36-103 (3) c"�,�'j ��� � O�'z:U� - ���t C��7,��'�.�L2 !�. .,!��-C' lz�t"�--� L- ��.:�
eve 2,1e—
all&C/
oe
cl
A
`� `�`��J�- �✓�z.� Cry � � '�'�`� C-c,�c
,cam
4�6
Ye-
e,�i
cz,
3
j i LIt' NOV - 6 2002 2 C,)���
7 M #
DEPT C 81." v
l
-�-
?
GGVS-c-z"
r
J ' c JILe /
�- GIce-t.-..
L�� ✓Z.,�-,.J'I'IC2j°� ��'`t�-� ,���Z..�e'.-�Z:.�aC��. G"--�-L ,'rte �� c�
C .fit LC�c'c 'i: v c
��9 CL1-CJ -J 2.c LG,CCt-C(s� � � LliF Ci 7o
lUa`-�'�G�`,� �, �-f��,��. G{X•�J tlr G�' GC-E%C..•i=� ,7- L-CJ ,(� / �� � --Lt.�?['y�� 'l
3tzL4
46 - 60
&-� 'm�-¢.�
� 4aA-rG-) -1-
1 ✓c�c�!e�e�r� 6 qoo- ��606
C_O1kP
=yam cam/
Cw:^r���„. `."_ `.\: 6�f/����°,�' �.1i1"'��Z� <���•C.L._ ..- l uK. <ril cs/'.2 � b
s G�e�.�-e�./���c.L.• GZ�Zt� Z� ���p
lZovio cl
AL
a T
737- 35B1
ad CL
bctA,
OvN.- fVLr-Il-
aget
oLu�-cQ:-�
pLw4 kv\ -2- J-t,4-0 6 tk; co&"�- -b ktxL 2- 6-0
0. -2- r�; I
�W� 0 gUlAf t t fz�&f
ov
aJ-C��.�. z�3
loll dv fT�- �"`.�`r,(�Z`►�°°',,{�
6 tw
l a 06 0
wo s
CFO
4e-S �
,, ��j/ 6tom, elf
a
Deck
Provide and install 18'X36' two level deck with cut out for hot tub. Decking to be Trex
Decking.
Brick Patio
Provide and install brick patio on remaining cement slab
Brick Wall
Provide and install brick wall from front steps to driveway.
Steps
Pour concrete front steps and Veneer Stucco Stone. Veneer porch foundation with Stucco
Stone.
Existing Porch
Remove roof and reframe to match house and repair as needed.
Cost: One Hundred Fifty Thousand omoo 150,000.00
Payment terms: 1/3 at job commencement
1/3 after electrical and plumbing work
1/3 after completion
f � n
Submitted: August 14, 2002 ---- L
obert P. Boido
We hereby authorize and agree upon a ,ov work d sped ati s
Acceptance
De oley
)Trace'Y-Ake-YO
1
Electrical
Provide and install electrical outlets/sockets/recessed lighting according to Mass Zone
and owners placement upgrade to 200 and smoke detectors. Provide and install hard wire
smoke detectors according to code.
Plumbing
Provide and install plumbing and waste according to Mass Codes (price does not include
fixtures). Provide and install gas piping to furnaces/fireplaces
Insulation
Provide and install wall/ceiling insulation according to plan. Walls R-13 attic R-38.
Provide and install R-13 between bathrooms and bedrooms for sound control. Blow
insulation on first floor.
Sheetrock
Provide and install 1/2 sheet rock to walls and ceilings. Install green board in bathrooms.
Tape and Spray ceilings.
Paint
Primer coat all walls and apply tow coats paint to walls (color choice of owners).
Trim
Provide and install 21/4 Colonial or Ranch casing on all doors. Provide and install
Colonial or Ranch Base around all walls. Paint grade, paint all trim. Construct
entertainment center around bedroom fireplace to house T.V.
Provide mantle for living room fireplace. Provide and install marble surround for
fireplace (color choice of owners).
Flooring
Provide and install Oak or Birch 2 1/2 inch flooring over entire second floor excluding
bathrooms. Floor covering in bathrooms to be determined and not included in price.
Closets
Provide and intsta1112" shelf and rod in all closets. Provide and install largest shelf
allowed for linen closet.
First Floor
Remove walls between living room and front bedroom. Repair oak floors and ceilings.
Reposition closet door from front bed to rear and repair wall. Stairs construct oak
staircase for second floor. Access design to be determined. Remove and replace all doors
on first floor. Replace with six panel Colonial Wood Doors paint grade and paint.
Remove window in dining area and install French Doors with hinged screen.
1
Boido Construction
351 Morgan Road
West Springfield MA, 01089
413-737-3581
Second story construction and remodel of Deborah Foley and Tracey Akey's residence at
I ?Burts Pit Load.
Description of work to be performed
Remove existing bushes and steps in front of house. Excavate around front of house and
rear of house up to carport. Apply rubber foundation coating to minimize water
infiltration. Backfill foundation. Excavate for front porch. Pour footings for porch
foundation and pour concrete walls for front porch. Backfill new foundation. Pour
concrete slab on porch. Install columns as needed. Existing rood and car port demolition.
Remove and dispose of existing asphalt, shingles, roof, sheathing and roof rafters. Cover
dwelling with tarps.
Siding Removal
Remove and dispose of all existing siding and trim on entire dwelling.
Framing
Provide and install all necessary lumber for construction of second story addition. Install
Symington Window accordingly to plan specifications. Install I.K.O. Asphalt Roof
Shingles with ice barrier(color to be of owners choice). All construction to conform to
Mass Building Codes.
Siding
Install insulation board and Wolverine siding to entire home(color to be choice of
owner). Install Soffit Trim to outside corners and freize boards (color to be choice of
owner).
Front Porch
Install framing and rails and columns according to plan.
Heating and Air Conditioning
Remove existing hot air furnace in basement. Provide and install two units-one basement
unit consisting of high efficiency 75,000 BTU furnace complete with 2 1/2 ton central air
conditioning. Attic unit consisting of 80,000 BTU unit and 2 %2 ton central air
conditioning.
Fireplaces
Provide and install two Direct Vent Gas Fireplaces. Living room: construct outside
doghouse to house unit. Country Flame DV43 with remote and blower. Bedroom:
Majestic BDU36RRN with blower and remote.
I
� � i �
� � � �
� � i � �
1 I I i { +
t � � � � � � I
` � � � � I
` � ! �
r � � x
i
et
I
I
lz
a
........
R � �-.� � .
C.,
i � � j �
� o
i I s �
� � � � �
i j � ��'j
�_ i----� - �` -�-
----+---a— -- --
I ��
j `�� ;�?, �, 9v
��
� � � � �
� � � � � �
�.
U
,,�
�.� �
1
'�
J
E
i
I
F
t