06-039 (9) CONSTRUCTION CONTROL FIELD INSPECTION REPORT Project: Zoe Senior Retirement Community SAGE ENGINEERING&CONTRACTING, INC. Job Location: 345 Haydenville Road 199 SERVISTAR INDUSTRIAL WAY, SUITE 2 Northampton, MA 01060 WESTFIELD, MASSACHUSETTS 01085 Inspection Date: 2-12-2014 (413)562-4884 Time: 11:00 AM to 01:00 PM Sage Job Number: 0482-04-13 Building Permit No: BP.2013-1096 WEATHER: Clear,22 0 EST. %OF COMPLETION: 28% CONSTRUCTION SUPERVISOR: Ed Fortini,Sage Engineering&Contracting, Inc. PRESENT AT SITE -Sage Engineering&Contracting, Inc. —Bryco Drywall Co. -McCain and Sons(Plumbing Sub Contractor) -Fortier Painting -Gustafson Electric(Electrical Sub Contractor) -Warehouse Mechanical(Fire Protection Sub Contractor) Eguipment: -Storage Container -Sage Storage Trailer -Lull 844C -Mobile Office Trailer -(2)Portable Restroom Facilities WORK IN PROGRESS - Carport and airlock trusses were being installed - Drywall was being taped and mudded on first floor east of gridline 6.5 - VTAC units and cabinets are being installed on 2nd floor east of gridline 6.5 - Painting and priming of hallway and unit walls east of gridline 6.5 on second floor - Spray foam insulation was being installed on exterior wall first floor west of gridline 6.5 - Carpenters were furring out steel beams and columns to prep for drywall on first floor east gridline 6.5. - Blown in insulation was being installed in attic east of gridline 6.5 - Rough electric being installed west of 6.5 WORK COMPLETED SINCE PREVIOUS INSPECTION - All VTAC units have been installed east of gridline 3.5 - All bearing and partition walls have been installed throughout building - 3rd floor exterior spray foam has been installed. - Insulation has been installed on first floor east of gridline 6.5 - Waste and vent lines have been installed throughout building - Carport structural steel has been installed OBSERVATIONS Work in Progress Is In Compliance With Plans&Specifications. INFORMATION OR ACTION REQUIRED COMMENTS Temporary heat has been installed first floor west of 6.5 INSPECTION BY: ENGINEER: an i P.E. Frank DeMarinis, P.E. DATE: 2-12 DATE: 2-12-14 Ir zo — .39 SAGE ENGINEERING AND CONTRACTING9 INC. DE51GN-BUILD DEVELOPMENT, ARCHITECTURAL ENGINEERING, AND CONSTRUCTION MANAGEMENT February 12, 2014 13 -- L FEB 18 2014 Loui5 Hasbrouck, Buildinej, Commi55ioner I ------_._-Eie C! City of Northampton 'e°t'Os 21 2 Main Street Northampton, Ma 01060 RE:Zoe Senior Retirement Community, 345 Haydenville Road, Northampton, Ma SAGE Project No. 0482 City of Northampton Building Permit No: BP-201 3-1095 Dear Mr. Ha5brouck: On behalf of Chaka105 Investments, Inc., please find the enclosed Con5truction Control Field In5pect1on Report dated 2-12- 14 a5 required by The 2009 International Building Code and the Massachusetts State Amendment to the 2009 International Building Code for your reference on the existing project in progress named above. We are available at your convenience to review the m5pectlon reports, answer any 6Jue5t1on5 or concerns you may encounter regarding th15 project. Sincerely, 9 J9^J `j Bryan-6alicki, P.E. Project Manager SAGE ENGINEERING CONTRACTING, INC. 199 5ERV15TAR INDUSTRIAL WAY-SUITE 2 WE5TFIELD, MASSACHUSETTS 01055 TEL: 413-5G2-4884 - FAX: 413-5G2-4899 PAGE I OF I www.5age-IIc.com