Loading...
36-294 (5) HVAC EQUIPMENT SIZING: [ ] Rated output capacity of the heating/cooling system is not greater than 125% of the design load as specified in sections 780CMR 1310 and J4.4. MISC REQUIREMENTS: [ ] Refer to 780 CMR, Appendix J for requirements relating to swimming pools, HVAC piping conveying fluids above 120 F or chilled fluids below 55 F, and circulating hot water systems. -- NOTES TO FIELD (Building Department Use Only)------------------------- MAScheck INSPECTION CHECKLIST Massachusetts Energy Code MAScheck Software Version 2.0 DATE: 5-19-1999 Bldg. Dept. Use CEILINGS: [ 7 1. Raised Truss, R-38 Comments/Location Insulation must achieve full height over the exterior wall. WALLS: [ ] 1. Wood Frame, 24" O.C., R-19 Comments/Location WINDOWS AND GLASS DOORS: [ 7 1. U-value: 0.35 For windows without labeled U-values, describe features: # Panes_ Frame Type Thermal Break? [ 7 Yes [ 7 No Comments/Location DOORS: [ ] 1. U-value: 0.08 Comments/Location FLOORS: [ 7 1. Over Unconditioned Space, R-19 Comments/Location AIR LEAKAGE: [ ] Joints, penetrations, and all other such openings in the building envelope that are sources of air leakage must be sealed. Recessed Lights must be type IC rated and installed with no penetrations or installed inside an appropriate air-tight assembly with a 0.5" clearance from combustible materials and 3" clearance from insulation. VAPOR RETARDER: [ ] Required on the warm-in-winter side of all non-vented framed ceilings, walls, and floors. MATERIALS IDENTIFICATION: [ 7 Materials and equipment must be identified so that compliance can be determined. Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment must be provided. Insulation R-values and glazing U-values must be clearly marked on the building plans or specifications. DUCT INSULATION: [ 7 Ducts in unconditioned spaces must be insulated to R-5. Ducts outside the building must be insulated to R-8.0. DUCT CONSTRUCTION: [ ] All ducts must be sealed with mastic and fibrous backing tape. Pressure-sensitive tape may be used for fibrous ducts. The HVAC system must provide a means for balancing air and water systems. TEMPERATURE CONTROLS: [ ] Thermostats are required for each separate HVAC system. A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor shall be provided. MAScheck COMPLIANCE REPORT Massachusetts Energy Code I Permit # MAScheck Software Version 2.0 Checked by/Date CITY: Amherst STATE: Massachusetts HDD: 6614 CONSTRUCTION TYPE: 1 or 2 family, detached HEATING SYSTEM TYPE: Other (Non-Electric Resistance) DATE: 5-19-1999 DATE OF PLANS: TITLE: COMPLIANCE: PASSES Required UA = 446 Your Home = 435 Area or Insul Sheath Glazing/Door Perimeter R-Value R-Value U-Value UA ------------------------------------------------------------------------------- CEILINGS: Raised Truss 1476 38.0 0.0 38 WALLS: Wood Frame, 24" O.C. 2222 19.0 0.0 130 GLAZING: Windows or Doors 525 0.350 184 DOORS 84 0.080 7 FLOORS: Over Unconditioned Space 1592 19.0 76 ------------------------------------------------------------------------------- COMPLIANCE STATEMENT: The proposed building design represented in these documents is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the requirements of the Massachusetts Energy Code. The heating load for this building, and the cooling load if appropriate has been determined using the applicable Standard Design Conditions found in the Code. The HVAC equipment selected to heat or cool the building shall be no greater than 125% of the design load as specified in sections 780CMR 1310 and J4.4. Q Builder/Designer lJti Date l — r