10B-052 (4) •
Standard Ceiling Installation with Cathedral Ceiling Installation with
Factory Built Chimney Factory Built Chimney
Chimney cap
Chimney sections
Storm collar
Chimney cap --o-
Roof flashing
Factory-Built metal Sealed storm
chimney collar
------- Roof radiation shield Roof flashing
Roof radiation
Attic radiation shield shield
Cathedral style
chimney support
Minimum airspace
with chimney listing Finishing collar
Chimney support
Chimney Connector Chimney Connector
as
Ll
LTTT111 1111 11111 11
13 Harman TL300 3-90-06901R16_01/14
Installation/Clearances
Single Wall Pipe - Parallel Installation
15"* 375 mm
T
(775 mm) "'31"-"
mm)
2'(so 23"
(775 mm) _
y (575 mm)
rte -.
---20" o
° ��,L7] (500 mm) r
- 17„
r mm
_ J
Top vent ceiling and sidewall clearances Top Vent to vented out side wall with 90°elbow Top vent vented out back wall with 90°elbow.
24" ' ;18" 23" ' .17"
(600 mm) (450 mm) (575 mm) :425 mm)
31" -
i(7is mm)
20"
(;Oo mm)
Double Wall Pipe - Parallel Installation
11"*(275 mm)
(7 08 m)- --.7 o8m)- - T2'(5omm) 21"
y ....
17"- "
(425 mm)
=LL
j
-
Top vent ceiling and sidewall clearances Top Vent vented out side wall with 90° Top vent vented out back wall with 90°
elbow.*Masonry Chimney Only.
elbow."Masonry Chimney Only.
18.5" ' 13" 21" 15"
(925 mm); :(325 mm) (525 mm) :(375 mm)
(�7 08" - -
--_ 425 mm)
Corner Installation with Single and Double Wall Pipe
There is no clearance reduction from single wall to double wall pipe in a corner installation.
18" 27"
(450 mm); ;(675 mm) *Check with your local building codes for clearances.
27"
(675 mm)
;18"
(450 mm)
9 Harman TL300 3-90-06901R16_01/14
Installation
Clearances
Clearance is the empty space required between the stove or
chimney connector and the nearest combustible surface or 7KFront-es- USA/CANADA* 8 203
object, such as walls,ceilings,floors,or furniture. Clearance
distances may only be reduced by using methods approved USA/CANADA* 16 457
by either the CAN/CSA 8365 standard (Canada) or NFPA
211 (U.S.) Contact your building authority for information if ar- USA 8 203
you are interested in reducing clearance distances below L Rear- CANADA Wall Wall
those presented here.
Parallel versus Corner Installations FLOOR PROTECTOR/PROTECTION DE SOL(MIN. 51"X44")
A parallel installation is one in which the back and sides of ; L 54"
the stove are parallel to the walls behind and to the side of
the stove.A corner installation is one in which the back of the
stove is positioned diagonally across a corner of the room.
Each installation requires its own set of clearances.
For parallel installations, the required clearance distances ® t
from the stove are:
1. to the side wall, 20" (508 mm);
2. to the back wall, 18" (458 mm).
3. From the chimney connector to the wall, 31"(787 mm)
K ----
4. Horizontal pipe to the ceiling, 15"(381 mm). J J
NOTE: For a vertical chimney connector in a parallel
installation the distance from the connector to the side wall Alternate floorprotector dimension maybe used as long as they satisfy
must be 31"(787 mm), due to the required side clearance of the measurement requirements shown above.
the stove itself. Fireplace installations must meet these same Minimum size floor protection for a corner installation hearth pad is
clearance requirements; specifically follow these guidelines 54"x 54°(USA ONLY).
for mantel and trim clearances. Mobile Home Installation
For corner installations, the clearance distances from The TL300 is approved for mobile home installations in the US
the stove are 18"(458 mm) from each corner of the stove only.Mobile Home installation should be done in accordance
measured straight to the nearest combustible material, and with the Manufactured Home and Safety Standard (HUD),
27" (686 mm)from the chimney connector to the walls. CFR 3280, part 24.
From the front of the stove, clearance to combustible When installing the TL300 in a mobile home, several
materials such as furniture,curtains,fuel,etc.:48"(1220 mm) requirements must be met:
in the U.S. and 60"(1524 mm) in Canada. Due to excessive 1. The unit must be bolted to the floor. This can be done
heat build-up at the wall passthrough,using double wall pipe, through the rear of the pedestal with 3"lag screws, using
horizontal venting is only approved into a masonry chimney. the holes where the unit was bolted to the shipping pallet.
See Detailed Clearances on the following page 2. The unit must be connected to outside air. See Outside
Floor Protection air section under options.
Floor protection is required under your TL300. This floor 3. Floor protection and specified clearances to combustibles
protection must be a minimum of 20 ga. sheet metal in must be followed.
thickness, it can also be stone or tile or other masonry 4. Unit must be grounded to the metal frame of the mobile
material,providing it is non-combustible. In the U.S.the floor home.
protector must be completely under the stove,and extending
16" in front of the door opening, 8' to each side and 8" to 5. Smoke detectors and/or smoke alarms are recommended
the back. on each floor of the house. Note that when loading fire,
In Canada; the floor protection must extend 18" (457mm) some smoke seepage may occur, and set off the alarm.
Ventilate as necessary to eliminate the problem. If the
in front of the door opening, 8" (203mm) to each side and alarm should sound otherwise, cease the use of the
extend to the wall behind the stove. appliance and call your dealer for service.
MOBILE HOME REGULATIONS DO NOT ALLOW
INSTALLATION IN ANY ROOM DESIGNATED FOR
SLEEPING.
8 Harman TL300 3-90-06901R16_01/14
The Commonwealth of Massachusetts
Department of Industrial Accidents
Office of Investigations
d 1 Congress Street,Suite 100
Boston,MA 02114-2017
www.mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Lezibly
Name (Business/Organization/Individual): BERNARDSTON FARMERS SUPPLY
Address:43 RIVER STREET
City/State/Zip:BERNARDSTON, MA 01337 Phone #:413-648-9311
Are you an employer?Check the appropriate box: Type of project(required):
1.❑■ I am a employer with 10 4. ❑ I am a general contractor and I
employees (full and/or part-time).* have hired the sub-contractors 6. E]New construction
2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling
ship and have no employees These sub-contractors have g. ❑Demolition
working for me in any capacity. employees and have workers'
[No workers' comp. insurance comp.insurance.$ 9. E] Building addition
required.] 5. ❑ We are a corporation and its 10.E] Electrical repairs or additions
3.❑ 1 am a homeowner doing all work officers have exercised their 1 L❑ Plumbing repairs or additions
myself. [No workers' comp. right of exemption per MGL 12.0 Roof repairs
insurance required.] t c. 152, §1(4),and we have no
employees. [No workers' 11❑ Other
comp. insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
�Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
$Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name:PEERLESS INSURANCE
Policy#or Self-ins. Lic. #:WC8165644 Expiration Date. 7 /-Z 0 t c,J
Job Site Address: --( �&Cr yo,!2 WA City/State/Zip: MA i
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certify under the pains and p allies of perjury that the information provided above is true and correct.
Signature: � Date: 4 5 �Z
Phone#: 931
Official use only. Do not write in this area,to be completed by city or town official.
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector
6.Other
Contact Person: Phone#:
Cjty, of Northampton
Massachusetts
tt�� T OF BUILDING INSPECTIONS
ti 212in Street • Municipal Building
1 ECtiOr� rthampton, MA 01060
tr�.p
J. a
s ' trjY ��1
Electric.Fl!m� ���c 01060
tv�ortr4,-rhtc�� f
SINGLE OR TWO FAMILY SOLID FUEL APPLIANCE PERMIT APPLICATION
FOR WOOD, COAL, PELLET, CORN, STRAW OR SIMILAR STOVES, OR FIREPLACE INSERTS
Permit Fee: $25.00 Check# d3d
PLEASE TYPE OR PRINT ALL INFORMATION
f
1. Name of Applicant:�/e �r�E" ���e _�_< !J J(�/�J'' L Ab6c,�-.
Address: -S6�hc TO [�if�nYe(,4 6111, 0/093_ Telephone: V!
2. Owner of Property:
Address--, ��'=r rrUi2 �- �Cr>S A Telephone:
3. Status of Applicant: Owner (Contractor
4. Type or Brand of Stove: I1Arrn l'iJ -7z--7,00 — 6,)O(y i) 'LOVE- & Fu(( jr°/,ti fl K _
1--AC4,r tbrSG—" -1A fcI i1-� P'0
If applicant is not the homeowner:
Construction Supervisor's License Number t / Expiration Date
Home Improvement Contractor Registration Number /C-C`/.5 -0 Expiration Date
Ali Applicants must complete a Workers Compensation Insurance Affidavit before we can issue a permit
5. Certification: I hereby certify that the information contained herein is true and accurate to the best
of my kno ledge.
DATE: / 311 APPLICANT'S SIGNATUk �'�-'`_----
DATE: i I HOMEOWNER'S SIGNATUR
APPROVED
DATE: BUILDING OFFICIAL
36 RESERVOIR RD BP-2014-0864
GIs#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: IOB-052 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: woodstove BUILDING PERMIT
Permit# BP-2014-0864
Project# JS-2014-001514
Est. Cost:
Fee: $25.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: BERNARDSTON FARMERS SUPPLY 99401
Lot Size(sq. ft.): 42383.88 Owner: BARRETT WILLIAM F&SUSAN B C/O THOMAS D SILLIMAN
Zoning: URB(102)/WP(81)/RR(7) Applicant: BERNARDSTON FARMERS SUPPLY
AT. 36 RESERVOIR RD
Applicant Address: Phone: Insurance:
43 RIVER ST (413) 648-9311 O WC
BERNARDSTONMA01337 ISSUED ON:211012014 0:00:00
TO PERFORM THE FOLLOWING WORK.-INSTALL HARMAN TL300 WOODSTOVE
W/METALBESTOS CHIMNEY
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 2/10/2014 0:00:00 $25.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner