25A-046 (24) THE MONTESSORI SCHOOL OF NORTHAMPTON: Outline Material Specifications, page 2 02300 Utilities : Site Drainage : Provide positive drainage away from foundations . Connect to sewer system on site or separate connection entrenched to street . Water Service: Connect to existing line on Site . Cable, Telephone and Electric Service : Connect to existing services . Natural Gas Service : Existing gas line must be upgraded. Present line is undersized for present load. Connect upgraded line in separate trench from Bates St . 02400 Landscape : Finish raking and seeding of disturbed areas . Protect designated existing trees to remain. Trim crown and -root prune existing trees to the North of addition, feed with arborist recommended fertilizer. 03000 Concrete : Subgrade should be verified for bearing capacity to support roof/wall loads . Dig test pit with backhoe within proposed footprint before start of construction. There should be no organics, fills, of soft clays present in the existing soil . Frost walls, footings & slabs : 3000# psi min. reinforced concrete . Foundation walls 8" wide . Continuous reinforcing steel bar should be placed at the top and bottom of wall (minimum) . Exterior concrete : Should be air-entrained (61) ; 4000# psi min. Provide batching slips . Slump tests to be taken at random if Owner deems necessary. Compacted fill should be well-graded granular material, placed in 10" maximum lifts . Coordinate work with installation of all under slab utilities and radiant floor heating (should such a heating system be chosen by Owner. ) If radiant floor system is used, slab is to be reinforced with wire mesh and shall have contraction control joints (saw-cut is ok) . If radiant system is not used, slab is to be reinforced with a grid of #3 rebar @ 16" spacing both ways . 05000 Metals : Miscellaneous metals for framing, galvanized at exterior locations . THE MONTESSORI SCHOOL OF NORTHAMPTON: Margo Jones, Architects Outline Material Specifications with Full Circle Design Date : May 16 , 1996 Revision: March 13 , 1997 General : 1 . General Bids are due to Susan Swift at The Montessori School of Northampton by at 2 : 0 0 p.m. 2 . General Contractor shall be certified by the "Energy Crafted Home" program, and all framing, insulation, air exchange, etc . shall meet requirements for such Program. The building shell shall pass a "blower door test" prior to installation of interior finishes . CFM shall meet "ECH" standards . 3 . General Contractor shall provide shop drawings and samples of all finish materials as requested to Owner for approval . Div.Section Description 01030 Alternates : Provide separate pricing for the following: A. Star burst cedar siding at gable end of East Porch off classrooms . B . Moveable wall partition between Library and Classroom 101 . Rough framing of opening and "break-down" wood stud and gypsum board temporary partition to be part of Base Bid. C. Glued on acoustical ceiling treatment in two classrooms in place of sprayed finish; equal to Armstrong, "Nubby" , with 1 inch wood battens at all seams . D. Forced Hot Water Baseboard heating system vs . Radiant Slab (See concrete section for change in slab reinforcement) . E. Repair/complete existing foundation, complete vapor barrier, and remove dirt/debris (basement of EX-100) . 02100 Clearing: Remove designated trees . 02072 Demolition: Misc . wood framed walls; removal of pre-cast steps for re- use; careful removal of existing doors for re-use . Careful removal of existing plumbing fixtures for re-use . Capping of removed plumbing and electrical fixtures . Remove vinyl siding. Remove existing heating units in renovation area, prior to demolition of walls and bathrooms . Cap all piping in crawl space-basement . 02200 Earthwork: General excavation, back filling for foundation as indicated, and for site utility connections . Rough grading. (See Concrete Section) . Sub Trade & Name of Sub-Bidder Amount Bond Req'd Y/N? Section 15000 : Heating Sub-Bidder $ Section 15400 : Plumbing Sub-Bidder $ Section 15600 : A.C. Sub-Bidder $ Section 15800 : Ventilation Sub-Bidder $ Section 16000 : Electrical Sub-Bidder $ Section 16000 : Lighting Sub-Bidder $ Name: Title: FORM FOR GENERAL BID Montessori School of Northampton 51 Bates Street Northampton, MA 01060 DATE: FROM: (Contractor Name) A. The undersigned proposes to furnish all labor and materials required, and to perform all work for the completion of the project in accordance with the accompanying plans and specifications prepared by Margo Jones, Architects, Full Circle Design, and the Owner for the contract price noted below, subject to additions and/or deductions according to the terms of the specifications. B. This bid included all of the information from addenda numbered to C. The proposed contact price is dollars ($ ) . D. Alternates: A. Star burst siding Add $ Deduct $ B. Moveable wall partition Add $ Deduct $ C. Acoustical ceiling Add $ Deduct $ D. Forced hot water heat Add $ Deduct $ E. Foundation repair Add $ Deduct $ E. SUB-BID DIVISION OF BID: The sub-division of the proposed Contract Price is as follows: ITEM 1: The work of the General Contractor, being all other than covered by ITEM 2 : dollars ($ ) . ITEM 2 : Sub-Bids as follows: Sub Trade & Name of Sub-Bidder Amount Bond Read Y/N? Section 02400 : Landscape Sub-Bidder $ Section 03000 : Concrete Sub-Bidder $ Section 12500 : Furnishing Sub-Bidder $ l NORTHAMPTON MONTESSORI SCHOOL ADDITION Montessori School of Northampton 51 Bates Street Northampton, MA 01060 RE: GENERAL BID FOR CONSTRUCTION To whom it may concern: The Montessori School of Northampton is seeking a General Bid for construction of a 3000 square foot addition. This addition is to include two new classrooms, library, office, restrooms, and janitorial closet. The project will include the renovation of an existing office along with the removal of an existing restroom and relocation of another. It is expected that the contractor and/or the sub-contractor have experience in the following areas: Permitting Landscaping Concrete Monolithic Slab Construction Manufactured Truss Systems Design and Installation Stick Built Construction Energy Crafted Home Program Certification HVAC including HRV Systems Design and Installation Radiant Flooring Heating Systems Design and Installation Plumbing Design and Installation Electrical/Lighting/Fire Safety Systems Design and Installation Please find enclosed a Plan Set, Outline Material Specification, and a Form for General BiVele,5elwv or your, use. There will be a pre bid meeting at the school on % at nh o'clock at which time questions will be answered. The owner will use AIA Documents A101, STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR where the basis of Payment is a STIPULATED SUM - 1987 Edition and A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION - 1987 Edition, Contract forms. The school is prepared to undertake this building project this spring with completion by August 15, 1997 . This addition is to be occupied this fall session, September 1997 . The expansion committee target dollar amount for this project is $240, 000 . Questions are to be directed to Roger Cooney of Full Circle Design at (413) 624-3360 . Thank you. Susan Swift Director encl: Plan Set, Outline Material Spec. & Form for General Bid.