hardware, mortised at exterior doors,
match existing Schlage.
Panic hardware : Russwin Exiter II Series at all exterior
doors .
Key all doors as per owner' s /directions .
Ei� /c
09250 Gyp . Bd. : Walls & ceilings : Toilet room walls to have 1/4" plywood
layer under gypsum. All ceilings and corridor walls : 1 hr.
fire-rated. Spray finish at classroom ceilings (See
Alternates) .
THE MONTESSORI SCHOOL OF NORTHAMPTON:
Outline Material Specifications, page 4
Finish Carpentry:
con' t Vinyl base, 4" coved.
Bathroom wainscot : plastic laminate
06400 Arch.
Woodwork: Provide shop drawings for approval by owner.
Cubbies : 3/4" pine to match existing.
Built in casework: e-mial to "Young" solid pine and/or custom
built . Porcelain pulls .
Library Shelving: Custom built wood shelving, birch veneer i'
plywood, edgebanding, plastic laminate tops, sizes as
indicated on design drawings .
Plastic laminate counters, square edged.
Resinous counter top (Classroom 101) equal to Campbell Rhea
"Rheafex" .
Storage shelving, birch veneer plywood, edge banded. Heavy
duty standards and brackets .
07200 Insulation: Frost walls and slab: 2" rigid polystyrene
Vapor barriers : on warm side of all insulated walls, ceiling;
full taped at all seams and penetrations, 6 mil .
Walls : R-19, blown-in cellulose .
Ceiling: R-30, blown-in cellulose; provide Prop-R vents each
bay. Insulation on slope ceiling to be stabilized w/mesh.
Acoustic Insulation between rooms : blown-in cellulose
07300 Roofing: New pitched roofing: 30 year asphalt shingles, Class A, equal
to Bird Architectural 90s, color to be selected. -&Rtz_ �
15# felt . Continuous ridge vent .
Ice & Water Shield: three layers (9' wide) of Grace
"Bituthene" membrane ice and water shield at eaves and
valleys
Copper flashing.
Gutter and downspout : white� ` ;� d
y
THE MONTESSORI SCHOOL OF NORTHAMPTON:
Outline Material Specifications, page 3
06100 Rough Framina: Pressure treated where exposed to weather or
Carpentry: concrete .
Roof Trusses : Should be designed and fabricated according to
the American Forest and Paper Association' s "National Design
Specification" and the NDS "Supplement" and all relevant
specifications of the Truss Plate Institute . Design and
fabrication should be done by competent and experience
personnel under the su:,ervision of a professional engineer.
Detailed shop drawings, including a layout plan_, showing all
design loads, stress levels, material specifications, plate
sizes, splice locations, dimensions, deflections, and bracing
requirements, should be provided, bearing the stamp of an
engineer licensed in Massachusetts . Minimum design loads
should be 35 pounds per square foot (psf) snow load with
allowance for additional load at valleys; dead loads as
indicated by finish schedules in the design drawings;
partition loads at the locations shown on the design
drawings . Trusses should be cambered for dead load.
Transport, storage, handling and temporary bracing of trusses
shall follow TPI recommendations .
Truss bearing points should have hurricane anchors to
exterior walls (Simpson_ Strong-Tie 111-112 " or better)
Wall stud with trusses above.
Roof Sheathing: 5/8" CDX with plywood clips .
Exterior siding: 1/2" CDX plywood sheathing with Tyve
cedar clapboards to match existing.
Soffit Q eves : Equal to Wolverine Techs . (fully vented
vinyl) . Color by Owner
Exterior porch framing: Pressure-treated Southern pine, boxed
with cedar where visible .
Porch ceiling (match existing material and finish)
06200 Finish Install new windows and doors, trim, and base .
Carpentry:
Exterior trim: primed finger jointed clear pine at window and
doors, painted (match existing color) . Cedar corner boards,
fascia, etc . to match existing, natural finish.
Interior trim: clear pine, square edged; match existing
window sills, window & door jamb & head casing, with head
casing wider and thicker than jambs . Match existing wood
base profile.
THE MONTESSORI SCHOOL OF NCR7 AMPTON:
Outline Material Specificat_ons, page 2
02300 utilities : Site Drainage: Provide positive drainage away from
foundations .
Connect to sewer system on site G.r--�� n�_Gt-.ion
ea���rrc_Y�e*�=t=�s-tom-ems=.
Water Service: Connect to existing line on Site .
Cable, Telephone and Electric Service : Connect to existing
services .
Natural Gas Service : Existing gas line must be upgraded.
Present line is undersized for present load. Connect upgraded
line in se;arate trench from Bates St .
02400 Landscape : Finish raking and seed-ing 6f disturbed areas . Protect
designated existing trees to remain. Trim crown and root
prune existing trees to the North of addition, feed with
arborist recommended fertilizer.
03000 Concrete : Subgrade should be verified for bearing capacity to support
roof/wall loads . Dig test pit with backhoe within proposed
footprint before start of construction. There should be no
organics, fills, of soft clays present in the existing soil .
Frost walls, footings & slabs : 3000# psi min. reinforced
concrete . Foundation walls 8" wide . Continuous reinforcing
steel bar should be placed at the top and bottom of wall
(minimum) .
Exterior concrete : Should be air-entrained (60) ; 4000# psi
min. Provide batching slips. Slump tests to be taken at
random if Owner deems necessary.
Compacted fill should be well-graded granular material,
placed in 10" maximum lifts .
Coordinate work with installation of all under slab utilities
and radiant floor heating (should such a heating system be
chosen by Owner. )
If radiant floor system is used, slab is to be reinforced
with wire mesh and shall have contraction control joints
x��rzy O If radiant system is not used, slab is to
be reinforced with a grid of #3 rebar Q 16 " spacing both
ways .
05000 Metals : Miscellaneous metals for framing, galvanized at exterior
locations .
THE MONTESSORI SCHOOL OF NC=-_'HAMPTON: Margo Jones, Architects
Outline Material Specificat_ons with Full Circle Design
Date : May 16, 1996
Revision: March 13 , 1997
General :
1 . General Bids are due to Susan Swift at The Montessori School of Northampton
byc'rt��' 7, ri/ at 2 : 00 p.m.
2 . General Contractor shall be certified by the "Energy Crafted Home" program,
and all framing, insulation, air exchange, etc . shall meet requirements for
such Program. The building shell shall pass a "blower door test" prior to
installation of interior f_4 -_fishes . CFM shall meet "ECH" standards .
3 . General Contractor shall provide shop drawings and samples of all finish
materials as requested to Cwner for approval .
Div. Section Description
01030 Alternates : Provide separate pricing for the following:
A. Star burst cedar siding at gable end of East Porch off
classrooms .
B . Moveable wall partition between Library and Classroom 101 .
Rough framing of opening and "break-down" wood stud and
gypsum board temporary partition to be part of Base Bid.
C. Glued on acoustical ceiling treatment in two classrooms in
place of sprayed finish; equal to Armstrong, "Nubby" , with 1
inch wood battens at all seams . �
D. Forced Hot Water Baseboard heating system vs . Radiant Slab
(See concrete section for change in slab reinforcement) .
E. Repair/complete existing foundation, complete vapor
barrier, and remove dirt/debris (basement of EX-100) .
02100 Clearing: Remove de S4 trees .
02072 Demolition: Misc . wood framed walls; removal of pre-cast steps for re-
use; careful removal of existing doors for re-use . Careful
removal of existing plumbing fixtures for re-use . Capping of
removed plumbing and electrical fixtures . Remove vinyl
siding. Remove existing heating units in renovation area,
prior to demolition of walls and bathrooms . Cap all piping in
crawl space-basement.
02200 Earthwork: General excavation, back filling for foundation as indicated,
and for site utility connections . Rough grading. (See
Concrete Section) .
BIDS DUE 4 � � �_ 19"L..
NORTHAMPTON MONTESSORI SCHOOL ADDITION
Montessori School of Northampton
51 Bates Street
Northampton, MA 01060
RE: GENERAL BID FOR CONSTRUCTION
To whom it may concern:
The Montessori School of Northampton is seeking a General Bid for
construction of a 3000 square foot addition. This addition is to
include two new classrooms, library, office, restrooms, and
janitorial closet. The project will include the renovation of an
existing office along with the removal of an existing restroom and
relocation of another.
It is expected that the contractor and/or the sub-contractor have
experience in the following areas :
Permitting
Landscaping
Concrete Monolithic Slab Construction
Manufactured Truss Systems Design and Installation
Stick Built Construction
Energy Crafted Home Program Certification
HVAC including HRV Systems Design and Installation
Radiant Flooring Heating Systems Design and Installation
Plumbing Design and Installation
Electrical/Lighting/Fire Safety Systems Design and Installation
Please find enclosed a Plan Set, Outline Material Specification,
and a Form for General Bid for your use. There will be a pre bid
meeting at the school on io& e- % at o'clock at which time
questions will be answered.
The owner will use AIA Documents A101, STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR where the basis of Payment is a
STIPULATED SUM - 1987 Edition and A201, GENERAL CONDITIONS OF THE
CONTRACT FOR CONSTRUCTION - 1987 Edition, Contract forms .
The school is prepared to undertake this building project this
spring with completion by August 15, 1997 . This addition is to be
occupied this fall session, September 1997 . The expansion committee
target dollar amount for this project is $240, 000 .
Questions are to be directed to Roger Cooney of Full Circle Design
at (413) 624-3360 . Thank you.
Susan Swift
Director
encl:
Plan Set, Outline Material Spec. & Form for General Bid.
THE MONTESSORI SCHOOL OF NORTHAMPTON:
Outline Material Specifications, page 2
AD2-8 SECTION 15300 : VENTILATION
Lifebreath model 1200 substitute
AD2-9 SECTION 15600 : A.C.
Substitute
AD2-10 SECTION 16000 : LIGHTING
Revise specification per Don Armour of Lighting Systems, West
Hartford, CT 06107 . (860) 233-8277 .
Other misc . notes :
Woven valley may be better than open because of acid -rain effecting metal .
Side walls 16" oc .
8 " stone under slab vs . 611 .
Only need one smoke detector per room.
95% compaction for interior footing.
Air tank is bad on old boiler, needs to be replaced.
Why non-elec . switch on vent--
Science counter top conflict in #' s .
Revise parking lot for 17 more spaces .
- END OF SPECIFICATIONS -
THE MONTESSORI SCHOOL OF NOF'?'??._R.MPTON: Margo Jcnes, Architects
ADDENDUM NUMBER TWO with Full Circle Design
Chanaes to Specifications :
AD2-1 ALTERNATES : C
Acoustical ceiling should be Amstrong Nubby Regular item
#3200 24"x 24" x 1" .
AD2-2 SECTION 03000 : CONCRETE
Do not Saw-cut slab.
AD2-3 SECTION 07200 : INSULATION
Ceiling insulation should be R-45 .
AD2-4 SECTION 08200 : DOORS
Type 'D' : Moveable wall partition (Type ' C' ) should be equal
to Holcomb & Hoke Foldoor Model 400 Paired Panel . Sizes
should be cne 8 ' -0" x 24' -0" and one 8 ' -0" x 16 ' -011 .
(317) 784-2448 .
AD2-5 SECTION 09680 : CARPET
Should be Nylon, 28 oz . , equal to "Academy" by Patcraft #232-
098 .
AD2-6 SECTION 09650 : RESILIENT TILE
Do not use Congoleum "Folor-Ever" because it is only
available in 6' -0" a width.
Do not use Cork because it de-laminates substitute
AD2-7 SECTION 15 400 : PLUMBING
Existing sink with gooseneck is Elegate 22"x24 1'x 5 1/2" by
Moen.
Existing toilet is 17" high Gerber EB 1 . 6 .
Existing sink is Gerber K24 .
Janitorial closet has 12" terrazzo Service Basin with 6" drop
front model #TSB-3013 .
co
ro
Old rim � Jiii�o lg
'1 1 I
,
------------------
' '
o
a
i 2 ,
b � ,
oor7C� � 2 >�
air ti N
c /
tom_-,
Do
n- /10 .. ^ w L-.1
I>00 x
HIM
pa v
,, C
O
to y
• g n a �--1 �, z
� v
s Ej
c
19 4
THE MONTESSORI SCHOOL OF NCRT_H.AIPTON: Margo Jones, Architects
ADDENDUM NUMBER ONE with Full Circle Des i an
Chances to S-cecificaticns :
AD1-1 SECTION 02221 '& 02510 : ASPHALT CONCRETE PAVING
A. The work of this sections consists of excavating for
construction of and furnishing all labor, materials, service
and incidentals necessary to install pavement work indicated
in the drawing or described in the specifications .
B. The contractor will excavate and compact subgrade to
accommodate gravel and new bituminous pavement . Compacted
gravel to :,e minimum cf G" covered by MIN. 1 1/2 " binder
course . Tcp wearing course is to be MIN. of 1 1/211 . New
pavement is to match grade of existing parking lot .
Chancres to the Drawings :
AD1-2 DRAWING L. 1, SITE PLAN
A. Add parking lot .
-END OF ADDENDUM ONE -
AFTER ONE (1) ATTACHED DRAWING