Loading...
36-155 (9) Vill. ZONING PLAN EXAMINERS NOTES DISTRICT FRONT YARD SIDE YARD SIDE YARD REAR YARD IX. SITE OR PLOT PLAN For Applicant Use .nn.omoN;N:N:a NN:a U N No.uu■N■roU.U aUr•.•aoffNr ff■..ffwN frfNN.rNNUaowo.ro.■.NOruf iiiiiN. • ■N: lNrrr . Nii i iii • Ha 1 an iiiiiiii4iaa4:a::saasUH: a ; as l : .USN.•.... 0 N..i was i i.i:..uu..ei:a■:u *Sa•4=■1:s;: NOTES and Data — (For department use) vw er.r ,.'f.�..r � w �- ", �../ �..iw./ r,✓ r:.r vw w w �:/ �;.r .r w w.,✓ w a t I� Jy1lS � I ADVANCED SUN TECHNOLOGIES (AST) < ` [ull (`den 'Pear ParrantV ON THE ADVANCED SUN TECHNOLOGIES, (AST), SOLAR COLLECTOR ' Advanced Sun Technologies (AST) warrants its solar collectors to be free of defects in both material and workmanship. If a failure does occur,AST will provide a new part,or at AST's t� option, provide a complete collector, or also at AST's option,have repaired any part or the complete collector for a period of ten (10) years from the date of initial installation and ser- vice. Any part,provided or repaired,will be covered only for the remainder of the original V ' warrant period. This to collectors installed for use as a heat collector to � �. Y warrant applies P Y PP � 1 -X _ provide energy for use in medium to low temperature ranges. If the heat transfer fluid is other than water, propolyne glycol, silicone oil, synthetic hydrocarbon oil, or an AST ap- proved ethelyne glycol, inquire with AST as to their particular warranty coverage. { 4 SERVICE LABOR RESPONSIBILITY t This warranty covers labor expenses for removal and reinstallation. AST will pay up to fifty dollars ($50.00) for such expenses. SHIPPING COSTS Z AST will pay shipping costs for parts/collectors between the local dealer/distributor and ,, AST. CORROSION WARRANTY AST warrants its collectors against corrosion. Standard warranty provisions apply to any cor- rosion which would damage the structural integrity of the collector. Minor absorber plate A corrosion which does not effect the performance or structural integrity of the collector is acceptable. THIS WARRANTY WILL NOT APPLY A) To defects or malfunctions resulting from failure to properly install,operate or maintain -.r the collector in accordance with the printed instructions provided. B) To damage from abuse, accident, fire, flood, freezing, hail and the like. <; a�a C) To collectors which are not installed in the U.S.territories and in accordance with local codes, ordinances and good trade practices. D) To collector failure which occurs if the collector is used with other than the approved heat transfer fluids. re; E) If the collector is moved from the original installation location. { FILING A CLAIM ' 3. All claims should be filed with the contractor or the dealer from whom the collector was c: ` purchased. If you are unable to do this contact AST directly. g { Advanced Sun Technologies Your Dealer is: P.O. Box 84 Amherst, Mass. 01004 NEW ENGLANDER AST26NE You are assured of an adequate energy supply with Advanced Sun Technologies The Advanced Sun Technologies collectors have a uni- que black chrome over nickel electroplated surface that is far more efficient than the conventional black painted surfaces. The copper absorber plate and low-iron Solar j tempered glass cover also increase the performance of Collector Panel `` 1 Advanced Sun Technologies collectors over other Hot water designs. Storage Tank If the sun does not cooperate, every system includes a t Differential Haack-up heating element that assures you of adequate Controller& hot water. Circulating Pump You get more for your money with Advanced Sun Technologies Advanced Sun Technologies solar collectors offer in- credibly high performance. Laboratory tests have con- firmed that our collectors can generate 917 BTU's of heat , per square foot a day. We are the cost/performance leader in the solar heat industry. The Federal Government and some state governments offer special tax incentives to help you purchase solar systems. Some utility companies offer additional savings. Your Advanced Sun Technologies dealer will help you take advantage of these savings. Advanced Sun Technologies Collectors Are Reliable. ' Advanced Sun Technologies solar collectors are design - ed to last at least 30 years and we expect them to be around a lot longer than that. We don't use strong . � K chemicals or combinations of metals that encourage ,= a� corrosion. Aluminum and stainless steel parts are exten- sively used to assure long life. Our collectors are so strong that they withstood laboratory wind tests in excess of 180 miles per hour. They are built so well that we back them up with a full ten year warranty . . .that's twice the industry standard. r��.�;:vim• � �aC •"�'c#=,. 4, ,�. r i.SJT� of 3h� }r�=T.rv'f ,• "+: `f �"��r � Sf#'y�"'�•: r•fyG„ .a�':`'r� � i:'� i ,�'�fa±���.Lr� r��,_C..J.A..✓qC cif{�';�,. y yam' � �' �r., ter:-'aZ`�,' �.,r '����`4�R.��-r i.i 1�, I .��t�"w�.'�:�/ 1-/i �= ,,:.e. -.ys'S ,'•)' ''L. _-{-: �Y4."�' •k G.I Vii+'. �+ ,,. .s �� •i::si. � � o �ti �-...� yr' .+ �`:J 3N- '�r�)��•-rr .�.?"5 yf` �'. „,v � •�a, s-. r ,.},e-� 7-A.'.'r .n. » s : r.�e.,y '� Ir �'�>F i V•. � ^.r`.:,ex- ti *acs r a JSrL�:` . ` ' sa .+«'tt ..i• �. f+caQ s�.•' ICr.... C _.'y . Xa. , �Y • y ) > .L.r .�e;♦...'r yyl.�''t _ C{�t r sx ` fVwvt,� µs1' r 1 jC•}.�-M° z._ f' �'•,.i, � h ♦ � �! r .std �,j!i �. .s'...,`A%u•t ,', s o: .... :� .a,. "fC. �•,q i:'TC7 ;r i AI's•♦ `y I' ,. .a•"7`:°L�._ s } s r�.i_y�rt _••.'•` .. ^"i s� �+/-w:.i= a� � . .ice �'�_� z rd } '�?`-Y <Ck'` - .f,,f ,' ?Y_ir• ., '. ` �'r} 7-ti ...�..,r,_ _ ...�V� -� . ss yi�.L� t-r �`�, 1,. ' !.2- r •;tvla r °�► ' )may^� .. �yl` •�F,,.: Ir r„� 1• , .w...l..tuo a.a a+M. � y�t��k� .z, a �! �r. \ex �. ,,• , Y� •"� Yom.�f• 0� u.�1�5'.J .f'r )fir :'j •n `5 .3'-v �. r ? l� '.♦ n r�.�� y`'�; le°.r i Pill, •_A� t.i .a_. ' ►(1���r �i �.• .;t'Las .1 .^ 1,1l:lN7'Y.I�Y t �� 1 tj �y'j,��4.i_, �'--•`.5.� :,.'V�.;'�Yt�\`,."^� � x,.. I !All 1 Zoe-1 y X1'1 (�J h: s r .^tie?; w •�+- r? �rii.t: �r��(f���.�-c �-s.KY'.!•�� 4„�.+ /i�,°�W.r�3s•:.5�.,,r��e�� i� �r�.`ff�.iY6J....— ��1\:t .•�`•'C:�'"''s'!'7 s;tC'�:L�.[t+'�h� •P. �,�,�,.��•A.f. "'.:..:�`�'ya;� �....... lJa,a s.\ �� sue— 1111:1�Ils.l 1 a,,1 x:1:11 0 + �1 rU•�.-�'fy"t�r{�., ;��:1 !Z: NTI' rM1:IN1 \ �,y�N>Ysj. ry_►,��`j�. 16 r F , S 0 L A R TAX CREDI "" s In an attempt to help tax credit may be carried over tax exemption is available to Americans reduce they con- until 1987. This increases the some producers. sumption of nonrenewable foil earlier effective 22 percent Tax laws are complicated; to fuels,Congress passed the nonrefundable tax credit learn how they apply specifically Crude Oil Windfall Profit Tax which began on April 20, 19717. to you, please write or call: Act in 1979. Signdd by President Carter in 1980,The Business Energy Investment National Solar Heating and Act includes the following solar Credits: Businesses can receive sling Information Center tax credits. a 10 percent refundable tax P.O. Box 1607 credit for investments in renew- Rockville, MD 20850 Residential: Beginning,lr - able resource property installed (800)523-2929 uary 1, 1980, the Federal between October 1, 1978,and Pennsylvania: (800)462-4983 Government is offering a December 31, 1979. On invest, Alaska& Hawaii: (800) 0 percent nonrefundabletax ments made between January 1, 523-47041 or your local \dit for investments 1980,and December 31, 1985, IRS ,fined to utilize renewable the Federal Government offers >y sources in both new a 15 percent nonrefundable tax Approximately 20 states also cisting residenraes. This credit. Examples of eligible have tax credit programs, ,s technologfes for heed- investments would be solar energy grants, and other solar ,cling homes,supply- equipment to heat or cool energy investment incentives. %ter,producing buildings or to supply hot water. For further information please or harnessing wind or technology utilizing wind call your state representatives ial energy. The energy. In addition,the govern- or your state energy office. i to investments ment offers a 10 percent invest- a year,yield- ment credit for biomass v.s•nepwuirimt of Enwa 1 tax credit of property acquired between Anisttlnt Saretorytor C4nWV4tin mid'ify, October 1, 1978,and Decembers� bay be made by 31, 1985. For certain alcohol for BWWi?W 5,but the fuels„a 44 per gallon excise August 19M DOE/CS-0186 ADVANCED SUN TECHNOLOGIES Glazing: 1 sheet of low iron tempered glass,1/a"thick with 0.01% iron oxide content. Transmittance: 91.0%. AST Glazing Gasket: EPDM Channel with molded corners. NEW ENGLANDER Frame Wall and Batten: 6063 T5 Aluminum extrusion (1/e"wall) Dimensions anodized bronze finish. Anodized bronze integral mounting system. E Insulation: 1-1/4" Foil-faced poly-isocyanurate board insulation with 10 mil binderless glass mat barrier between insulation and absorber plate. (R-10). 3/4" Foil-faced polyisocyanu rate board in side walls and under headers. (R-6). Backsheet: .025 stucco embossed aluminum sheet(bronze)pop- riveted to frame wall. Absorber Plate: Two copper sheets 24" x .010, roll formed to accept 1/z" I.D. type "M" copper riser tubes. Manifolds are 1" type "M" copper with risers silver brazed into preformed tee's on 4.4" centers. Bonding of tubes to plate is continuous solder bond (pure tin) using Advanced Sun Technologies exclusive "Heat Table". Absorber Coating: Black chrome A D Absorptivity: .97 # .01 Emissivity: .10 # .03 Working Pressure: 165 PSI Weight: AST26NE 105 lbs. Fluid Capacity: AST26NE 1.08 gals. Design Life: 30 Years C Flow Rate: .5 to 1.8 GPM Warranty: 10 year Limited F o• I RFD`JJIAR MCOAIMG G 8 CRPCME CERAMIC H Gross Frontal Area s.f. LBU«PAM I Transparent frontal area s.f. Absorber plate area s.f. a R• n a •o �0 4,1" nominal outlets per panel DIMENSIONAL DATA MODEL# A B C D E F G H I J AST26NE 78" 48" 44-7/8" 74-7/8 50" 2-3/8" 3-1/8" 26.0 s.f. 23.3 s.f. 23.2 s.f. THERMAL PERFORMANCE (Ti-Ta)i1 RATING FSEC ?/?/-c The graph shown here depicts 917 BTU/ft an instantaneous efficiency TIPSE* curve for the AST Series collec- 50 tors. This curve is based on BTU/sq. ft./hr. Eff. tests conducted by an indepen- % dent testing laboratory using low Temp. 179 74 standards as described in 20 Med. Temp. 131 54 ASHRAE 93-77 procedures.) *TIPSE Equivalency Ratings were Ti-Ta D calculated using the FSEC Test EEF. _ .757-.79 Results and the conversion for- 1 05 1 15 2 25 3 35 4 45 mula provided by TIPSE. ADVANCED SUN TECHNOLOGIES, NEW ENGLANDER COLLECTOR SPECIFICATION a _ a a Advanced Sun n-Jechnologies Collectors ditioning, and return the highest number incorporate the latest technical advances of BTU's per invested dollar. in both the solar industry and the advances Advanced Sun Technologies has also gone made at Advance Sun Technologies itself. to great lengths to ensure that our Collec- Our constant attention to technical ex- tors be as aesthetically pleasing as they are cellence and economy have made possible efficient and structurally sound. The that elusive blend of "the best for less". anodized bronze extruded aluminum Our Collectors are specifically designed to frame, unique "Quick-Lock" mounts and meet the demands of today's solar energy tempered glass are an asset to any home or systems whether they be hot water, space building. heat, industrial process heat or air con- . ADVANCED SUN TECHNOLOGIES., "END VIEW" SOLAR COLLECTOR AND MOUNTING BRACKETS r Alum.Tilt Brackets ---Collector 0 3-1/2"x 3/8"S.S.Bolt ° 1"x 1"x 1/8" Alum.Square Tube Collector A Alum Bracket �„! 0 1-3/4"x 3/8" S.S.Bolt m Alum.Tilt m v 3-1/2"x 3/8"S.S.Bolt Channel/J f'U C'ficnnel 3/8"x Req'd. Length °° !� S.S.Bolt B 7 uSs o ° X �' La y" DETAIL A DETAIL B Advanced Sun Technologies exclusive "Quick-Lock" Lions in high wind areas are not a problem. The mounting system adds a new dimension to col- framewall will accept the mounts anywhere lector orientation and mounting. The systems around the collector while drilling or tapping can be used to mount collectors to any roof so the integrity of the collector is not violated. and also facilitates mounting to vertical walls, Brackets are waterproofed with silicone or Butyl eave boards, pre-constructed racks or ground rubber for protection against leaks. The rear mounts. The framewall and mounts have been struts can be cut to any length allowing proper certified to 180 MP.H wind speeds so installa- elevation and orientation, DESIGN CRITERIA AS T Solar Collectors have been designed and constructed to meet the following codes: • Solar Rating and Certification Corp.Test Methods • Arizona Solar Energy Commission and Minimum Standards for Certifying Solar . Wisconsin Safety&Building, Collectors,Standard 100-81 Approval No, AE-82-25-S/C • Florida Solar Energy Test Methods and Minimum • Interim Minimum Property Standards Supplement, Standards for Solar Collectors, FSEC, 1977 HUD 4930.2, 1977 • Metropolitan Dade County Dept. of Building and • Interim Performance Criteria for Solar Heating and Zoning Approval for Solar Collectors No, 81-215.1 Cooling System in Commercial Buildings, NBSIR • Miami Test Lab Wind Testing,Approval No. MTL 10331 761187, 1976 • South Florida Building Code Sect. 203 and 204 • Interim Performance Criteria for Solar Heating • CAL SETA; Conforms to 1980 State of CA Tax • Installation Standards...Solar,SMACNA, 1977 Credit Regulations • Uniform Solar Energy Code, IAPMO 1976 • City of Los Angeles Mechanical Testing Lab, • Uniform Plumbing Code, IAPMO, 1981 Approval No. RR-4338 Advanced Sun Technologies Your Dealer is: RNI0IL0G,ICS� ItrC P.O. Box 84 STREET Amherst Mass. 01004 LUN1.0W, M,k Q';SG 4+3-5^ -0573 s3O-342-3792 IV. IDENTIFICATION — To be completed by all applicants Name Mailing address — Number, stmt, city, acid State ZIP code �Tel. No. Owner or Lessee . ' / LQ r S o �.t L� %t ! �IL� Builder's L L Q icense No. Contractor C Dyp0�� 3. Architect or Engineer I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized agent and we agree to conform to all applicable laws of this jurisdiction. $ignat re of applicant Address Appli anon ate 00 NOT WRITE BELOW THIS LINE V. PLAN REVIEW RECORD — For office use Plans Review Re wired Check Plan Review Date Plans B Date Plans B Notes q Fee Started y Approved y BUILDING $ PLUMBING $ MECHANICAL $ ELECTRICAL $ OTHER $ VI. ADDITIONAL PERMITS REQUIRED OR OTHER JURISDICTION APPROVALS Date Date Permit or Approval Check Obtai ed Number By Permit or Approval Check Obtained Number By BOILER PLUMBING CURB OR SIDEWALK CUT ROOFING ELEVATOR SEWER ELECTRICAL SIGN OR BILLBOARD FURNACE STREET GRADES GRADING USE OF PUBLIC AREAS OIL BURNER WRECKING OTHER OTHER VII. VALIDATION Building <3q FOR DEPARTMENT USE ONLY Permit number Building. Use Group Permit issued �� 19 t Fire Grading Building Permit Fee $ Live Loading Certificate of Occupancy $ Occupancy Load Approved by: Drain Tile $ Plan Review Fee $ TITLE +gyp CITY OF NORTHAMPTON MASSACHUSETTS r r OFFICE of the INSPECTOR of BUILDINGS AJT Page Plot (SS- APPLICATION FOR INSPECTOR ZONING PERMIT AND BUILDING PERMIT IMPORTANT — Applicant to complete all items in sections: 1, 11, 111, IV, and IX. O ZONING • AT (LOCATION) r©� �C� 1,46 O/7 /"' DISTRICT) LOCATION (NO.) (STREET) OF BETWEEN AND BUILDING (CROSS STREET) (CROSS STREET) LOT SUBDIVISION LOT BLOCK SIZE II. TYPE AND COST OF BUILDING — All applicants complete Parts A — DN+ A. TYPE OF IMPROVEMENT D. PROPOSED USE — For"Wrecking" most recent use m M 1 New building Residential Nonresidential 2 Addition(If residential, enter number 12 ❑ One family 18 ❑ Amusement, recreational of new bousing units added, if any, in Part D, 13) 13 ❑ Two or more family - Enter 19 �❑ Church, other religious number of units- - - - -� 20 Industrial 3 Alteration (See 2 above) 14 ❑ Transient hotel, motel, ❑ 21 ❑ Parking garage 4 ❑ Repair, replacement or dormitory - Enter number 5 ❑ Wrecking (If multifamily residential, of units ------- - -- 22 ❑ Service station, repair garage enter number of units in building in 15 ❑ Garage 23 ❑ Hospital, institutional Part D, 13) 16 ❑ Carport n 24 ❑ Office, bank, professional 6 ❑ Moving (relocation) �` q 17 Other - Specify Da'YI L�/ /C 25 ❑ Public utility 7 ❑ Foundation only 26 ❑ School, library, other educational B. OWNERSHIP A(TI l/✓4 �/� t� 1( 27 ❑J Stores, mercantile 8 Private (individual, corporation, � 28 ❑ Tanks, towers nonprofit institution, etc.) 29 ❑ Other - Specify 9 ❑ Public (Federal, State, or r�' local government) z/ 7 Z �I/✓��-�7 �� �'J� -G� � C. COST (Omit cents) Nonresidential - Describe in detail proposed use of buildings, e.g., food processing plant, machine shop, laundry building at hospital, elementary 10. Cost of improvement•••••••,•••••••• C school, secondary school, college, parochial school, parking garage for, department store, rental office building, office building at industrial plant. To be installed but not included If use of existing building is being changed, enter proposed use. in the above cost a. Electrical..................... b. Plumbing ..................... c. Heating, air conditioning.......... d. Other (elevator, etc.)............. 11. TOTAL COST OF IMPROVEMENT I$ 9U III. SELECTED CHARACTERISTICS OF BUILDING — For new buildings and additions, complete Parts E — L; for wrecking, complete only Part J, for all others skip to IV. E. PRINCIPAL TYPE OF FRAME G. TYPE OF SEWAGE DISPOSAL J. DIMENSIONS 30❑ Masonry (wall bearing) 40 ❑ Public or private company Number of stories................ 31 ❑ Wood frome 41 ❑ Private (septic tank, etc.) 49• Total square feet of floor area, all floors, based on exterior 32 ❑ Structural steel dimensions ..................... 33 ❑ Reinforced concrete H. TYPE OF WATER SUPPLY 34 ❑ Other - Specify 42 ❑ Public or private company 50. Total land area, sq. ft. ........... 43 ❑ Private (well, cistern) K. NUMBER OF OFF-STREET to PARKING SPACES F. PRINCIPAL TYPE OF HEATING FUEL I. TYPE OF MECHANICAL 51. Enclosed ....................... 35 ❑ Gas Will there be central air 52. Outdoors........................ 36 ❑ Oil conditioning? _ L. RESIDENTIAL BUILDINGS ONLY 37 Electricity 44 F-] Yes 45 No 53. Number of bedrooms.............. 38 ❑ Coal 39 Other - Specify Will there be an elevators Full.......... 54. Number of 46 [-1 Yes 47 ❑ No bathrooms Partial........ Department of Building Inspections 212 Main Street - Northampton, Mass. 01060 BUILDING o° (� fa PERMIT a 36 - 155 VA LIE)ATION DATE July 25, is 8_ PERMIT NO. 329 APPLICANT Advanced Sun Technologies, Inc.ADORESS -220 Lawton St., Ludlow 042096 MOO (STREET) (CONTR'S LICENSE)OF Addition Solar Hot Water System DWELLING UNITS PERMIT TO (_1 STORY _ (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) AT (LOCATION) 305 WEStllam3ml nn Rnarl D STR CT SR (NO.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION LOT BLOCK SIZE Paanee��lrr��s are 1 11BUlL�DIliLJR TO BE 4 FT. WIDE BY 62 FT. LONG BY FT. IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS. permit for the installation of a domestic hot water solar system with 4 4 x 6-1,- jjan ls IT)bs eac . AREA OR VOLUME 242 sq. f t. for each panel ESTIMATED COST $ 5 490.00 PERMIT $ 24.00 (CUBIC/SQUARE FEET) OWNER Pat Mistark ADDRESS 305 Westhampton Road, Nort BUILD ton BY WHITE - FILE COPY . GREEN - FIELD COPY CANARY - APPLICANT COPY PINK - A SESSORS COPY