23B-046 (168) 6. Ed asked that the Contractor obtain a letter and the appropriate paperwork from Allied Testing regarding the controlled fill placement and testing. 7. Dick Aquadro will prepare new paperwork for the exterior gate valve changes. 8. The project completion date is still scheduled for August 1 , 1995 . The General Contractor needs to confirm this date. 9. The tentative date for the renovations in Nancy King 's office needs to be determined by the General Contractor . END OF MEETING Respectfully submitted, HEALTHCARE CHITECTS INC. i Edward Je! dr , A. A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 4P March 22, 1995 L...........A CONSTRUCTION MEETING NO. 1 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Un i t Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton, Massachusetts ROY & Brown AS1 ldword L JmdryAlA. Those Present SENIOR PRINCO'AIS C. J. Vhtb= Ernest Margeson Cooley Dickinson Hospital PMCD'ALS Scott Johnson Cooley Dickinson Hospital MutTrunn... Don Spear Cooley Dickinson Hospital D= s, -i-am-e-s Aldrich Cooley Dickinson Hospital AM W02M Nancy King Cooley Dickinson Hospital PiWa"dP. Wk Richard Aquadro Aquadro & Cerruti , Inc. ENGINEERING ASSOCIATES Edward L. Jendry Healthcare Architects Inc. VM18= u. B"".P.E. xooa1d G. 9ta1vndYJL Issues Discussed 1. Ed asked that the elevator installer come to --- -- -- - -------the next • meeting --tu discuss the Elevator Contractor reviewing the Plans with the local Elevator Inspector at this point to prevent any possible concerns . Ernie will contact the elevator company. 2. Ernie explained that there was an incident involving the Contractor 's sawcutting machine which was left overnight in the building leaking gasoline inside the building . The gasoline fumes affected patients and infants in the Maternity Unit on one of the floors above. Ernie would like to set up procedures and policies with the General Contractor to avert problems like this in the future. 3. Ed asked if the Sprinkler Contractor would attend the next meeting to discuss sprinkler clearance above the new mobile shelving. 4. Dick Aquadro explained that the elevator footing will be poured today and that the elevator foundation walls will be formed tomorrow. 5. The perimeter drains have been determined to be "dead" and full of sand; therefore the remnants of these drains will remain. 1 of 2 64 COMC MM= / NOSRfiUDMN. NASBaMUSni9 01060 (418) 666-1612 8. The Elevator Equipment Room door will be required to be a lockset . END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. E ward L *ndr I. I . ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 March 29, 1995 CONSTRUCTION MEETING NO. 2 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton , Massachusetts Roy & BrOWS A.I.& Zdwwd L J.ndryA.IJ. Those Present SENIOR PRINCIPALS C. J. Ernest Margeson Cooley Dickinson Hospital PRINCIPAW Scott Johnson Cooley Dickinson Hospital xwk r Dun At. Don Spear Cooley Dickinson Hospital Don -dam-e-s-Aldrich Cooley Dickinson Hospital A"1v,ao. Nancy King Cooley Dickinson Hospital "dp• WU` Chip Stokes H.F.P. , Inc. LNGngMa QG ASSOCIATES Paul Hasbruck Payne Elevator Company wmiSM X bampm Tom Podd Payne Elevator Company a1$ G' 'm''md'ps George Hansen Aquadro & Cerruti , Inc. Richard Aquadro Aquadro & Cerruti , Inc. Edward L. Jendry Healthcare Architects Inc. Issues Discussed 1. Ed asked that the Contractor obtain a letter and the appropriate paperwork from Allied Testing regarding the controlled fill placement and testing. 2. Dick Aquadro will prepare new paperwork for the exterior gate valve changes . 3. The tentative date for the renovations in Nancy King 's office will be in approximately five (5) weeks. 4. The Sprinkler Contractor will get back to all parties relative to sprinkler clearances in the Radiology Records Room. 5. Ed will give Dick a sketch for pricing the proposed change to the exterior existing stairs . 6. The emergency power feed to the elevator needs to be resolved with the City. 7. The elevator installer 's needs were discussed at the meeting with all parties . 1 of 2 154 GOMC aiBSET / N0279AW UPON. YAMACRi1SEM 01080 (413) 15815-11512 A � 0 3-8. The Elevator Equipment Room door will be required to be a lockset . 3-9. The Hospital will supply the paper towel dispensers and soap dispensers for the project . 3-10. Ernie asked for some added sound insulation near the physicians ' office. Ernie will supply the insulation. 3-11. The question of window cleaning by the Hospital 's window cleaning company inside the work area was discussed. The decision was made not to allow the window cleaning company inside the work area. 3-12. The louver with glass for the elevator hoistway was approved as per Dick Aquadro sketch dated April 4, 1995. 3-13. The Hospital would like to install the second skylight in the C.T. Room under the Alternate in the bid . The Hospital will post signs on the roof for radiation protection. 3-14. The Hospital will decide on whether or not they would like to use the Data Air H.V.A.C. unit for the C . T. Room as proposed by the H.V.A.C. Subcontractor . END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. E ward �Je d ,; A. I .A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 April 5, 1995 CONSTRUCTION MEETING NO. 3 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital CORPORATE DUMMOR9 Northampton , Massachusetts Boy & Bram A.I.A. sdwwd L J.odry *• Those Present SENIOR PMCLPAL9 C. J. Vh""" Ernest Margeson Cooley Dickinson Hospital PRWCIPAIS Scott Johnson Cooley Dickinson Hospital Xwt T. DannAlA Don Spear Cooley Dickinson Hospital Dm _ -"Ptitch-Kowalski Cooley Dickinson Hospital Katemme AMl..rrna. Kim= George Hansen Aquadro & Cerruti , Inc. RiWuwd P. VM Richard Aquadro Aquadro & Cerruti , Inc. ErNGUMOMG A89oc=zs Edward L . Jendry Healthcare Architects Inc. VMW= x. s nr p x xkeeId G. 9tauhmd.PX Issues Discussed 3-1. Ed asked that the Contractor obtain a and the appropriate paperwork from Allied Testing regarding the controlled fill placement and testing. 3-2. Dick Aquadro will prepare new paperwork for the exterior gate valve changes . 3-3. The tentative date for the renovations in Nancy King 's office will be in approximately five (5) weeks. 3-4. The Sprinkler Contractor will get back to all parties relative to sprinkler clearances in the Radiology Records Room. 3-5. Ed will give Dick a sketch for pricing the proposed change to the exterior existing stairs. 3-6. The emergency power feed to the elevator needs to be resolved with the City. Ed will set up a meeting. 3-7. The elevator installer ' s needs were discussed at the meeting with all parties . Ernie will call Paul from Payne Elevator relative to this issue. 1 of 2 e{ GMWC Vr== / NORTHAMP M. MASaCOMM 01080 (419) 566-1512 v 4-7. Structural steel should arrive April 24, 1995. 4-8 . The high density shelving information was received by the General Contractor. 4-9. Dick Moran will check into wall boxes for the future Lithotripter water and sewer connections. 4-10. Dick Moran will check into whether or not the Plumbing Inspector is going to require a trap primer on the trap from the van unit . END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. 1 E ar ndr A. I A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 -AAAi April 12, 1995 CONSTRUCTION MEETING NO. 4 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton , Massachusetts Roy s. Bron.A.I.A. sdn'rd L JondryAJ.L Those Present SENIOR PRINCIPALS Q J. Vb1Lbam Nancy King Cooley Dickinson Hospital PMCEPAls Scott Johnson Cooley Dickinson Hospital Xm* T. „unnA,. Don Spear Cooley Dickinson Hospital Don ashard X Nat ano. Mitch Kowalski Cooley Dickinson Hospital Am lawi+noa Eaaz Dick Moran M.J. Moran Rionard P. Vnk George Hansen Aquadro & Cerruti , Inc. zNGIImcmG AwocuTEs Richard Aquadro Aquadro & Cerruti , Inc. ■m1+m IL Rarrrp.X Edward L. Jendry Healthcare Architects Inc. Ronald G. 9trnlund.PX Issues Discussed -- 4-1. - -Ed-- asked---n-at the Contractor obtain a letter and the appropriate paperwork from Allied Testing regarding the controlled fill placement and testing. 4-2. The Sprinkler Contractor will get back to all parties relative to sprinkler clearances in the Radiology Records Room. 4-3. Ed will give Dick a sketch for pricing the proposed change to the exterior existing stairs. 4-4. The emergency power feed to the elevator needs to be resolved with the City. Ed will set up a meeting. 4-5. The Hospital would like to install the second skylight in the C.T. Room under the Alternate in the bid . The Hospital will post signs on the roof for r a d i a t i o n protection. 4-6. The Hospital will decide on whether or not they would like to use the Data Air H.V.A.C. unit for the C . T. Room as proposed by the H.V.A.C. Subcontractor . 1 of 2 64 GOMC MW= / NORYEAWMX, ULSUCHUMM 01060 (415) 5e5-1512 4/i • 5-8. Jim Moran will check into whether or not the Plumbing Inspector is going to require a trap primer on the trap from the van unit. 5-9. Dick Aquadro will forward the insurance information that is needed to Karen Nelson at the Hospital. 5-10. Ernie Margeson will contact M.D. I. about any input they want to give relative to the M.R. I. pad. 5-11. The revised steel shop drawings were returned to the Contractor. END OF MEETING Respectfully submitted, HEA THCARE ARCHITECTS INC. Edward L. Jendry, A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 • A-] April 19, 1995 CONSTRUCTION MEETING NO. 5 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Un i t Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton , Massachusetts 807 & 8mmnAT Z4WWd L Jiodr'AJ.A' Those Present SMOR PENCIPALS CJ. VMfLam Scott Johnson Cooley Dickinson Hospital PENCIPAIS Don Spear Cooley Dickinson Hospital Kok lDWMAI Mitch Kowalski Cooley Dickinson Hospital >= a.m. Deborah Simmons Cooley Dickinson Hospital Aiavro m En= Chad Moran M.J. Moran >RSaea:dP. W` George Hansen Aquadro & Cerruti , Inc. ENGnMEMG AMOCUTES Richard Aquadro Aquadro & Cerruti , Inc. VMM= 3L sarra Edward L. Jendry Healthcare Architects Inc. Ronald Co. 8tan1umd.PA Issues Discussed "5-1.--___ E d asked .t-h a t,-_the ---C-o n t-r a ct o r—o bt-a-i Yr-- a- -- - - - letter and the appropriate paperwork from Allied Testing regarding the controlled fill placement and testing. 5-2. The Sprinkler Contractor will get back to all parties relative to sprinkler clearances in the Radiology Records Room. 5-3. Ed will give Dick a sketch for pricing the proposed change to the exterior existing stairs. 5-4. The emergency power feed to the elevator needs to be resolved with the City. Ed will set up a meeting. 5-5. The Hospital will decide on whether or not they would like to use the Data Air H.V.A.C. unit for the C .T. Room as proposed by the H.V.A.C. Subcontractor . 5-6. Structural steel should arrive at or about the end of the month. 5-7. Jim Moran will check into wall boxes for the future Lithotripter water and sewer connections. 1 of 2 e4 GWMC MWZr / NOWMAWWN. Yv8►C8ltJ8Em oloso (419) 505-1512 a 6-8. George brought up the issue of the smoke detectors at the elevator landings now being required to be connected to the elevator controller. END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. war Jen ry, ELJ/acp Discussions of this meeting have been recorded as understood by the writer . Please notify the writer immediately of any omissions or corrections. 2 of 2 r i • April 26, 1995 CONSTRUCTION MEETING NO. 6 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Un i t Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton , Massachusetts sa..ra L J.oaryAAA. Those Present SMOR PMCIPAW C. J. VbUbam _ Ernest Margeson Cooley Dickinson Hospital PRwaIPAS Scott Johnson Cooley Dickinson Hospital Don Spear Cooley Dickinson Hospital D=BMW Mitch Kowalski Cooley Dickinson Hospital ,. Curt Peters Cooley Dickinson Hospital Tikhwd F. VM Chad Moran M.J. Moran ENGIInM=G AMOCIATES George Hansen Aquadro & Cerruti , Inc. VMIAM X HaMpa, Richard Aquadro Aquadro & Cerruti , Inc. Bomvd G. 8eWund.P.L Edward L. Jendry Healthcare Architects Inc. Issues Discussed 6-1. The Sprinkler Contractor will get back to all parties relative to sprinkler clearances in the Radiology Records Room. 6-2. Ed will give Dick a sketch for pricing the proposed change to the exterior existing stairs. 6-3. The emergency power feed to the elevator needs to be resolved with the City. Ed will set up a meeting. 6-4. The Hospital will decide on whether or not they would like to use the Data Air H.V.A.C. unit for the C . T. Room as proposed by the H.V.A.C. Subcontractor . 6-5. Mitch Kowalski brought up the need for a double feed for C . T. units , existing and new. 6-6. Ernie Margeson will contact M.D. I . about any input they want to give relative to the M.R. I . pad. 6-7. Ed will process the louver drawings for Dick Aquadro. 1 of 2 e4 comic dear / NOWnUWP ox. MANAMUnTM 01060 (419) 686-1512 7-8. The break-through into Nancy King ' s office will be necessary in a few weeks . This will be coordinated between the Hospital and the General Contractor. 7-9. The General Contractor ' s Requisition was processed. 7-10. A decision was made on the operable panels for the sliding doors. END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. E�fd L. en y, ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 May 3, 1995 CONSTRUCTION MEETING NO. 7 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital cosPOPJM DIRECTORS Northampton, Massachusetts Z" a Hro.m.S.L. ZdWWd L ja dryAlA. Those Present RMOR PER CMAW C.J. W-kv*-u Ernest Margeson Cooley Dickinson Hospital pm,�y Scott Johnson Cooley Dickinson Hospital Don Spear Cooley Dickinson Hospital a�ms■m� Mitch Kowalski Cooley Dickinson Hospital AXM ,:na. Deborah Simmons Cooley Dickinson Hospital XkhWd P. VM Chad Moran M.J. Moran ENGIIImmr, AMOCUTES Richard Aquadro Aquadro & Cerruti , Inc. Vm1a= IL bw".P L Edward L. Jendry Healthcare Architects Inc. Aemadd G. 8bnhUWX.L Issues Discussed 7-1. The Sprinkler Contractor will get -b-ack- to all parties relative to sprinkler clearances in the Radiology Records Room. 7-2. Ed will give Dick a sketch for pricing the proposed change to the existing exterior fire exit stairs once a decision is made by the Hospital. 7-3. The emergency power feed issue is under advisement with the City. 7-4. Ernie Margeson will contact M.D. I . about any input they want to give relative to the M.R. I . pad. 7-5. Ed asked for the roofing submittals and the overhead door submittal. 7-6. George brought up the issue of the smoke detectors at the elevator landings now being required to be connected to the elevator controller. Ed will get Mitch a copy of the wiring schematic. 7-7. The structural steel should be erected this weekend. 1 of 2 64 GO MC ZW= / NOSfUWMN. MMUZUM T8 01060 (413) 806-1512 c 8-8. The break-through into Nancy King 's office will be necessary in a few weeks. This will be coordinated between the Hospital and the General Contractor. 8-9. Mitch will talk to Charlie from M.L. Schmidt about changing the exit signs to L.E.D. exit lights. 8-10. Ernie Margeson will contact Ed Bottomley regarding a color for the radiator covers . END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. Edward L. J ndr , I .A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer . Please notify the writer immediately of any omissions or corrections. 2 of 2 \ May 10, 1995 CONSTRUCTION MEETING NO. 8 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Un i t Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton , Massachusetts U S. L�A" Those Present SENIOR PRINCIPALS C. J. VWU2 m Ernest Margeson Cooley Dickinson Hospital Scott Johnson Cooley Dickinson Hospital XWkIr. Ats Don Spear. Cooley Dickinson Hospital �`T D°''�T`Rafter � om teer itcIiowa1ski Cooley Dickinson Hospital BbdMurd IL �KatoM Curt Peterson Cooley Dickinson Hospital A= 1AA0 11ohard P. YUk Jim Montgomery M.L. Schmidt ENGWEEIMG ASSOCIATES Chad Moran M.J. Mora n V=n= IL ewTy.P.& Richard Aquadro Aquadro & Cerruti , Inc. Ronald G. 9tonaund.B.L Edward L. Jendry Healthcare Architects Inc. Issues Discussed 8-1. The Sprinkler Contractor will get back to all parties relative to sprinkler clearances in the Radiology Records Room. 8-2. Ed will give Dick a sketch for pricing the proposed change to the existing exterior fire exit stairs once a decision is made by the Hospital . 8-3. The emergency power feed issue is under advisement with the City. 8-4. Ernie Margeson will contact M.D. I . about any input they want to give relative to the M.R. I . pad. 8-5. Ed asked for the roofing submittals. 8-6. George brought up the issue of the smoke detectors at the elevator landings now being required to be connected to the elevator controller. Ed will get Mitch a copy of the wiring schematic. 8-7. Ed forwarded a copy of the Contractor ' s price for the elevator hoistway smoke detector for the Hospital to consider. 1 of 2 64 GOMC MW= / NORT--,''!,JPMN. YASBAM'SEZ19 01060 (433) 586-1512 r 9-8. The break-through into Nancy King 's office will be necessary in a few weeks. This will be coordinated between the Hospital and the General Contractor . 9-9. The exit signs will be changed to L.E.D. units at no extra cost. 9-10. The radiator covers will be ordered with a prime finish (Beige Primer ) . The covers will then be sprayed on the site with a Polymix finish . 9-11. Ernie will contact the elevator company regarding the elevator status. END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. Edward L J dr , .A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 Ma y " 17 1995 CONSTRUCTION MEETING NO. 9 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Un i t Cooley Dickinson Hospital CORPORATE DMCORS Northampton , Massachusetts Roy S. HeawnAl-k Rdward 1- JdndrYAj-1L Those Present SENIOR PRINCIPAW C. J. TWUMM Ernest Margeson Cooley Dickinson Hospital PMCIPAIS Scott Johnson Cooley Dickinson Hospital ]lark T. n �Al. Mitch Kowalski Cooley Dickinson Hospital D= a ® Curt Peterson Cooley Dickinson Hospital Imobard X Ann „oa Nancy King Cooley Dickinson Hospital PAaba'dp• Wk Chad Moran M.J. Moran ENGDUMWG AWOMATES Richard Aquadro Aquadro & Cerruti , Inc. vm1am 3L Han7.PX. Edward L. Jendry Healthcare Architects Inc. Ronald G. Stenlund.?X. Issues Discussed 9-1. The Sprinkler Contractor will get back to all parties relative to sprinkler clearances in the Radiology Records Room with regards to Factory Mutual 's input . 9-2. Dick Aquadro gave three ( 3) options in regard to the removal of the exit stairs : 1. Option 1 : $1,442.00 2. Option 2 : $ 876.00 3. Option 3 : $ 653. 00 9-3. The emergency power feed issue is under advisement with the City. 9-4. Ernie Margeson will contact M.D. I . about any input they want to give relative to the M.R-. I . pad. 9-5. Ed asked for the roofing submittals. 9-6. George brought up the issue of the smoke detectors at the elevator landings now being required to be connected to the elevator controller. Ed will get Mitch a copy of the wiring schematic. 9-7. The Hospital will install the smoke detector in the hoistway. 1 of 2 64 =WC MW= / Norn"U oN. MASa&CM== 01060 (419) 686-1512 10-7. The movable shelving system was changed to 88" high to allow for three (3) additional inches between the top of the shelving and the ceiling. 10-8. The ductwork layout will be revised with Ron Stenlund to allow for ductwork clearances . Ed will have Ron Stenlund call Jon Pedersen regarding the duct layout problems. END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. L.��er d i ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 May 23, 1995 CONSTRUCTION MEETING NO. 10 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton , Massachusetts Boy S. Sevwn.Al.& Zd"`rd L J'°'e1uAJ-L Those Present SMOR PRINCIPALS C. J. VWtbam Ernest Margeson Cooley Dickinson Hospital PRiaFAS Scott Johnson Cooley Dickinson Hospital Xmmt T.MunnAIJL Mitch Kowalski _ Cooley Dickinson Hospital D= Hato Curt Peterson Cooley Dickinson Hospital A=la Mm� Nancy King Cooley Dickinson Hospital ldahwd P. TM Don Spear Cooley Dickinson Hospital IINGIIM0WG ASSOCIATES Jon Pedersen Berkshire Trane > VMIUm IL HuryP.L Chad Moran M.J. Mora n Ronald G. Stenitin&PS. Richard Aquadro Aquadro & Cerruti , Inc. Edward L. Jendry Healthcare Architects Inc. Issues Discussed 10-1. Factory Mutual has requested double the number of heads for the shelving area. 10-2. Dick Aquadro gave three ( 3) options in regard to the removal of the exit stairs : 1. Option 1 : $1,442. 00 2. Option 2: $ 876. 00 3. Option 3 : $ 653. 00 10-3. The emergency power feed issue is under advisement with the City. 10-4. There will be a meeting with M.D. I . on May 30, 1995, with Ernie and Ed. 10-5. The break-through into Nancy King ' s office will be necessary in a few weeks . This will be coordinated between the Hospital and the General Contractor . 10-6. Ed suggested a meeting with Factory Mutual; Ernie will arrange this meeting. 1 of 2 04 G(=C WZj= / NOR—,_v;,4 MX. XLS& S8 r=M 01060 (413) 686-1512 J ` 11-7. The General Contractor ' s Requisition was processed and approved. END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. E and dry A. A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 May 31, 1995 CONSTRUCTION MEETING NO. 11 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Un i t Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton , Massachusetts Roy S. HtownA." 1d"`� L iiodt''�� Those Present SENIOR PRINCIPALS C. 1• Vb-tb&= Ernest Margeson Cooley Dickinson Hospital PMNCIPALS Mark Hendrix Cooley Dickinson Hospital c T Du„^.t. Mitch Kowalski Cooley Dickinson Hospital D= a.tna Kurt Peterson Cooley Dickinson Hospital .:ma. Don Spear Cooley Dickinson Hospital R'oDard P. VM Jon Peterson Berkshire Trane ENGINEERING ASSOCIATES Chad Moran M.J. Moran VMI*= Y. s.rry,e.s. Richard Aquadro Aquadro & Cerruti , Inc. Ronald G. 8caminnd.P.L Edward L. Jendry Healthcare Architects Inc. Issues Discussed 11-1. The Sprinkler Contractor will provide a price update for the additional sprinkler heads over the shelving. 11-2. Dick Aquadro gave three ( 3) options in regard to the removal of the exit stairs : 1. Option 1 : $1,442. 00 2. Option 2: $ 876. 00 3. Option 3 : $ 653. 00 11-3. The emergency power feed issue is under advisement with the City. 11-4. There will be a meeting on Friday at 11:00 a .m. with M.D. I . 11-5. The break-through into Nancy King 's office will be necessary in a few weeks. This will be coordinated between the Hospital and the General Contractor . 11-6. Ed will get a color sample on the corner guards for Dick Aquadro. 1 of 2 64 CAMIC MW= / NOMEUMMN. ULSBU2 UMMS 01060 (419) 666-1512 C. All medical gas work for this project , unless the Alternate to have the Contractor complete the medical gas work is accepted. 12-6. Jim Moran will try to reuse Hospital sinks if possible; Jim Moran will check with Scott. 12-7. The Med. Red Unit shelf will be eliminated and new electrical conduit will be run. 12-8. Dick Aquadro will check into the projected finish date for the project in terms of coordination with the Department of Public Health. 12-9. The Hospital wants to relocate the oxygen line . The General Contractor will help coordinate this work with the Hospital. 12-10. Nancy wi 11 move out of her off ice this weekend. 12-11. The Hospital would like to add three (3) lockers down in the existing window opening in Toilet Room 18. Dick Aquadro will advise in terms of cost implications . END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. ward en y, A I .A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 3 of 3 f 1. Owner-Furnished and Installed Items for This Project : a. Signage b. Curtains and blinds. C. Telephone systems; the Contractor , however, will be required to furnish and install boxes and conduit as shown in the Contract Documents. d. Relocation of the existing air- cooled condenser for the current C.T. area. e. All asbestos removal (if required) . f. Nurse call system; however the Contractor will be required to furnish and install boxes and conduit as shown on the Contract Drawings . g. Removal and relocation of existing road gates and road signage. h . I .V. tracks, ceiling-mounted. 2. Owner-Furnished and Contractor-Relocated and Installed Items : a. Existing C.T. Scan X-ray window to be relocated. b. Existing M.R. I . air bag to be relocated, including ducting and accessories. 3. Owner-Furnished/Contractor-Installed Items : a. Locker units. b. X-ray film view boxes . 4. Work to be Completed by the Hospital: a. All core drilling of the concrete slabs to accommodate the new plumbing piping, heating, venti- lating and air conditioning lines and electrical conduits. b. All painting for this project, unless the Alternate to have the Contractor complete the painting is accepted. 2 of 3 June 7, 1995 CONSTRUCTION MEETING NO. 12 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital coMPoxATE DMEcroxS Northampton , Massachusetts U a;.: L JOU427,L" Those Present sarnox PxuacmALs J. R Q nita.m Ernest Margeson Cooley Dickinson Hospital Mitch Kowalski Cooley Dickinson Hospital PWCIPAs Kurt Peterson Cooley Dickinson Hospital � Tng&n n�►a►*A D-o-n -Sp-e-r Cooley Dickinson Hospital 350bard a K4101n ' Jim Montgomery M.L. Schmitt, Inc. PAWMwdP.r VUk Jim Moran M.J. Moran NGIId Richard Aquadro Aquadro & Cerruti , 3:NGW SERIIQG essOCL►TES Inc. IEdward L. Jendry Healthcare Architects Inc. E �pa 8oaald G. 9t4=1und.P.t Issues Discussed 12-1. Dick Aquadro gave three (3) options in regard to the removal of the exit stairs : 1. Option 1 : $1,442.00 2. Option 2 : $ 876.00 3. Option 3: $ 653. 00 12-2. The emergency power feed issue is under advisement with the City. 12-3. It was decided that the future processor should be stubbed for electrical services and mechanical services in the wall with an access panel . 12-4. The electrical feeds will be run over to the addition this next week . 12-5. The Hospital ' s responsibilities in terms of work on the project was discussed. Ed read the Summary of Work Section 01010 as follows : 1.01B. The General Contractor shall be responsible for furnishing all supplies and labor for the completion of the project with the following exceptions : 1 of 3 64 OOTMc srs= / NOSrAMPTON. MASSACHMEM 01060 (433) 565-1512 Respectfully submitted, HEALTHCARE ARCHITECTS INC. war L. J ndr EL J/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 3 of 3 13-7. The Hospital would like to add three (3) lockers down in the existing window opening in Toilet Room 18. Dick Aquadro will advise in terms of cost implications . 13-8. Ed will ask M. D. I . about the concrete pad one more time. 13-9. The raised computer floor in the C . T . Equipment Room is on hold for now. 13-10. The dimensional size of the C.T. Room was discussed in terms of the Equipment Room size and the machine location. 13-11. The possibility of running a soffit around the C.T. Room to allow the ductwork to be run effectively into the room was discussed. 13-12. Ed will provide a sketch on the relocated radiation units and the relocated fresh air intake . Ed will check with Ron about eliminating the second piece of radiation. 13-13. The Hospital would like to keep the existing electrical panel in the C . T . Room and install the new electrical panel in the Basement area . 13-14. The Hospital selected the vinyl tiles on the colorboard versus the tiles specified in the Contract. 13-15. The carpet is acceptable. 13-16. The Hospital would like the following: Blue Lagoon CB-92: For Blue Rooms Beige CB-49: For Beige Rooms For Carpet Areas END OF MEETING 2 of 3 June 14, 1995 CONSTRUCTION MEETING NO. 13 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton, Massachusetts MY & HrowaA.L,L Zd*ard L JendryAJ.L Those Present SENIOR PMCIPAIS C. I. Vhiusam Ernest Margeson Cooley Dickinson Hospital Mitch Kowalski Cooley Dickinson Hospital ��' XWk Ir. n Kurt Peterson Cooley Dickinson Hospital �.r. Dom Rafter --Dorf-Spear Cooley Dickinson Hospital y a Scott Johnson Cooley Dickinson Hospital Ann lkbwd P. Wk Donna King Cooley Dickinson Hospital ENGIIQSERNG ASSOCIATES Nancy King Cooley Dickinson Hospital Vmlem 3L Barry.PJL Chad Moran M.J. Mora n Ronald G. 9reffi,u►4PS. Richard Aquadro Aquadro & Cerruti , Inc. Edward L. Jendry Healthcare Architects Inc. Issues Discussed 13-1. Dick Aquadro gave three ( 3) options in regard to the removal of the exit stairs : 1. Option 1 : $1,442. 00 2. Option 2: $ 876. 00 3. Option 3 : $ 653. 00 13-2. The emergency power feed issue is under advisement with the City. 13-3. It was decided that the future processor should be stubbed for electrical services and mechanical services in the wall with an access panel . 13-4. Jim- Moran will try to reuse Hospital sinks if possible ; Jim Moran will check with Scott. 13-5. The Med. RAD Unit shelf will be eliminated and new electrical conduit will be run. 13-6. Dick Aquadro will check into the projected finish date for the project in terms of coordination with the Department of Public Health. 1 of 3 64 C07MC ffn=7 / NORf AWMN. MASBACHUSE'P9 01060 (419) 696-1532 _____I'_" , , i 14-16. A 2" conduit needs to be run between the two (2) G.E. pieces of equipment . END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. Edward L. Je dry, A. . ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 3 of 3 • • 14-7. The raised computer floor in the C . T . Equipment Room has been eliminated . G . E . requested the conduits be stubbed as per their directions . 14-8 . Ed will provide a sketch on the relocated radiation units and the relocated fresh air intake . Ed will check with Ron about eliminating the second piece of radiation. 14-9. The Hospital would like to keep the existing electrical panel in the C . T . Room and install the new electrical panel in the Basement area . 14-10. The Hospital selected the vinyl tiles on the colorboard versus the tiles specified in the Contract . 14-11. The Hospital would like the following for the vinyl base: Blue Lagoon CB-92: For Blue Rooms Beige CB-49: For Beige Rooms For Carpet Areas 14-12. The vinyl floor tiles selected for the project are the following: a. Armstrong (51858 Sandrift White) b. Armstrong (51916 Dutch Delft) C. Armstrong (51901 Taupe) 14-13. The carpet shown on the colorboard and as submitted by the Contractor is identical and is approved by the Hospital. 14-14. The Hospital will have the Contractor install sprayed fireproofing on the exposed steel bar joists that were discovered in Nancy 's office. 14-15. The G. E . installation will take three (3) weeks according to G.E. 2 of 3 June 21, 1995 CONSTRUCTION MEETING NO. 14 ARCHITECTS INC. New Addition and M.R. I . Un i t Cooley Dickinson Hospital DIRECTORS Northampton , Massachusetts Ray & Brown. A r. Edward L ]andry. ♦t e Those Present PMCIPAI- C. i• Th"ImIn Ernest Margeson Cooley Dickinson Hospital SENIOR AMCILTM Mitch Kowalski Cooley Dickinson Hospital FAchard = E,taa Kurt Peterson Cooley Dickinson Hospital AssoawTy Don Spear Cooley Dickinson Hospital ]lark T pumn. Ate. Scott Johnson Cooley Dickinson Hospital non sat,.r Donna King Cooley Dickinson Hospital A=Iawraw» ISnCZ Nancy King Cooley Dickinson Hospital Bob Herfurth Cooley Dickinson Hospital Larry General Electric Chad Moran M.J. Moran Richard Aquadro Aquadro & Cerruti , Inc. Edward L. Jendry Healthcare Architects Inc. Issues Discussed 14-1. Ernie asked that the stairs be removed at this point. 14-2. The Med. RAD Unit shelf will be relocated to the C.T. Room. 14-3. Dick Aquadro will check into the projected finish date for the project in terms of coordination with the Department of Public Health . 14-4. Ed will ask M. D. I . about the concrete pad one more time. 14-5. Ed will prepare a sketch for the Contractor for the floor tile design . 14-6. A decision was made to install a French drain with a cover to the M.R. I . van. Out of his own generosity, the Contractor will install the concrete drain at no additional cost . The Hospital will make the drain cover . 1 of 3 64 OOMC almsar / NORnUMPM. ULSOUNUSUM OIOW (413) e84-?M 15-8. The light fixtures for the C.T. control area will be changed to ( 4 ) 2 ' x 2 ' light fixtures with a dimmer switch. END OF MEETING Respectfully submitted, 'E ALTHCARE ARCHITECTS INC. Edward Jendr , A. .A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 June 28, 1995 CONSTRUCTION MEETING NO. 15 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital CORPORATE DrFMCrORS Northampton , Massachusetts Roy S. Brown Ali, Zdaard L JandrYA r A Those Present SMOR PRWCIPAM Q '• "hfth&M Ernest Margeson Cooley Dickinson Hospital PMCIPAts Mitch Kowalski Cooley Dickinson Hospital � t ,,�,i` __ Kurt Peterson Cooley Dickinson Hospital a xatemm. Don Spear Cooley Dickinson Hospital A= lavr n e s== Scott Johnson Cooley Dickinson Hospital xb*bwdP. V` Nancy King Cooley Dickinson Hospital LNGRUOM QG ASSOCIATES Bob Herfurth Cooley Dickinson Hospital . yam X baM.P.a. Chad Moran M.J. Moran Rm.1d G. StenluxAY.T. Richard Aquadro Aquadro & Cerruti , Inc. Edward L. Jendry Healthcare Architects Inc. Issues Discussed 15-1. The Hospital will replace the exit door from the existing rear stair tower . 15-2. Dick Aquadro will check into the projected finish date for the project in terms of coordination with the Department of Public Health. 15-3. The elevator package will be delivered July 5, 1995. 15-4. The Contractor will excavate for the Hospital ' s relocation of the main oxygen line. 15-5. The' floor tile will be eliminated in the Machine Room. 15-6. The gypsum wallboard ceiling will be eliminated from the Machine Room. 15-7. The wet laser 3M product issue needs to be resolved by the Hospital. 1 of 2 64 C07MC VrM= / NORlSA11MN. IBC RUSZTTS 01060 (419) 686-1512 s 16-8. The Contractor requested a schedule for the Meeting Room near Elizabeth 's office so that the window installation can be scheduled. END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. ward L. Je7dr . ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 FF_AA July 5, 1995 CONSTRUCTION MEETING NO. 16 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Un i t Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton, Massachusetts ROY 8. BrVwnA11. Idwora L ''Od!'AI-L Those Present MUOR PMCIPAIS C. J. wa1w.= Ernest Margeson Cooley Dickinson Hospital pwa,Aus Mitch Kowalski Cooley Dickinson Hospital IderkT. Duzai*� Kurt Peterson Cooley Dickinson Hospital z1�nao►� Don Spear Cooley Dickinson Hospital A= lA Tvwe Scott Johnson Cooley Dickinson Hospital Rkbwd P. Wk Donna King Cooley Dickinson Hospital LNCZNEEMG AMOCUTES Jim Mora n M.J. Moran Vm1am K s trY.P.& Richard Aquadro Aquadro & Cerruti , Inc. Ranaid G. 9tw31vnd X Edward L. Jendry Healthcare Architects Inc. Issues Discussed 16-1. Dick Aquadro predicted that the completion date would be August 29, 1995. 16-2. The elevator package should be delivered July 5, 1995. 16-3. The wet laser 3M product issue needs to be resolved by the Hospital . 16-4. The break-through into the existing Hospital was coordinated between the Hospital and the Contractor . 16-5. The Contractor 's Requisition was processed. 16-6. The floor tile for the corridor was selected to match the existing M . R. I . corridor in terms of color , but in the Hospital ' s (Stonetex Pattern) similar to the Second and Third Floors. 16-7. The Hospital will talk to G.E. relative to the electrical power switchover. 1 of 2 64 GOWC =RE= / NaMBA10MN. W3'i6G3vWM 01060 (419) 686-1612 17-7. The ceiling height at the overhead door area will be as high as possible after coordinating with duct work. This will be either V -311 or 7 ' -511. 17-8. Aquadro & Cerruti will verify the fire rating on the roof drain cleanout access panel . 17-9. Jim Moran brought up the issue that the insulated roof drain above the canopy might require heat trace cable. The Hospital will perform this . 17-10. The roof will be flooded as soon as possible to test the roof installation prior to ceiling installation. 17-11. Power for HCAC controllers is to be by Schmitt . 17-12. Magnetic starters by Electrical Contractor. 17-13. The leak at the skylight has not yet been found. 17-14. The Hospital must provide a door and door frame for the Storage Room at ramp. END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. Richard E. Katsanos REK/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 All July 12, 1995 CONSTRUCTION MEETING NO. 17 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital CORPORATE DIIMCTORS Northampton, Massachusetts Roy s D"VU A A. ZdWard L ''°'°"Aj.'` Those Present SXMOR PRMCIPAM QJ. Vh1w.m Mitch Kowalski Cooley Dickinson Hospital Fina[pAy Kurt Peterson Cooley Dickinson Hospital _XWkr DU_„AT, _Scott Johnson Cooley Dickinson Hospital D=D s mw _Donna King Cooley Dickinson Hospital 35dmwd IL 1srwal= Jim Moran M.J. Moran mohwd P. VUk George Hansen Aquadro & Cerruti , Inc. ENGDOOM VG AMOCILTES Richard Aquadro Aquadro & Cerruti , Inc. VMMM H. Har,7.PJL Richard E. Katsanos Healthcare Architects .Inc. Ronald G. 8ao1vm4PZ Issues Discussed 17-1. The elevator package should be delivered tomorrow, July 13, 1995. 17-2. The wet laser 3M product issue needs to be resolved by the Hospital. 17-3. The Hospital will talk to G.E. relative to the electrical power switchover . 17-4. Next week (Wednesday, July 19, 1995) Liquid Air will come to the Hospital for connection of medical gasses. Bill Frank will test immediately after connection. 17-5. Discussion of soffit height due to steam traps . Currently, four (4) traps are lined --up horizontally along the west wall of the Fides Room. This creates a box-out soffit at 61 -1-1/2" A.F.F. A new floor-to-ceiling chase, 21 -01t in face width will be constructed at the north end of the soffit (to avoid a clearance hazard) . The area beneath the soffit will be used by the Hospital for cart storage. 17-6. The soffit above the lockers will be finished at 72-1/211. 1 of 2 64 GWMC CPU= / NOSnUMPPON. N48 ACRUBMS 01060 (419) W6-1612 1 • 18-7. The Hospital will now install a new wet laser . Ed will contact Don Gibb of 3M at ( 800) 888-8812 regarding the model number for the new wet laser . 18-8. Mitch has determined exactly the temporary electrical power for the existing C . T . machine . This will be done around the first part of August. It was thought the existing C.T. machine should be recalibrated by G.E. after this power source has been attached to the machine. END OF MEETING Respectfully submitted, HEALTHCARE A ITECTS INC. Edward J ndry A. I . . ELJ/acp *Discussions of this meeting have been recorded as understood by the writer . Please notify the writer immediately of any omissions or corrections . 2 of 2 I July 19, 1995 CONSTRUCTION MEETING NO. 18 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit -Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton , Massachusetts Roy S. Brow A l.A. sdw.fa L Jm&7A' Those Present SMOR PMCIPALS C. J. Vh1U2.m Ernest Margeson Cooley Dickinson Hospital PMCZPAIS Scott Johnson Cooley Dickinson Hospital Elizabeth Nieves Cooley Dickinson Hospital zrwt r »o i Doas.�r Don Spear Cooley Dickinson Hospital RiOb"d a' Saks°" Chad Moran M.J. Moran A= laarOum XW= Wahard P. Wk George Hansen Aquadro & Cerruti , Inc. ENGIMENG ASSOCIATES Richard Aquadro Aquadro & Cerruti , Inc. vma= Y BarryPx Edward L. Jendry Healthcare Architects Inc. Ramald G. 9aalundYS. Issues Discussed 18-1. The relocation of the new ceiling-mounted air handler in the Control Room will be explored by all parties in terms of an option. 18-2. The question of whether a dutch door can be used for the Medical Records Room will be researched by Ed Jendry. 18-3. The scheduling of the Department of Public Health inspection will be done by Ernie Margeson. 18-4. The Aquadro & Cerruti completion date is August 28 , 1995 . Therefore , the G . E . equipment should be completed by September 11, 1995. The Department of Public Health inspection date should be the week of September 18 , 1995. 18-5. Payne Elevator has stated to Ernie that somehow they will get the new elevator inspected sometime during the month of August . 18-6. The rails for the movable shelving should arrive on or about August 8 , 1995. 1 of 2 64 GOTHIC STMT / N0R!'8"MW- =•92!CR S 01060 (419) 596-1612 , t 19-7. Kurt will install a temporary sawhorse around the catch basin near the Power Plant until the paving can be redone in the near future. 19-8 . The roof will be tested with a water test for 48 hours , but the Hospital will remove the roof drain plugs in the event of a rain storm. 19-9. The Hospital will furnish to the Contractor the wet laser sink in the corner of the room. 19-10. A pass-through window will be researched between the Medical Records Room and the corridor at the Basement level. 19-11. At the request of Radiology , a 1/2 glass window will be added to the door to the Medical Records Room on the Basement level. END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. Edwar L. y, A ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 July 26, 1995 CONSTRUCTION MEETING NO. 19 ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital DIREMORS Northampton , Massachusetts Rai s Hrovn. ♦r Ddward L Jand". ALL Those Present PRINCIPALS C. J. TWO== Ernest Margeson Cooley Dickinson Hospital SMOR AssocIATES Scott Johnson Cooley Dickinson Hospital Nabard z sataums Don Spear Cooley Dickinson Hospital Assoau►TZS Mitch Kowalski Cooley Dickinson Hospital ywt z. Dann. AX& Jim Moran M.J. Moran D= aaftr George Hanson Aquadro & Cerruti , Inc. Alm zavren" Kn= Rick Aquadro Aquadro & Cerruti , Inc. Edward L. Jendry Healthcare Architects Inc. Issues Discussed 19-1. The relocation of the new ceiling-mounted air handler in the Control Room will be explored by all parties in terms of an option. 19-2. Payne Elevator has stated to Ernie that somehow they will get the new elevator inspected sometime during the month of August . 19-3. The rails for the movable shelving can be installed anytime after August 2, 1995. 19-4. Mitch has determined exactly the temporary electrical power for the existing C . T . machine . This will be done around August 20, 1995. It was thought the existing C.T. machine should be recalibrated by G.E. after this power source has been attached to the machine. 19-5. The Hospital will research the option of adding a reflective mylar film on the windows facing the patient holding area off the C.T. Control Room. 19-6. Jim Moran will research the option of having the Gas Company raise the gas curb box. 1 of 2 d4 0MMC MW= / NORMUMN. NL99aC WW" 01080 (413) 884-"U 20-8. The 3M Technical Representative stated to Kurt that up to 100 CFM can be used to exhaust the 3M machine. END OF MEETING Respectfully submitted , f THCARE ARCHITECTS INC. r Jtnr , E LJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 .. 0 r LLAA August 2, 1995 CONSTRUCTION MEETING NO. 20 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital CORPORATE DMECTORS Northampton, Massachusetts Uy & &MWn J.A. Xd•d L JwadryAI.A. Those Present WnOR pMCIPAis C_ J. Vbftb4= Scott Johnson Cooley Dickinson Hospital PtcIFAM Don Spear Cooley Dickinson Hospital -AwkZ_DuPAA Mitch Kowalski Cooley Dickinson Hospital Dam Set— Kurt Peterson Cooley Dickinson Hospital Imehold X. AM X- Donna King Cooley Dickinson Hospital RiWuwdP. VM Chad Moran M.J. Moran ENGINEZE dG AMOCIATES George Hanson Aquadro & Cerruti , Inc. Vm18m 1c sWTY,pa. Rick Aquadro Aquadro & Cerruti , Inc. Rid G. StmlundXX Edward L. Jendry Healthcare Architects Inc. Issues Discussed 20-1. Jim Moran will research the option of having the Gas Company raise the gas curb box. 20-2. A pass-through window will be researched between the Medical Records Room and the corridor at the Basement level. 20-3. Rick Aquadro will look into the possibility of finding a metal door with a light in it for the Radiology Storage Room. 20-4. The General Contractor ' s requisition was processed. 20-5. The Hospital will determine how they will use the barium kitchen cabinets temporarily. 20-6. The tile floor pattern was changed in the toilet . 20-7. Mitch brought up the issue of the Elevator Contractor needing to pull necessary permits. 1 of 2 84 C.MMC 311=1 / MORMUWMN. MUM&CRUSMS 01060 (413) 565-1512 , 21-8. The Hospital ' s telephone system was discussed: a. The Hospital will run the new telephone cable. b. The Hospital will install the new telephone devices. 21-9. September 15 , 1995 is the proposed completion date. 21-10. Aquadro & Cerruti , Inc . will be asked to submit a price on the two ( 2) lead-lined doors for the room changeover issue. 21-11. The existing door to the old corridor was discussed in terms of leaving the existing door or removing the existing door frame and wall . END OF MEETING Respectfully submitted, HEZ.LTHCArE, jA HITECTS INC. Edward L Jen r A. A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 '3 August 9, 1995 1A11 CONSTRUCTION MEETING NO. 21 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital CORPORATE DWCTORS Northampton, Massachusetts xo, s OrOWMA.L. sward L JmaarYa t. Those Present SENIOR PP"ClPAW C. J. Va1tnm Ernest Margeson Cooley Dickinson Hospital PRNCIPAts Scott Johnson Cooley Dickinson Hospital _ MuuuAJ. Don Spear ___ _ _ Cooley_ Dickinson Hospital mKurt -Peterson zkm a z Cooley Dickinson Hospital Riebmwd„op. Donna King Cooley Dickinson Hospital FAabwap. W Elaine Kabat Cooley Dickinson Hospital LNGINEBMG AMOCIATE9 Nancy King Cooley Dickinson Hospital TMW= y, Sar".Px Jim Moran M.J. Moran PA=Aad G. 9uOlundX-L George Hanson Aquadro & Cerruti , Inc. Rick Aquadro Aquadro & Cerruti , Inc. Edward L. Jendry Healthcare Architects Inc. Issues Discussed 21-1. A pass-through window will be researched between the Medical Records Room and the corridor at the Basement level. 21-2. Mitch brought up the issue of the Elevator Contractor needing to pull necessary permits. 21-3. The track grouting needs to be completed and a missing track piece needs to be installed. 21-4. The Toilet Room door needs to be discussed. 21-5. The Elevator Inspector wants to have a few issues addressed. This will be discussed with Payne Elevator . 21-6. It was agreed that the construction fence could be removed at this time. 21-7. The window in the Conference Room will be finished sometime that is convenient for the Hospital 's schedule. 1 of 2 84 COMC grn= / NOR7HAWnON. YAqS&CHVs=Tq 01060 (419) se6-1612 22-6. The existing C.T. power switchover will be done this weekend. Donna will notify the Department that the existing unit will not be available for use until Sunday evening. 22-7. Aquadro & Cerruti will proceed with the wall cabinet unit for the Staff Toilet Room. 22-8. A methodology for installing some of the vinyl tile after the Cat Scan gantry has been installed was discussed. Rick Aquadro will discuss this approach with his Flooring Subcontractor. 22-9. The Contractor will try for final inspections from the City for a Certificate of Occupancy sometime around August 28 or August 29, 1995. END OF MEETING Respectfully submitted, HE LTHCARE ARCHITECTS INC. Edward L . Jend y, A. Ii. . ELJ/acp Discussions of this meeting have been recorded as understood by the writer . Please notify the writer immediately of any omissions or corrections. 2 of 2 August 16, 1995 AA CONSTRUCTION MEETING NO. 22 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton, Massachusetts Roy & HrnwnAl.& zdwurd L jaad".&" Those Present SENIOR PRINCIPALS Q 1. Twb.m Ernest Margeson Cooley Dickinson Hospital FMCIPALS Scott Johnson Cooley Dickinson Hospital _AW-k T Mm" Don Spear Cooley _Dickinson Hospital � R.mm Kurt Peterson Cooley Dickinson Hospital WSOM"� Donna King Cooley Dickinson Hospital akhowdP. VM Larry Glifort General Electric ENGn;KM dG AWOCIATES George Hanson Aquadro & Cerruti , Inc. , Vm10m s. BMT7.P.L Rick Aquadro Aquadro & Cerruti , Inc. RmaldG• 9t=1u:LdY.L Edward L. Jendry Healthcare Architects Inc. Issues Discussed 22-1. The Elevator Inspector wants to have a few issues addressed. This will be discussed with Payne Elevator. Ed will talk to Paul Hasbrook . 22-2. Aquadro & Cerruti , Inc . will be asked to submit a price on the two ( 2) lead-lined doors for the room changeover issue. 22-3. The existing door to the old corridor was discussed in terms of leaving the existing door or removing the existing door frame and wall . 22-4. General Electric will investigate the possibility of breaking down the equipment covers on the G . E . equipment to allow clearance through a 4 ' -0" door. 22-5. Aquadro & Cerruti will quote an exact price for the two (2) new lead-lined doors and new hardware . The Hospital gave a verbal go- ahead on the doors and hardware. 1 of 2 64 GOMC s1sM / NOR7ZAW N. 01060 (413) 556-151 23-7. The Hospital will decide when they want to proceed with the proposed window with a fire-shutter as a part of the unit. 23-8 . The Hospital will also pursue whether or not a touch pad lock will be added to the Film File Storage Room. 23-9. The Hospital will determine the exact location of the medicine wall cabinet. END OF MEETING Respectfully submitted, H LTHCARE AR TECTS INC. dward en y, . I A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections. 2 of 2 August 23, 1995 CONSTRUCTION MEETING NO. 23 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Un i t Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton, Massachusetts fty & V".n►a.d. Idwowd L Jaw" ` Those Present SENIOR PMCIPAIS Q J.inuam Ernest Margeson Cooley Dickinson Hospital PWaFA1B Scott Johnson Cooley Dickinson Hospital z Don _Spear Cooley Dickinson Hospital D= REftr Kurt Peterson Cooley Dickinson Hospital jusbord„r,. Donna King Cooley Dickinson Hospital y-hard P. VH` Denise Holmes Cooley Dickinson Hospital LNGIIJBERWG ASSOCIATLs Chad Moran M.J. Mora n VM12= Y. Bw"7PJL George Hanson Aquadro & Cerruti , Inc. Nomad G. 9tewuad.P.t. Rick Aquadro Aquadro & Cerruti , Inc. Edward L. Jendry Healthcare Architects Inc. Issues Discussed 23-1. Aquadro & Cerruti , Inc . will be asked to submit a price on the two ( 2) lead-lined doors for the room changeover issue. 23-2. The Contractor will try for final inspections from the City for a Certificate of Occupancy sometime around August 28 or August 29, 1995. 23-3. Aquadro & Cerruti will install the plywood and floor tile in the elevator cab. 23-4. The switching for the Barium Kitchen was decided upon. 23-5. The Elevator Equipment Room will be seal- coated. 23-6. The Hospital will try to add two ( 2 ) additional fire pull stations with horn/light devices above. 1 of 2 84 GOTWC MW= / NORTHAMPrON, 1u.98aC8tRMTS 01060 (ass) 566-1512 24-7. Ed will send Rick a final acceptance letter for the Building Inspector 's office. 24-8. The Punch List will be done next Wednesday, September 6, 1995, at 8 :041 A.M. END OF MEETING Respectfully submitted, HEALTHCARE ARCHITECTS INC. 1w'aa4rdL. end y, A. A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer. Please notify the writer immediately of any omissions or corrections . 2 of 2 Ilk August 30, 1995 �Ajl CONSTRUCTION MEETING NO. 24 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Unit Cooley Dickinson Hospital Northampton , Massachusetts CORPORATE D1RECTOR9 i a:a a L uAIA. Those Present SMOR PRWCD'AW Ernest Margeson Cooley Dickinson Hospital c J. Vblte m Mitch Kowalski Cooley Dickinson Hospital PWa'AW Don Spear Cooley Dickinson Hospital n=�� Kurt--Peterson Cooley Dickinson Hospital 2WbaM & mWoex" Donna King Cooley Dickinson Hospital A=JANTOMW xW=dPr � Bob Herfurth Cooley Dickinson Hospital Nancy King Cooley Dickinson Hospital ENGIIISERMG ASSOCIATES Chad Moran M.J. Mora n Ronald G. st iun"Y. George Hanson Aquadro & Cerruti , Inc. Rick Aquadro Aquadro & Cerruti , Inc. Edward L. Jendry Healthcare Architects Inc. Issues Discussed 24-1. Aquadro & Cerruti , Inc . will be asked to submit a price on the two ( 2) lead-lined doors for the room changeover issue. 24-2. The Contractor will try for final inspections from the City for a Certificate of Occupancy sometime around September 5, 1995. 24-3. The Hospital will try to add two ( 2 ) additional fire pull stations with horn/light devices above. 24-4. The Hospital will decide when they want to pr.oceed with the proposed window with a fire-shutter as a part of the unit. Ed will help Kurt with this . 24-5. The Hospital would like to have a touch pad lock added to the Film File Storage Room. 24-6. The Hospital has requested that the Department of Public Health inspection take place on or about the week of September 18, 1995. 1 of 2 64 coTMC MM= / NORT1l4IMMM. 1ASSAMUSEM 01080 (419) 686-1612 1 25-8. The shelving installer will coordinate his wiring with the local Elevator Inspector . 25-9. The air volume needs to be clarified in the Computer Room. END OF MEETING Respectfully submitted, EALTHCARE ARCHITECTS INC. U . ry A. I .A. ELJ/acp Discussions of this meeting have been recorded as understood by the writer . Please notify the writer immediately of any omissions or corrections. 2 of 2 A-11 September 6, 1995 CONSTRUCTION MEETING NO. 25 HEALTHCARE ARCHITECTS INC. New Addition and M.R. I . Un i t Cooley Dickinson Hospital CORPORATE DIRECTORS Northampton, Massachusetts Roy L Brow&A.I.A. Zdward L Jands7,A.L Those Present SENIOR PRINCIPALS C. r. •hltham Ernest Margeson Cooley Dickinson Hospital PRINCIPAIS Mitch Kowalski Cooley Dickinson Hospital Mot T. DunnAIL Kurt Peterson Cooley Dickinson Hospital Dan Richard L Zatem« George Hanson Aquadro & Cerruti , Inc. Am tawronm ono: Rick Aquadro Aquadro & Cerruti , Inc. Richard P. /lllc Edward L . Jendry Healthcare Architects Inc. ENGINEERING ASSOCIATE'S Vmiam IL Barrs.PX Issues Discussed Ronald G. Btamlund. M 25-1. Aquadro & Cerruti , Inc . will be asked to submit a price on the two ( 2) lead-lined doors for the room changeover issue. 25-2. The Contractor will try for final inspections from the City for a Certificate of Occupancy sometime around September 7, 1995. 25-3. The Hospital will try to add two ( 2 ) additional fire pull stations with horn/light devices above. 25-4. The Hospital will decide when they want to proceed with the proposed window with a fire-shutter as a part of the unit. Ed will help Kurt with this . 25-5. The Hospital has requested that the Department of Public Health inspection take place on or about the week of September 18, 1995. 25-6. Ed will send Rick a final acceptance letter for the Building Inspector 's office. 25-7. The Elevator Inspector will be inspecting the elevator on September 7, 1995. 1 of 2 04 Ck=C grp=T / NORrAAM'TON. luseaCHUMT9 01080 (419) 606-1612 TRANSMITTAL 2 B 4, 6 LETTER a AIA DOCUMENT 6870 PROJECT: New Addition and M.R.I. Unit ARCHITECT'S Cooley Dickinson Hospital PROJECT NO: HAI-94-13 Northampton, Massachusetts - DATE: September i, 1995 r TO: Mr. Frank Sienkiewicz, Building Commissioner If enclosures are not as noted, please City of Northampton, Massachusetts inform us immediately. Office of the Building Inspector If checked below, please: ATTN: 212 Main Street ( ) Acknowledge receipt of enclosures: L Northampton, Massachusetts 01060) ( ) itetum endosures LD us. WE TRANSMIT: ()Q herewith ( -) arnder separate cover via ( ) in accordance with your request — -- - 'FOR YOUR:: -- ( }approval ( ) distribution to parties ( ) information ( ) eeview A comment ( ) record ( X) use ( ) THE FOLLOWING. 1 ) Drawings j ) Shop Dewing Prints ( ) Samples -- — ( ) Specifications ( ) Shop Drawing Reproducibles ( ) Product Literature ( ) Change Order (X) Letter/Minutes COPIES. DATE REV.NO- DESCRIPTION CODE ACTION AC 1 9/6/95 Letter 1 Complete Set Minutes of the Construction Meetings (Nos. 1 Through 25) ACTION, A. Action indicated on stern transmitted D. For signature and torw•arding as noted below under REMARKS CODE !. No action reoutred E. See REMARKS below C. For signature and return to this office R_'MARKS COPIES TO: (with enclosures) ❑ HEALTHCARE ARCHITECTS INC. ❑ 64 GOTHIC STREET ❑ NORTHAMPTON, MASSACHUSETTS 01060 ❑❑ BY: Edward L. Jendry, A.I.A. AIA 00CL%A[1,1 G910 t[TTii k9k ; 19': t.71TlO� At♦• • COPYRIGMI Q 1976 O-.E PAGE �� IE C •. i*,sT ;L''[ r F AECP-7:CTS 172° �'ASSaC��SGT'S A�E��: 1�� 1�A5NtvGTO�.D C.2yJ3b NIA September 6, 1995 ..- HEALTHCARE ARCHITECTS INC. Mr. Frank Sienkiewicz, Building Commissioner CORPORATE DIRECTORS City o f Northampton RayS• BrawsAX& Office of the Building Inspector Zdwwd L Jeodry.A.I.A 212 Main Street SENIOR PRINCIPALS Northampton, Massachusetts 01060 C. J. V1WU2Am PRINCIPALS Re: New Addition and M.R. I . Unit ywk T. ,,.nnAlA. Cooley Dickinson Hospital Don Hefter Ii Rieturd E. abaaoe Northampton, Massachusetts A= JAwrenoe Km= Rlaherd P. WM Dear Frank: ENGINEERING ASSOCIATES V=a= x- Barry.P.X This letter is a certification that I have monitored Ramald G. Stenlund,P.T. the construction of the new M.R. I ./C.T. Addition at Cooley Dickinson Hospital , and it has been constructed in accordance with our Construction Documents and in accordance with the Massachusetts Building Code. If you have any questions , please feel free to contact me. Sincerely, HEALTHCARE ARCHITECTS INC. i i Edward L. endr , A I . ELJ/acp cc: Ernest Margeson - Cooley Dickinson Hospital Rick Aquadro - Aquadro & Cerruti , Inc. 64 GWMC gRWr NOaRHA18''�ON, XASSA0rJ8F1Z9+ 01080 (419) 686-1612