Loading...
08-021 (41) v 0 rt .°� a O mn �- `') I' .� c v ® y. o �, > IA L o C � -� c cD O o. c cl � a Nq ,� A e- O mop rm N O l ei o fA -•1 -. "v `< CD -. -• o �n t� Final Construction Control Document !� To be submitted at completion of construction by a Registered Design Professional 3*� for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: ate: Permit No. Property m Address: f �%(;.; !`? > lfa'j �r ✓ ! , 4/T" t Project:- Check(x)one or both as applicable: New construction Existing Construction Project description: 1 �r�t(MA Registration Number:- 5 Expiration date: am a registered design professional, and E have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural t Mechanical Fire Protection Other:Describe for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that l or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. I lave performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions 107. o� Jf._c lt44i �4�e Enter in the space to the right a"wet"or electronic signature and seat: s'RU=TUkAL r Phone number: Email: Building Official Use Only Building Official Name: Perinit No.: Date: Version flip 1 l 2313 Final Construction Control Document F To be submitted at completion of construction by a d Registered Design Professional for work per the 8t'edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Dr.Mary Pat Roy Medical Office Date:1-30-14 Permit No.BP-2014-0679 Property Address: 766 North King Street,Northampton,MA Project: Check(x)one or both as applicable: New construction X Existing Construction Project description: Construction of new interior partitions and office casework, interior finishes, lighting and electrical outlet layout tied back to existing system,new HVAC duct tied back to existing system, review of exiting and CMR 521 accessibility. I Karen T.Hunt MA Registration Number:AR6191 Expiration date: 8-31-14 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: X Architectural Structural X Mechanical Fire Protection X Electrical Other:Describe for the above named project. 1,or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: I. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 712JQMR. 107. COED ARO,,,� Enter in the space to the right a"wet"or L tiny r�r� electronic signature and seal: No.6191 N 0 MASS y �J Oy��gc LPG Phone number: 413-770-1225 Email: karenthunt @gmail.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 February 5, 20 i J a o Louis Hasbrouck Building Commissioner City of&orthampton 210 Main Street Northo,:ripton, MA, 01030 DAVID J. TIERNEY, JR. 1:E: ?'ermiiJ1BP­.)11)14-0679 INC. i'roject 4JS-2014-001 160 GENERAL lt36 `Ji)1"lh King street. Suite 1 CONTRACTORS itio ihainpwn, NI Bear Louis: a� co "l h1s 1.' tter is to confirm project comp,,,tion and n"clne';t your inspc(aion 'n igprfrov,l L, { o n f•n �� t I r: n ,nr is_.uan.,e o- ,._��i•.,,fl;,;,te c. .�cunancv ti)r�h.i:� hrc�i„ct. n � hi, p , . , +�,itt� cxtc�..�on of l,:.n��r, i±_x:e .,� I rctiovations at 66 North Kin- Sired in �'�ii)r.lii�il"�t�ti�CE li �?C"I3 S� 1:1St1Clti�alj `D :.0111pic ted in accordance with plans and specifications by Karen 'l . Ilunt, Arci',itect, Ard Bernard Hunt, Structural Engineer. V' I ('spies of Architectural and Structural Construction Control Ltters and C_,rtiticate a of Substantial Completion will be forwarded to your office. d y We certify that, to the best of our knowledge and belief, all wort: on this project has I been done in substantial accord with approved construction documcnts by 1:,a-en T. y Hunt; Architect and respective Engineers. Throughout the work, the project has Been insrxcted for cornpl>ance with apphcablle statues and regulatior_s by Ilic Owiier, j Arcilitz ct, Engineer and pertinent town inspectors. I o N ° If anprJllriate, Ulease advise us ora any items that must bt_ addressed prior to . , lssmince ofa Certifleate ofOccupan:y In order that this building.may l'•t'. as soon as possib'e for its intended use by IDIr. Mary Pat Roy. Should you have any ,pi twalc (in t1,P n­.-ii".4 rllesic., _nl1r��t 17I; aC C()/)n ,Is n .s;h1< Thank you. i w 4 .t� i n Cordially yours, >C v w c DAVID J. TIERNEY, JR., INC. w 9 c�. Cyr,-L✓- Michael J. M kes P Project Manager A v v Enclosures I cc. Dr. Mary Pat Roy, MD Equal Karen T. 111.1nt, .Architect Opportunity i Employer 766 NORTH KING ST BP-2014-0679 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block:08-021 CITY OF NORTHAMPTON Lot: -000 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:renovation BUILDING PERMIT Permit# BP-2014-0679 Project# JS-2014-001160 Est. Cost: $88000.00 Fee: $528.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: DAVID J TIERNEY JR INC 056412 Lot Size(ss . ft.): Owner: GLANDORE LLC Zoning: HB(l00)/RI(l00) Applicant: DAVID J TIERNEY JR INC AT. 766 NORTH KING ST Applicant Address: Phone: Insurance: 169 GALE AVENUE (413) 499-1410 WC PITTSFIELDMA01201 ISSUED ON.•121412013 0:00:00 TO PERFORM THE FOLLOWING WORK.-REPAIR AUTOMOBILE DAMAGE INCLUDING MEP POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough:/ House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: 0=t: Insulation: 419 o—_ Final: Smoke: Final: THIS PERMIT MAY BE REVO Y E F NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND G p / Certificate of Occu anc si nature: -(,rso S UZ ovc�t.�fv FeeType: Date Paid: Amount: Building 12/4/2013 0:00:00 $528.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Conunissioner