06-039 (11) 3 CONSTRUCTION CONTROL FIELD INSPECTION REPORT Project: Zoe Senior Retirement Community SAGE ENGINEERING&CONTRACTING,INC. Job Location: 345 Haydenville Road 199 SERVISTAR INDUSTRIAL WAY,SUITE''2 Northampton, MA 01060 WESTFIELD, MASSACHUSETTS 01085 Inspection Date: 4-3-2014 (413)562-4884 Time: 9:00 AM to 10:00 AM Sage Job Number: 0482-04-13 Building Permit No: BP-2013.1095 WEATHER: Clear,42 ° EST. %OF COMPLETION: 55% CONSTRUCTION SUPERVISOR: Ed Fortini,Sage Engineering&Contracting, Inc. PRESENT AT SITE -Sage Engineering&Contracting, Inc. —Bryco Drywall Co. -McCain and Sons(Plumbing Sub Contractor) -Fortier Painting -Gustafson Electric(Electrical Sub Contractor) -Salamon Flooring -Warehouse Mechanical(Fire Protection Sub Contractor) Eauiament: -Storage Container -Sage Storage Trailer -Lull 844C -Mobile Office Trailer -(2)Portable Restroom Facilities WORK IN PROGRESS - Painter was priming sheetrock on third floor west of 6.5 - Drywall Contractor was taping and mudding drywall west of 6.5 - Soundboard was being installed on second floor hallway walls west of 6.5 - Drywall was being installed on ceiling on second floor west of 6.5 - Rough electric was being completed on first floor west of 6.5. - Vtac unit cabinets were being framed on third floor west of 6.5.Vtac units staged in rooms ready for install. - Dry fire suppression system being roughed in the carport roof. - Monumental staircase in main lobby is being framed. - Vanity tops in resident unit bathrooms east of 6.5 being installed. - Electricians installing outlets,switches,and covers throughout east of 6.5. WORK COMPLETED SINCE PREVIOUS INSPECTION - All drywall completed on third floor west of 6.5 - Fiberglass bait insulation installed throughout second floor west of 6.5 - Rough electric completed on second and third floors - All rough plumbing completed west of 6.5 - All bathroom exhaust fans and venting installed. - Rough fire protection 95%installed west of 6.5 - All closet doors installed west of 6.5 - All resident unit kitchen cabinets and vanities installed OBSERVATIONS Work in Progress Is In Compliance With Plans&Specifications. INFORMATION OR ACTION REQUIRED COMMENTS r. INSPECTION BY: ; ENGINEER: rya alicki, P.E. Frank DeMarinis, P.E. DATE: 4-3-14 DATE: 4-3-14 SAGE ENGINEERING AND CONTRACTING, INC. DESIGN-BUILD DEVELOPMENT, ARCHITECTURAL ENGINEERING, AND CONSTRUCTION MANAGEMENT April 7, 2014 r 2014 1 lr Louis Hasbrouck, Building Commissioner treat;, -I, �� City of Northampton ` - ';�,o ctlonS 21 2 Main Street Northampton, Ma 01 OGO RE:Zoe Senior Retirement Community, 345 Haydenville Road, Northampton, Ma SAGE Project No. 0482 City of Northampton Building Permit No: BP-2013- 1095 Dear Mr. Hasbrouck: On behalf of Chakalos Investments, Inc., please find the enclosed Construction Control Field Inspection Report dated April 7th, 2014 as required by The 2009 International Building Code and the Massachusetts State Amendment to the 2009 International Building Code for your reference on the existing project in progress named above. We are available at your convenience to review the inspection reports, answer any questions or concerns you may encounter regarding this project. Sincerely, Iry... a kj lP.E. , Project Manager SAGE ENGINEERING CONTRACTING, INC. 199 5ERVI5TAR INDUSTRIAL WAY-SUITE 2 WE5TMELD, MA55ACHU5ETT5 01085 TEL: 413-5G2-4884 - FAX: 413-5G2-4899 PAGE I OF I www.sage-IIc.com