24B-067 (12) Exterior Lighting Efficacy: .® 6. All exterior building grounds luminaires that operate at greater than 10OW have minimum efficacy of 60 lumenlwatt. Exceptions: [� Lighting that has been claimed as exempt and is identified as such in Section 3 table above. �] Lighting that is specifically designated as required by a health or life safety statue,ordinance,or regulation. 0 Emergency lighting that is automatically off during normal building operation. © Lighting that is controlled by motion sensor. Section 5: Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2W9 IECC requirements in COMcheck Version 3.9.1 and to comply with the mandatory requirements in the Requirements Checklist. —:p gvtOTITtE �}ouSE tJRGEQ tc.n t�-t ►y Name-Title Si nature Date Project Title: Report date: Data filename:CAStrech-formlLIA-Kia.cck Page 2 of 2 COMcheck Software Version 3.9,1 Exterior Lighting Compliance Certificate 2049 iECC Section 1: Project Information Project Type:New Construction Project Title:LIA Kia dearlership Exterior Lighting Zone: 2(Light Industrial area with limited nighttime use) Construction Site: Owner/Agent Designer/Contractor: 263 Ming Street K Northampton,MA Section 2: Exterior Lighting Area/Surface Power Calculation A Q c D E F ExteriorArea/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage Watts Watts I Unit (B x C) Parking area 50000 ft2 0.06 Yes 3000 1800 Outdoor sales areaAot 2275 V 0.25 Yes 569 1500 Total Tradable Watts'= 3569 3300 Total Allowed Watts= 3568 Total Allowed Supplemental Watts""= 600 'Wattage Iradeoffs are only allowed between tradable areas/surlaces. "A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C D E Fixture ID:Description/tamp I Wattage Per Lamp!Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt: Parking area(50000 f12):Tradable Wattage HID 1:Metal Halide 150W I Pulse start 1 12 150 1800 Outdoor sales areallot(2275 ft2):Tradable Wattage HID 3.Metal Halide 250W/Pulse start 1 6 250 1500 Total Tradable Proposed Watts= 3300 Section 4: Requirements Checklist Lighting Wattage: 0 1. Within each non-tradable areatsurface,total proposed watts must be less than or equal to total allowed watts.Across all tradable areas/surfaces,total proposed watts must be less than or equal to total allowed watts. Compliance:Passes. Controls,Switching,and Wiring: 2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt Iighiing. 3. Lighting not designated for dusk-lo-dawn operation is controlled by either a a pholosensor(with time switch),or an astronomical time switch. 4. Lighting designated for dusk-to-dawn operation is controlled by an astronomical time switch or pholosensor. l�5. Ali time switches are capable of retaining programming and the time setting during loss of power for a period of at least 10 hours. Project Title: v Report date: Data filename:CftStrech-form`iLIA-Kia.cck Page 1 of 2 C] Areas designated as security or emergency areas that must be continuously illuminated. © Lighting iri stairways or corridors that are elements of the means of egress. 5. Master switch at entry to hotellmotal guest room. 6. Individual dwelling units separately metered. 7. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. B. Each space required to have a manual control also allows far reducing the connected lighting load by at least 50 percent by either controlling all luminaires,dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps.switching the middle lamp luminaires independent ly of other lamps,or switching each luminaire or each lamp. Exceptions: 0 Only one tuminalre in space. [] An occupant-sensing device controls the area. ri The area is a corridor,storeroom,restroom,public lobby or sleeping unit. Areas that use less than 0.6 Watts/sq.ft. 9. Automatic lighting shutoff control in buildings larger than 5,000 sqA. Exceptions. ❑ Sleeping units,patient care areas;and spaces where automatic shutoff would endanger safety or security. 10.Photocell/astronomical time switch on exterior tights. Exceptions. Lighting intended for 24 hour use. D' 11.Tandem wired one-lamp and three-tamp ballasted luminaires(No single-lamp ballasts). Exceptions: (] Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair. Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2009 IECC requirements iin�COMcheck Version 3.9.1 and to comply with the mandatory requirements in the Requirements Checklist. �AV1 fl 4-1TILAIJi E L i ll'V kh4 e..— ?/�W l:,f ,T `wvC�C / Z/�/Z.. Name-Title Sigriature Date Project Title:L1A Kia Deadership Report date: 11/20/12 Data filename:C;IStrech-ford IA-Kia.cck Page 2 of 4 COMcheck Software Version 3.9.1 Interior Lighting Compliance Certificate, 1 4 2009 IECC Section 1: Project Information Project Type:New Construction Project Title:LIA Ka Dearlership Construction Site: Owner/Agent Designer/Contractor 263 King Street Northampton,MA 4 Section 2: Interior Lighting and Power Calculation A B C D Area Category FloorArea Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Automotive Facility 10412 0.9 9371 Total Allowed Watts= 9371 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID:Description f Lamp I Wattage Per Lamp I Ballast L.ampsl 4 of Fixture (C K D) Fixture Fixtures Watt. Automotive Facility(10412 sq.fl.) Linear Fluorescent 2:46"T5 54W I Electronic 4 13 196 2548 Linear Fluorescent 3:46'T5 28W/Electronic 4 13 100 1300 Linear Fluorescent 4:46"T5 28W/Electronic 2 2 50 100 Linear Fluorescent 5:46"T5 28W I Electronic 3 63 75 4725 Total Proposed Watts= 8673 Section 4: Requirements Checklist Interior r PAS85S Design 7116 better than code. Lighting Wattage: 0 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 9371 8673 YES Controls,Switching,and Wiring: 2. Dayfightzones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. 3. Daylight zones have individual lighting controls independent from that of the general area lighting. Exceptions: © Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. 4. Independent controls For each space(switchloccupancy sensor). Exceptions: Project Tide:LIA Kia Dearlership V Report date:11120/12 Data filename:C:lStmch-Formll-A-Kia.eck Page 1 of 4 DEC-02-2012 12:22 PM BOB MACCARIhlI 141335253766'x -' P. O4 Name-Title SEgnaiure Date Sectlon 6: Post Construction Compliance Statement HVAC record drawtnge of the actual installation,eyetem capacities,cellbration information,and performance data for each equipment provided to the owner. HVAC 4&M documents toc all mechanical equipment and system provided to the owner by the mechanical contractor. Written HVAC baWicing and operatlohs report provided to the owner. The above post conetructlon requirements have been completed- Principal Machanlcat Daeigner--Neme Slgnahrre Date OF o� ROBERT t:. s MACCARINI " Ca ca HVAC r; MEW Pro)eat Tide, Northampton Ua Report data: 12/02/12 .ac-1 ," - -q\Windows\Tempor&ry intsmat Fi{esiContent.IF-M VZY5ZWortampton C file Received' Time x Dec. 2. 11 :40AM Pag e e3of6 at DEC-02---2012 12:22 PM BOB MACCARINI 14135253766 P. 03 R-8 insulation between ducts and the building exterior when ducts are part of a building assembly ExcepHon(s): Ducts located within equipment Ducts with Interior and exterior temperature difference not exceeding 15°F. Mechanical(eetenism and sealants used to connect ducts and air distribution equipment tj.8. Ducts aeebd-longitudinal seams on rigid ducts;transverse seams on all ducts;UL 181A or 181a tapes and mastics F-Caption(s): r,] Continuously welded and locking-type longitudinal Joints and seams an ducts opamiing at static pressures less than 2 Inches w.g. pressure classification d 4 4 10.Hot water pipe Insulation: 1,5 In.for pipes e-1-5 In.and 2 in,for pipes>1.5 In. Chilled waterlraNgerantRxlne pipe Insulation: 1.5 in.for pipes x=1.5 In.and 1.5 in.For pipes>1,6 in. Steam pipe Insulation, 1.5 in.far pipes<-1.51n.and 3 in,for pipes X1.6 In, Exceptlon(s): - Piping within HVAC equipment, Fluid temperatures between 55 and 105°F. Fluid not heated or cooled with renewable energy. Cj Piping within room fan-Coll(with AHRI440 rating)and unfit ventilators(with AHRI840 raling). L3 Runouta<4 ft In length. 9/1 1.Operation and maintenance manual provided to building owner Q 12,Thermostadc controls have S°F deadbond ExoepOon(s): f Thermostats requiring manual changeover between heating and cooling ❑ Special occupancy or special applications where wide temperature ranges are not acceptable and ere approved by the authority having Jurisdiction. d3.Balancing devices provided In accordance with IMC(2008)603.17 Li 14.Demand control ventilation(DCV)present for high design occupancy areas(5,40 peraoN1000 It2 in spaces>1500 ft2)and served by systems with any one of 1)an air-elde economizer,2)automatic modulating control of the outdoor air damper.or 3)a design outdoor airflow greater than 3000 cfm, Drceprlon(s): ❑ Sysiams with heat recovery, I j MuHlpfe-zone systems wtthout DDC of Individual zones communicating whh a central control panel. L) Systems with a design outdoor airflow less than 1200 ofm. U Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement Is leas than 1200 ctm. O 15.Motorized,automatic shutoff dampers required on exhaust and outdoor air supply openings Exoepfrcn(s): ' 2e Gravity dampers acceptable In buildings<3 stories 21*1 Gravity dampers acceptable In systems with outside or exhaust air flow rates less than 300 ofm where dampers are Interlocked with fen Q 16,Autometle controls for freeze proteodon systems present Q 17.Exhaust air heat recovery included for systems 6,000 cfm or greater with more than 70%outside air fraction or specifically exempted Excepdon(s). CJ Ha2srdous exhaust systems,commareial ktfc:han and clothes dryer exhaust systems that the Intematlonal Mechanical Code prohibits the use of energy recovery systems. ❑ systems serving spaces that are heated and not 000ted to less then 60°F. ❑ Where more than 60 percent of the outdoor heating energy is provided from sla-recovered or site solar energy. [� Hosting systems In cilmatos with less then 3600 HDD, [� Cooling systems In climates with a 1 percent cooling design wet-bulb temperature lose than 64°F, p Systems requldng dehumidification that employ energy recovery In series with the cooling wit. [] Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air volume to So percent or less of design values or,a separate make up air supply meeting the following makeup air requirements: a)at least 75 percent of exhaust flow rate,b)heated to no more than 2'F below room sstpoint temperature,c)cooled to no lower than 3°F above room setpoint temperature,d)no humidification added,e)no simultaneous heating and Ceding. Section S: Compliance Statement Compliance Stetemant: The proposed mechanical design represented In this document Is consistent with the building plans,specifications and other calcutettons submitted with this permit application.The proposed mechanical systems have been designed to most the 20091ECC requirements In COMcheck Version 3,91 and to comply with the mandatory requirements in the Requirements Checklist, Project Tide: Northampton Lla Report date: 12102f12 .. „ n..+ � Wlndaxaremporary internal Ftle \cortent.lE5'85avZYF�N m Data file i v e d ime° e c. 2. 11 M x e 2 g DEC-02-2812 12:21 PM DOS MACCARINI 14135253766 P. 02 ar� COMcheck Software Version 3.91 Mechanical Compliance Certificate 4 , 2009 IECC Section 1: Project information Project Type:Now CiorlatruotIon Project Title:Northampton Lis Construction Site: OwnerlAgent: DesignerlContr actor: King Street Bob Marcarinl R.E. Northampton,MA RCM Associates 348 Pinshurst Drive East Longmeadow,MA 01028 1-413427-1091 hveccolbobQyahoo.com Section 2: General Information Building Location(for weather data): Northampton,Massachusetts Climate Zone: Sa Section 3: Mechanical Systems List Q 11 1 HVAC System 1 (Single Zone). Heating;2 each-other,Ges,Capacity■130 kBtufh Cooling:2 each-Rooftop Package Unit,Capacity■90 kBtulh,Efficiency■1250 EER,Alr-Cooled Condenser, Alr Economizer 1 HVAC System 2(Unknown): Heating:4 each-Unit Hester,Gas.Capacity'100 Wtulh,Efficiency n 80.00%Ec Section 4: Requirements Checklist Reqtdr6mants Specific To: HVAC System 1 : Equiptment minimum efficiency: Rooftop Package Unh: 11.00 EER 56-- Integrated economizer is required for Ut6 location and system. Cooling system provides a means to rellove excess outdoor air during economizer operation. Requirements Specific To: HVAC System 2: 4(1. Equlpment minlmurn efficiency: Unit Heater(Gas); 80.00%Ec Generic Requirements:Must be met by all systems to which the requirement Is applicable: W1. Piant equipment and system capacity no greater than needed to meet loads aception(s): U Standby equipment automatically oft when primary system is operating [] Multiple Units oontrolled to sequence openedon as a lunation of load . Minimum one temperature control device par system 8. Minknum one Wmldtty control device per Installed humidi ieatlonldehumldif<catlon system Ord. Load calcufallone per ASHRAElACCA Standard 183. �5. Automatic Controls:Setback to 58 1F(heat)and 85T(cool);7-day clock,2-hour oa upartt ovaMde,1()-hour backup Excoptlon(s): V Continuously operating zones U 2 kW demand or less,submit calculations F, 8. Outside-air source for ventilation;system capable of reducing OSA to required minimum W7. R-S supply and return air duct insulation in unconditioned spaces R-8 supply and return air dud Insulation outside the building ............ Project Title;Northampton lie Report date: 12/02/12 .. . .�_..a�,..nu� .a WlndawstTempoWY Internet FlieslContenttE5ke$BVZYEZNorthempton Data��Received TimerDec. 2. Ii : OAi Pagel °re COMcheck Software Version 3.9.9 Mechanical Compliance Certificate 20091ECC Section 9: Project Information Project Type:New Construction Project Title:Lia Kia Construction Site: Owner/Agent: Designer/Contractor: 263 King Street Northampton,MA 01060 Section 2: General Information ' Building Location(for weather data): Northampton,Massachusetts Climate Zone: 5a Section 3: Mechanical Systems List Quantity System Type&Description 1 Water Heater 1:Gas Storage Water Heater,Capacity:40 gallons,Input Rating:40 Btu/h,Efficiency:0.65 EF Section 4: Requirements Checklist Requirements Specific To:Water Heater 1 : 0 1. Water heating equipment meets minimum efficiency requirements: Gas Storage Water Heater efficiency: 0.59 EF 0 2. First 8 It of outlet piping Is insulated 3. Hot water storage temperature controls that allow setpoint of 90°F for non-dwelling units and 110°F for dwelling units. 4. Heat traps provided on inlet and outlet of storage tanks Generic Requirements:Must be met by all systems to which the requirement is applicable: None Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2009 IECC requirements in COMcheckVersion 3.9.1 and to comply with the mandatory requirements in the Requirements Checklist. Name-Title Signature Date Section 6: Post Construction Compliance Statement E] HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment provided to the owner. 0 HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor- [] Written HVAC balancing and operations report provided to the owner. The above.post construction requirements have been completed. Principal Mechanical Designer-Name Signature Date Project Title: Lia Kia Report date: 12/17/12 Data filename:Untitled.cck Page 1 of 2 Comments:OVERHEAD SECTIONAL Door 4:Insulated Metal,Swinging 120 — 0.070 0.700 Floor 1:Slab-On-Grade:Unheated,Vertical 4 ft. 424 --- 10.0 -- -- (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. Air Leakage,Component Certification, and Vapor Retarder Requirements: ❑ 1. All joints and penetrations are caulked,gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance with the manufacturer's installation instructions. F-1 2. Windows,doors,and skylights certified as meeting leakage requirements. ❑ 3. Component R-values&U-factors labeled as certified. ❑ 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. ❑ 5. 'Other components have supporting documentation for proposed U-Factors. ❑ S. Insulation installed according to manufacturer's instructions,in substantial contact with the surface being insulated,and in a manner that achieves the rated R-value without compressing the insulation. ❑ 7. Stair,elevator shaft vents,and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. ❑ 8. Cargo doors and loading dock doors are weather sealed. ❑ 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283,are sealed with gasket or caulk. ❑ 10.13uilding entrance doors have a vestibule equipped with self-closing devices. Exceptions: ❑ Building entrances with revolving doors. ❑ Doors not intended to be used as a building entrance. ❑ Doors that open directly from a space less than 3000 sq.ft.in area. (j Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. ❑ Doors opening directly from a sleeping(dwelling unit. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.9.1 and to comply with the mandatory requirements in the Re4awirements Checklist. Name-Title — T Signatur ID Project Notes: THESE CALCULATIONS ARE BASED ON THE STRETCH CODE IECC 2009 WITH MASSACHUSETTS AMENDMENTS 780CMR 115.AA SECTION 501.2 PRESCIPTIVE OPTIONS Project Title: LIA KIA Report date: 10/10/12 Data filename:C:%Documents and Settings%sieg.FORISH1DesktoplKIA1LIA KIA STRETCH CODE PRESCIPTIVE OPTION.cck Page 2 of 2 COMcheck Software Version 3.9.1 Envelope compliance Certificate 2009 [ECC ' Section 1: Project Information Project Type:New Construction Project Title:LIA KIA Construction Site: OwnerlAgent: Designer/Contractor: 263 KING STREET WILLIAM LIA SIEGFRIED FORTH NORTHAMPTON,MA 01060 THE LIA GROUP FORISH CONSTRUCTION CO. KING ST. 21 MAW LINE DR. NORTHAMPTON,MA 01060 WESTFIELD,MA 01086 413 568 8624 Section 2: General Information Building Location(for weather data): Northampton,Massachusetts Climate Zone: 5a Building Type for Envelope Requirements: Non-Residential Vertical Glazing I Wall Area Pct.: 23% Activity Tvpe(sl Floor Area CAR SHOWROOM(Office) 5000 SERVICE GARAGE(Parking Garage) 4836 Section 3: Requirements Checklist Envelope Design Climate-Specific Requirements; Component Name/Description Gross cavity Cont. Proposed Budget Area or R-Value R-Value 13-Factor U-Factortal Perimeter Roof 1:Insulation Entirely Above Deck 9836 25.0 0.039 0.048 Comments:TOTAL ROOF AREA Exterior Wall 1:Steel-Framed,16"o.c. 2204 19.D 7.5 0.060 0.064 Comments:METAL COMP.PANEL FINISH Window 1:Metal Frame Curtain Wall/Storefront:Double Pane with 1252 -- 0.320 0.450 Low-E,Clear,SHGC 032 Exterior Wall 2:Steel-Framed, 16"o.c, 2966 19.D 7.5 0.060 0.064 Comments:EFIS FINISH Window 2:Metal Frame Curtain Wall/Storefront:Double Pane with 693 --- 0.320 0.450 Low-E,Clear,SHGC 0.32 Exterior Wall 3:Metal Building Wall 2610 19.0 5.6 0.050 0.069 Comments:TOP OF KICK WALL TO EAVE Window 3:Metal Frame Curtain Wall/Storefront:Double Pane with 16 — -- 0.320 0.450 Low-E,Clear,SHGC 032 Door 1:Insulated Metal,Non-Swinging 435 --- 0.070 0.500 Comments:OVERHEAD SECTIONAL Door 3:Insulated Metal,Swinging 50 --- --- 0.070 0.700 Exterior Wall 4.Concrete Block:8",Unreinforced,Cells 720 --- 7.7 0.071 0.090 Insulated,Light Density,Furring:None Comments:4'HIGH CORES INSULATED Door 2:Insulated Metal,Non-Swinging 294 --- --- 0.070 0.500 Project Title: LIA KIA Report date: 10/10112 Data filename:C:IDocuments and Settings\sieg.FORISH\Desktop\KIA\LIA KIA STRETCH CODE PRESCIPTIVE OPTION,cck Page 1 of 2