Loading...
34-006 (7) Y J V 1 ly' V �i CITY OF NORTHAMPTON, MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS 125 Locust Street Northampton, MA 01060 413-587-1570 Fax 413-587-1576 Samuel B. Brindis, P.E. Director, City Engineer Guilford B. Mooring, P.E. Assistant Director of Public Works BOARD OF PUBLIC WORKS DRIVEWAY PERMIT GENERAL INSTRUCTIONS AND REGULATIONS I. A "Driveway Permit" is required in all cases where a new curb cut or an alteration to an existing curb cut is proposed on a City public way. 2. Driveway permits issued by the Board of Public Works (BPW) shall be attached to and become part of the 'Building Permit" issued by the Building Inspector. 3. Prior to the issuance of a "Building Permit" the owner of any lot to be serviced by a new driveway shall apply to the BPW for a "Driveway Permit" by completing the pertinent portions of the permit(see attached). Once the location of the driveway is approved by the BPW, a building permit may be issued. 4. The Building Inspector shall not issue an"Occupancy Permit" unless the driveway to the lot has been approved by the BPW. 5. By the issuance of a driveway permit for the stated location, neither the City of Northampton nor the Department of Public Works imply that no drainage problems will result with the driveway when constructed. Properties situated or driveways installed in low lying areas in the path of the natural drainage will be subject to water problems. These problems may include water sheeting across roadways adjacent to the driveway. The City and the DPW assume no responsibility for any such drainage problems. The owner of the property is responsible for constructing and maintaining the driveway with adequate provision for natural water runoff situations. 'r6tPamuel B Brindis, P.E. Director of Public Works C:\MyFi1es\L3,n\Driveway Permit General Instructions Permit No D19-02 Conditions: Driveway Permit In lieu of plan approved by City Engineer I agree to the following added conditions: 1. I will contact the Department of Public Works and have an inspector check and approve the graded gravel base prior to paving to insure compliance with slope and location; 2. I further agree that if in the inspections any of the permit conditions are not met that I will at no expense to the City remove and replace the driveway as directed by the City Engineer. By: Petitioner Richard Bond 296 Turkey Hill Road Northampton, MA 01062 413-586-5581 Note: The Public Works Department recommends that you provide a plan showing the proposed driveway with grades and location in the future to avoid possible expense which you will incur by not getting approval of actual plans in advance. tI Permit No. D19-02 CITY OF NORTHAMPTON, MA DRIVEWAY PERMIT Date: 04-01-02 FEE: $25.00 CHECK#: 1758 THE BOARD OF PUBLIC WORKS The undersigned respectfully petitions your honorable body for: Permission to install a driveway a?76 Hill Road (296 Turkey Hill Road Next Property) Fifteen (15) foot maximum width at the street line. Gutter drainage not to be disturbed. All drainage shall be directed off the driveway surface to adjacent land and not on the existing roadway. Driveway surface to be paved if the grade of the proposed driveway exceeds 3% or more. By; 96 Turkey Hill Road Northampton, MA 01062 Telephone #: � Proposed Location ` t Cr Inspected By: Gravel Base Grade Inspected By: Final Approval THE BOARD OR PURLIC,,WORKS voted that petition be granted. v JL George Andrikidis Director of Public Works (SUBJECT TO ATTACHED CONDITION I & 2)