08-021 (41) v
0
rt .°�
a O mn �-
`') I' .� c v ® y.
o �, > IA
L o C � -�
c cD O o. c cl
� a Nq ,� A
e- O mop
rm
N O
l
ei
o fA -•1 -. "v `< CD
-. -•
o
�n t�
Final Construction Control Document
!� To be submitted at completion of construction by a
Registered Design Professional
3*� for work per the 8th edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: ate: Permit No.
Property m Address: f �%(;.; !`? > lfa'j �r ✓ ! , 4/T"
t
Project:- Check(x)one or both as applicable: New construction Existing Construction
Project description:
1 �r�t(MA Registration Number:- 5 Expiration date: am a registered design professional, and E have
prepared or directly supervised the preparation of all design plans,computations and specifications concerning:
Architectural t Mechanical
Fire Protection Other:Describe
for the above named project. I,or my designee,have performed the necessary professional services and was present at the
construction site on a regular and periodic basis.To the best of my knowledge, information,and belief the work
proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building
permit and that l or my designee:
1. Have reviewed,for conformance to this code and the design concept, shop drawings,samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. I lave performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions 107.
o�
Jf._c lt44i �4�e
Enter in the space to the right a"wet"or
electronic signature and seat: s'RU=TUkAL
r
Phone number: Email:
Building Official Use Only
Building Official Name: Perinit No.: Date:
Version flip 1 l 2313
Final Construction Control Document
F To be submitted at completion of construction by a
d Registered Design Professional
for work per the 8t'edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Dr.Mary Pat Roy Medical Office Date:1-30-14 Permit No.BP-2014-0679
Property Address: 766 North King Street,Northampton,MA
Project: Check(x)one or both as applicable: New construction X Existing Construction
Project description: Construction of new interior partitions and office casework, interior finishes, lighting and electrical
outlet layout tied back to existing system,new HVAC duct tied back to existing system, review of exiting and CMR 521
accessibility.
I Karen T.Hunt MA Registration Number:AR6191 Expiration date: 8-31-14 ,am a registered design professional, and I
have prepared or directly supervised the preparation of all design plans, computations and specifications concerning:
X Architectural Structural X Mechanical
Fire Protection X Electrical Other:Describe
for the above named project. 1,or my designee, have performed the necessary professional services and was present at the
construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work
proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building
permit and that I or my designee:
I. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 712JQMR. 107.
COED ARO,,,�
Enter in the space to the right a"wet"or L tiny r�r�
electronic signature and seal: No.6191 N
0
MASS y
�J
Oy��gc LPG
Phone number: 413-770-1225 Email: karenthunt @gmail.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Version 06 11 2013
February 5, 20 i J
a o
Louis Hasbrouck
Building Commissioner
City of&orthampton
210 Main Street
Northo,:ripton, MA, 01030
DAVID J.
TIERNEY, JR. 1:E: ?'ermiiJ1BP.)11)14-0679
INC.
i'roject 4JS-2014-001 160
GENERAL lt36 `Ji)1"lh King street. Suite 1
CONTRACTORS itio ihainpwn, NI
Bear Louis:
a�
co
"l h1s 1.' tter is to confirm project comp,,,tion and n"clne';t your inspc(aion 'n igprfrov,l
L, { o n f•n �� t I r: n
,nr is_.uan.,e o- ,._��i•.,,fl;,;,te c. .�cunancv ti)r�h.i:� hrc�i„ct.
n � hi, p , . ,
+�,itt� cxtc�..�on of l,:.n��r, i±_x:e .,�
I rctiovations at 66 North Kin- Sired in �'�ii)r.lii�il"�t�ti�CE li �?C"I3 S� 1:1St1Clti�alj
`D :.0111pic ted in accordance with plans and specifications by Karen 'l . Ilunt, Arci',itect,
Ard Bernard Hunt, Structural Engineer.
V'
I ('spies of Architectural and Structural Construction Control Ltters and C_,rtiticate
a of Substantial Completion will be forwarded to your office.
d
y We certify that, to the best of our knowledge and belief, all wort: on this project has
I been done in substantial accord with approved construction documcnts by 1:,a-en T.
y Hunt; Architect and respective Engineers. Throughout the work, the project has
Been insrxcted for cornpl>ance with apphcablle statues and regulatior_s by Ilic Owiier,
j Arcilitz ct, Engineer and pertinent town inspectors.
I o
N
° If anprJllriate, Ulease advise us ora any items that must bt_ addressed prior to
. ,
lssmince ofa Certifleate ofOccupan:y In order that this building.may l'•t'.
as soon as possib'e for its intended use by IDIr. Mary Pat Roy.
Should you have any ,pi twalc (in t1,P n.-ii".4 rllesic., _nl1r��t 17I; aC C()/)n ,Is n .s;h1<
Thank you.
i w
4 .t�
i n Cordially yours,
>C v
w c DAVID J. TIERNEY, JR., INC.
w
9
c�. Cyr,-L✓-
Michael J. M kes
P Project Manager
A
v
v
Enclosures
I cc. Dr. Mary Pat Roy, MD
Equal Karen T. 111.1nt, .Architect
Opportunity
i Employer
766 NORTH KING ST BP-2014-0679
GIS#: COMMONWEALTH OF MASSACHUSETTS
Map:Block:08-021 CITY OF NORTHAMPTON
Lot: -000 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category:renovation BUILDING PERMIT
Permit# BP-2014-0679
Project# JS-2014-001160
Est. Cost: $88000.00
Fee: $528.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: DAVID J TIERNEY JR INC 056412
Lot Size(ss . ft.): Owner: GLANDORE LLC
Zoning: HB(l00)/RI(l00) Applicant: DAVID J TIERNEY JR INC
AT. 766 NORTH KING ST
Applicant Address: Phone: Insurance:
169 GALE AVENUE (413) 499-1410 WC
PITTSFIELDMA01201 ISSUED ON.•121412013 0:00:00
TO PERFORM THE FOLLOWING WORK.-REPAIR AUTOMOBILE DAMAGE INCLUDING
MEP
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough:/ House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: 0=t: Insulation: 419 o—_
Final: Smoke: Final:
THIS PERMIT MAY BE REVO Y E F NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND G p /
Certificate of Occu anc si nature:
-(,rso S UZ ovc�t.�fv
FeeType: Date Paid: Amount:
Building 12/4/2013 0:00:00 $528.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Louis Hasbrouck—Building Conunissioner