Loading...
18D-071 (6) MASSACHUSETTS STATE BUILDING CODE CONSTRUCTION CONTROL FINAL REPORT DATE: 2/12/14 BUILDING PERMIT#: BP-2013-0862 PROJECT TITLE: Proposed Automobile Dealership PROJECT LOCATION: 361 King Street, Northampton, Massachusetts, 01060 NAME OF BUILDING: Northampton Volkswagen SCOPE OF PROJECT: Construction of a new 18,421sf automobile dealership. Included earthwork, utility and sewer connections, stormwater management system,footings, foundations, slab on grade, pre-engineered metal building structure, exterior walls (composite panels, horizontal metal panels, EFIS), membrane roof, HVAC,sprinkler,fire alarm, electrical, plumbing, site lighting, and landscaping. PURSUANT TO SECTION 107.6 OF THE MASSACHUSETTS STATE BUILDING CODE, I, Kimberlv Masiuk Associated Builders,Inc. NAME FIRM 4 Industrial Drive, South Hadley,MA 01075 (413)536-0021 ADDRESS PHONE NUMBER MASS. REGISTRATION NO. 40474 BEING A REGISTERED PROFESSIONAL ENGINEER HEREBY CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE, THE WORK CONCERNING: X ARCHITECTURAL _ STRUCTURAL MECHANICAL FIRE PROTECTION _ ELECTRICAL X OTHER(specify) HAS BEEN COMPLETED IN ACCORDANCE WITH PLANS, SPECIFICATIONS, APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I HAVE PERFORMED THE PROFESSIONAL SERVICES AND INSPECTIONS NECESSARY TO ENSURE THAT THE WORK WAS DONE IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT. INTERIM REPORTS SUBMITTED PRIOR TO THE FINAL REPORT FORM A BASIS FOR AND ARE TO BE CONSIDERED AN INTEGRAL PART OF THIS FINAL REPORT. IT IS MY OPINION THAT THE WORK HAS BEEN SATISFACTORILY COMPLETED AND IS READY FOR OCCUPANCY UPON FINAL APPROVALS FROM THE MUNICIPALITY. OF Fsslo" AL �``� Professional Seal &Signature MASSACHUSETTS STATE BUILDING CODE CONSTRUCTION CONTROL FINAL REPORT DATE: 01/30/14 BUILDING PERMIT#: BP-2013-0862 PROJECT TITLE: Proposed Automobile Dealership PROJECT LOCATION: 361 King Street, Northampton, Massachusetts, 01060 NAME OF BUILDING: Northampton Volkswagen SCOPE OF PROJECT: Construction of a new 18,421sf automobile dealership. Included earthwork, utility and sewer connections, stormwater management system,footings, foundations,slab on grade, pre-engineered metal building structure, exterior walls (composite panels, horizontal metal panels, EFIS), membrane roof, HVAC,sprinkler,fire alarm, electrical, plumbing,site lighting, and landscaping. PURSUANT TO SECTION 107.6 OF THE MASSACHUSETTS STATE BUILDING CODE, I, DAVID P.KRAUSE WAREHOUSE MECHANICAL CONTRACTORS INC. NAME FIRM 342 BRITTON STREET CHICOPEE, MA 01020 413-536-9222 ADDRESS PHONE NUMBER MASS. REGISTRATION NO. 5233 BEING A LICENSED PROFESSIONAL HEREBY CERTIFY THAT I HAVE PREPARED AND DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ARCHITECTURAL _ STRUCTURAL _ MECHANICAL X FIRE PROTECTION _ ELECTRICAL _ OTHER (specify) HAS BEEN COMPLETED IN ACCORDANCE WITH PLANS, SPECIFICATIONS, APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I HAVE PERFORMED THE PROFESSIONAL SERVICES AND INSPECTIONS NECESSARY TO ENSURE THAT THE WORK WAS DONE IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT. INTERIM REPORTS SUBMITTED PRIOR TO THE FINAL REPORT FORM A BASIS FOR AND ARE TO BE CONSIDERED AN INTEGRAL PART OF THIS FINAL REPORT. IT IS MY OPINION THAT THE WORK HAS BEEN SATISFACTORILY COMPLETED AND IS READY FOR OCCUPANCY UPON FINAL APPROVALS FROM THE MUNICIPALITY. Signature MASSACHUSETTS STATE BUILDING CODE CONSTRUCTION CONTROL FINAL REPORT DATE: 211/2014 BUILDING PERMIT#: BP-2013-0862 PROJECT TITLE: Proposed Automobile Dealership PROJECT LOCATION: 361 King Street, Northampton,Massachusetts, 01060 NAME OF BUILDING: Northampton Volkswagen SCOPE OF PROJECT: Construction of a new 18,421sf automobile dealership. Included earthwork, utility and sewer connections,stonmwater management system,footings, foundations,slab on grade, pre-engineered metal building structure, exterior walls(composite panels,horizontal metal panels, EFTS), membrane roof, HVAC,sprinkler,fire alarm,electrical, plumbing,site lighting,and landscaping. PURSUANT TO SECTION 107.6 OF THE MASSACHUSETTS STATE BUILDING CODE, I, William D. Lizotte NAME FIRM 22 Old Farm Road Palmer,MA 01069 413 283-9017 ADDRESS PHONE NUMBER ,ow MASS. REGISTRATION NO._39477 BEING A REGISTERED PROFESSIONAL ENGINEER HEREBY CERTIFY THAT,TO THE BEST OF MY KNOWLEDGE, THE WORK CONCERNING: ARCHITECTURAL _ STRUCTURAL MECHANICAL FIRE PROTECTION _X_ ELECTRICAL OTHER (specify) HAS BEEN COMPLETED IN ACCORDANCE WITH PLANS, SPECIFICATIONS, APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. 1 FURTHER CERTIFY THAT I HAVE PERFORMED THE PROFESSIONAL SERVICES AND INSPECTIONS NECESSARY TO ENSURE THAT THE WORK WAS DONE IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT. INTERIM REPORTS SUBMITTED PRIOR TO THE FINAL REPORT FORM A BASIS FOR AND ARE TO BE CONSIDERED AN INTEGRAL PART OF THIS FINAL REPORT. IT IS MY OPINION THAT THE WORK HAS BEEN SATISFACTORILY COMPLETED AND IS READY FOR OCCUPANCY UPON FINAL APPROVALS FROM TH MUNICIPALITY. " 4 •''Professional Seal &Signature MASSACHUSETTS STATE BUILDING CODE CONSTRUCTION CONTROL FINAL REPORT low* DATE: February 12, 2014 BUILDING PERMIT#: BP-2013-0862 PROJECT TITLE: Proposed Automobile Dealership PROJECT LOCATION: 361 King Street, Northampton, Massachusetts, 01060 NAME OF BUILDING: Northampton Volkswagen SCOPE OF PROJECT: Construction of a new 18,421sf automobile dealership. Included earthwork, utility and sewer connections,stormwater management system,footings, foundations,slab on grade, pre-engineered metal building structure, exterior walls (composite panels,horizontal metal panels, EFIS),membrane roof, HVAC,sprinkler,fire alarm,electrical, plumbing,site lighting, and landscaping. PURSUANT TO SECTION 107.6 OF THE MASSACHUSETTS STATE BUILDING CODE, I, Michael T.Puntin Climate Heating& Cooling,Inc. NAME FIRM 146 Hubbard Ave.,Pittsfield,MA 01201 (413)684-5100 x 19 ADDRESS PHONE NUMBER MASS. REGISTRATION NO. 46860 BEING A REGISTERED PROFESSIONAL ENGINEER HEREBY CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE, THE WORK CONCERNING: ARCHITECTURAL — STRUCTURAL X MECHANICAL FIRE PROTECTION ELECTRICAL _ OTHER(specify) HAS BEEN COMPLETED IN ACCORDANCE WITH PLANS, SPECIFICATIONS, APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I HAVE PERFORMED THE PROFESSIONAL SERVICES AND INSPECTIONS NECESSARY TO ENSURE THAT THE WORK WAS DONE IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT. INTERIM REPORTS SUBMITTED PRIOR TO THE FINAL REPORT FORM A BASIS FOR AND ARE TO BE CONSIDERED AN INTEGRAL PART OF THIS FINAL REPORT. IT IS MY OPINION THAT THE WORK HAS BEEN SATISFACTORILY COMPLETED AND IS READY FOR OCCUPANCY UPON FINAL APPROVALS FROM T IICIPALITY ItA Of WC s IC .46860 bjAl Professional Seal & Signature MASSACHUSETTS STATE BUILDING CODE CONSTRUCTION CONTROL FINAL REPORT DATE: January 31,2014 BUILDING PERMIT#: BP-2013-0862 PROJECT TITLE: Proposed Automobile Dealership PROJECT LOCATION: 361 King Street,Northampton, Massachusetts,01060 NAME OF BUILDING: Northampton Volkswagen SCOPE OF PROJECT: Construction of a new 18,421sf automobile dealership.Included earthwork, utility and sewer connections,stormwater management system,footings, foundations,slab on grade,pre-engineered metal building structure, exterior wails(composite panels,horizontal metal panels, EFIS), membrane roof,HVAC,sprinkler,fire alarm,electrical,plumbing,site lighting,and landscaping. PURSUANT TO SECTION 107.6 OF THE MASSACHUSETTS STATE BUILDING CODE, 1, _Robert F Griffiths _ Robt.W.Hall Consulting Engineers,Inc. NAME FIRM 540 Meadow Street Extension,Agawam,MA 01001 413.789.0960 ADDRESS PHONE NUMBER MASS. REGISTRATION NO. 33161 BEING A REGISTERED PROFESSIONAL ENGINEER HEREBY CERTIFY THAT,TO THE BEST OF MY KNOWLEDGE, THE WORK CONCERNING: ARCHITECTURAL STRUCTURAL _ MECHANICAL FIRE PROTECTION — ELECTRICAL ® OTHER(specify) (Plumbing Only) HAS BEEN COMPLETED IN ACCORDANCE WITH PLANS, SPECIFICATIONS, APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I HAVE PERFORMED THE PROFESSIONAL SERVICES AND INSPECTIONS NECESSARY TO ENSURE THAT THE WORK WAS DONE IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT. INTERIM REPORTS SUBMITTED PRIOR TO THE FINAL REPORT FORM A BASIS FOR AND ARE TO BE CONSIDERED AN INTEGRAL PART OF THIS FINAL R P RT. IT IS MY OPINION THAT THE WORK HAS BEEN S OMPLETED AND IS READY FOR OCCUPANCY UPON FINAL APPROVALS F ITY. GRIFFITHS a.33161 tg. �tiC essi nal Seal&Signature SPECIAL INSPECTION FIELD REPORT ASSOCIATED BUILDERS, INC Project Northampton Volkswagen 4 INDUSTRIAL DRIVE Job Location 361 King Street, Northampton,MA SOUTH HADLEY, MA 01075 Date 02-12-2014 (413)536-0021 Building Permit No. BP-2013-0862 PRESENT ON-SITE Associated Builders, Inc. (Site Inspectors)—Kimberly Masiuk &Timothy Houle Associated Builders, Inc. (General Contractor)—Paul Ciolek Gustafson Electric Electrical Subcontractor WORK SUMMARY 99%Complete Erosion Control Straw waddles and erosion control mats in use along King Street. To remain until vegetation has been established inspring. Earthwork Complete Sanitary Sewer Complete Storm Drainage Complete Water Service Complete Gas Service Complete Electric Service Complete Site Lighting Complete Tel/Data Service Complete Paving &Curbing Complete Landscaping, Fencing & Final landscaping to be completed in spring as weather permits. Si na e Footings& Foundation Complete Floors Complete Exterior Concrete Com lete Steel Framing/Sheeting Complete Carpentry Complete Foundation Insulation Complete Building Insulation Complete Membrane Roof Complete Exterior Wall Finishes EFIS base done. Top coat to be completed inspring. ACM complete Doors &Windows Complete Interior Finishes Complete except small portion of tile floor in service drive. To be completed on 2/13 Plumbing Complete Fire Protection Complete HVAC Complete Electrical Complete Fire Alarm Complete Miscellaneous J Complete NOTES&OBSERVATIONS Construction under the above referenced permit is substantially complete pending final inspections by municipality. ATTACHMENTS ENGINEER: e DATE: Z Ll mberly M.Masiu ,P.E. J 0 ASSOCIATED BUILDERS, INC. 4INDUSTRIAL DRIVE•SOUTH HADLEY,MA 01075•(413)536-0021 FAX(413)536-0908 February 12, 2014 Louis Hasbrouck, Building Commissioner City of Northampton 212 Main Street Northampton, MA 01060 RE: Building Permit BP-2013-0862—Request for Certificate of Occupancy Northampton Volkswagen 347 King Street,Northampton,MA 01060 Dear Mr. Hasbrouck, We are pleased to inform you that construction under the above referenced permit is substantially complete pending final inspections by the municipality. We have enclosed our latest field inspection report and final construction control affidavits from all of the respective designers. Please note that final landscaping and the EFIS top coat will be completed as soon as possible, pending weather conditions. We will notify you as soon as we have the work completed. It has been a pleasure working with you and your staff. Sincerely, Kimberly M. asiuk, P.E. Project Engineer cc: Carla J.Cosenzi,Cosenzi Automotive Realty,LP(1) AB Project File(1) yes x AN '01" A—�, ? ✓°" xz "` }i". ^s =Es ,nrt c " �°' k _ a' - r•�'n& Yi'F,.. s c s a� r •� f �y v � I Y yr WE NMI le c t t a�,}' = .`t _, S,�s ,t .,tr•s. ,„.�r +s>t s. r `' -rs:. Y p d' a M mm U h F x f X4 i & - 'S ""3YtY� $ .� �" d { `t t d^ �*?R.4 �1' •3,t ampo MITI:z #x s����'� `.c �`v �'�•�^'i-"g�y� ��`���} 5E•k .`�3 ^� �•0 V4 list { 13 iQ L- NERO Smw � v Al a 9 F"s'`K�,: KIM may a i• ,T WF t .r az ye V u �t r: vt- � ) qn C � ���' �� S�-..������ '. $ "'y.�". ,� ]rye x• " y��'�`��3a. �c �Y�S �, a� s� �x� +��� Ths 'ws` s��•��� c�i- ��x ?.i a` €, '�' `v � w �' v3� �r� d �" i, v' v, �4. s 361 KING ST BP-2013-0862 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 18D-071 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL 042A) Category:NEW COMMERCIAL BUILDING BUILDING PERMIT, Permit# BP-2013-0862 Proiect# JS-2013-001479 Est. Cost:$2611800.00 Fee:$9210.50 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: ASSOCIATED BUILDERS INC 63481 Lot Size(sq. ft.): Owner. CONSENZI AUTOMOTIVE REALTY LIMITED PARTNERSHIP Zoning:HB Applicant. ASSOCIATED BUILDERS INC AT. 361 KING ST Anylicant Address: Phone: Insurance: 4 Industrial Drive (413) 536-0021 WC SOUTH HADLEYMA01075 ISSUED ON.4/4/2013 0.00:00 TO PERFORM THE FOLLOWING WORK.-CONSTRUCT 18,421 SQ FT VOLKSWAGON CAR DEALERSHIP POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: � J Driveway Final: Final: r�� Final: Rough Frame: �Gas: Fire Department fireplace/Chimy: Rough: Oil: Insulation: �Cp `, Final: ��l�7 Smo e: F/q Final: OK I4e qi f (01411 THIS PERMIT MAY BE REVOKED BY TIDE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. - Certificate of cv--/, /4�2 Signature: �rxwc.b ��avc�t�hr FeeTyue: Date Paid: Amount: Building 4/4/2013 0:00:00 $9210.50 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner