Loading...
25A-153 (6) 5,3 4& 30 West Pomeroy Lane Amherst, MA 01002 Phone: 413-835-5162 POWERHOUSE Email: matt.turcotte @gmail.com Site Information Date Of Test: 1/30/2014 Client: All Seasons Heating & Air Conditioning Site Address: 39 - 41 Woodbine Ave Northampton, MA 01060 Test Performed By: Matt Turcotte Job#: DT-054 Pressurization Duct Results Type of Test Performed: Post-Construction, total leakage (12%) Duct System 1 Conditioned Floor Area: 1579 sq ft Duct Flow at 25 Pa: 151 CFM Duct Leakage: 9.56 CFM per 100 sq ft of conditioned floor area TEST RESULT : PASS Duct System 2 (if applicable) Conditioned Floor Area: N/A sq ft Duct Flow at 25 Pa: N/A CFM Duct Leakage: N/A CFM per 100 sq ft of conditioned floor area TEST RESULT: N/A Notes on Area Tested and/or Testing Conditions: 119 IECC Minimum Requirements. per • 403.2.2 Mid-Construction Test, total leakage without air handler< 4 CFM per 100 sq ft of conditioned floor area Mid-Construction Test, total leakage with air handler< 6 CFM per 100 sq ft of conditioned floor area Post-Construction Test, leakage to the outdoors < 8 CFM per 100 sq ft of conditioned floor area Post-Construction Test, total leakage< 12 CFM per 100 sq ft of conditioned floor area