Loading...
06-039 (10) 4 r 1 ��t f' if i. ',� �� , 4' CONSTRUCTION CONTROL FIELD INSPECTION REPORT Project: Zoe Senior Retirement Community SAGE ENGINEERING&CONTRACTING, INC. Job Location: 345 Haydenville Road 199 SERVISTAR INDUSTRIAL WAY, SUITE 2 Northampton, MA 01060 WESTFIELD, MASSACHUSETTS 01085 Inspection Date: 3-4-2014 Sage Job Number: 0482-04-13 Building Permit No: BP-2013-1095 WEATHER: Clear,9 0 EST. %OF COMPLETION: 35% CONSTRUCTION SUPERVISOR: Ed Fortini,Sage Engineering&Contracting, Inc. PRESENT AT SITE -Sage Engineering&Contracting, Inc. —Bryco Drywall Co. -McCain and Sons(Plumbing Sub Contractor) -Fortier Painting -Gustafson Electric(Electrical Sub Contractor) -A&J Home Improvement(roofing contractor) -Warehouse Mechanical(Fire Protection Sub Contractor) -Storage Container -Sage Storage Trailer -Lull 844C -Mobile Office Trailer -(2)Portable Restroom Facilities -JLG 600s WORK IN PROGRESS - Plywood was being installed on carport roof. - Roofer was starting installation of shingles on carport and airlock roof - Drywall was being sanded - Painting and priming of hallway east of gridline 6.5 on first floor - Soffits were being framed on second floor west of gridline 6.5 - Blown in insulation was being installed in second floor trusses east of gridline 6.5 - Rough electric being installed west of 6.5 on second floor - Rough fire protection being installed west of 6.5 on second floor - Poly vapor barrier and fiberglass baft insulation being installed on third floor exterior walls west of 6.5 - Siding being installed on west wing of building WORK COMPLETED SINCE PREVIOUS INSPECTION - Spray foam insulation has been completed on exterior walls of building. - Blown in insulation installed in third floor trusses east of gridline 6.5 - Hot and cold water supply lines have been installed throughout building - Drywall completed on first floor east of 6.5 except the I(itchen area. Work in Progress Is In Compliance With Plans&Specifications. INFORMATION OR ACTION REQUIRED COMMENTS &MAINhho- IT- OF .INSPECTION BY,. ENGINEE BATE: 3-4-14 4J -- � o N " AGE ENGINEERING AND CONTRACTINGy INC. I(,S If !arch SIGN- ILD DEVELOPMENT, ARCHITECTURAL ENGINEERING, AND CONSTRUCTION MANAGEMENT CEO 4� 45,L201 4 T5—= iJ W Louis Hasbrouck, Building Commi55ioner City of Northampton 21 2 Main Street Northampton, Ma 01060 RE:Zoe 5enior Retirement Community, 345 Haydenville Road, Northampton, Ma SAGE Project No. 0482 City of Northampton Building Permit No: BP-201 3-1095 Dear Mr. Hasbrouck: On behalf of Chakalo5 Investments, Inc., please find the enc105Cd Con5truction Control Field In5pection Report dated March 4th, 2014 a5 required by The 2009 International Building Code and the Massachusetts State Amendment to the 2009 International Building Code for your reference on the exi5tmg project in progress named above. We are available at your convenience to review the in5pection reports, answer any que5tion5 or concerns you may encounter recgarding th15 project. 51ncerely, Bryan Bahcki, P.F. Project Manager SAGE ENGINEERING CONTRACTING, INC. 199 5ERV15TAR INDUSTRIAL WAY-SUITE 2 WE5TFIELD, MA55ACHU5ETT5 01085 TEL: 413-5G2-4884 - FAX: 413-5G2-4899 PAGE I OF I www.5age-IIC.c0 m