23B-046 (135) 2-5. Ed will ask Ron Stenlund to talk to the Hospital's engineering
department sometime in the next few days.
2-6. Additional electrical and nurse call devices will be added to the
Physical Therapy wall.
2-7. Door No. 16 and Door No. 17 will not need a label.
2-8. P.A. speakers will be installed in the corridors.
2-9. Interim Life Safety Measures will be performed when the corridor to
the new addition is temporarily closed down.
2-10. Blocking needs to be installed in the walls for the T.V. brackets.
Respectfully submitted,
HEALTHCARE ARCHITECTS INC.
Edward L. Jendry, A.I. / L
ELJ/al
*Discussions of this Meeting have been recorded as understood by the Writer. Please
notify the Writer immediately of any omissions or corrections. These Minutes will
be considered true and correct if not contested by the adjournment of the next Project
Meeting.
April 14, 1999
HEALTHCARE
ARCHITECTS INC. MINUTES OF CONSTRUCTION MEETING NO. 2
CORPORATE DWCTOR Temporary Joint Center
EdwardLJ=ft A.I.A. Cooley Dickinson Hospital
Northampton,Massachusetts
SENIOR PRINCIPAL
C.I.wmdm Those Present
PRINCIPALS Ernest Margeson Cooley Dickinson Hospital
DwHaba Scott Johnson Cooley Dickinson Hospital
Rib dEKaanos
,=I,wm=Ynm Don Spear Cooley Dickinson Hospital
R;cbuaP WM Mitch Kowalski Cooley Dickinson Hospital
Bob Herfuth Cooley Dickinson Hospital
ENGIN]MU NG ASSOCIATES Chad Moran M.J. Moran
Wi =NLBwy,R
RanaW G.StmLmd,PF Kurt Peterson M.J. Moran
Edward Jendry Healthcare Architects Inc.
Issues Discussed
1-1. Meetings will be Wednesdays at 8:00 A.M. until further notice.
1-6. The status of the Johnson Temperature Controls, in terms of group
purchasing costs and the Alternates, still has to be determined.
1-9. Additional medical gas wall outlets and sink will be added to the
north wall of the Physical Therapy area.
1-13. The completion date is still scheduled for May 15, 1999.
New Business
2-1. M.J. Moran will do the controls, for the base price of the pneumatic
system.
2-2. The balancing sub-contractor quotes were received, Labco was
selected as the sub-contractor based on their low-bid.
2-3. In terms of the nurse-call system; a Dukane System will be used in
lieu of Executone. The lead-time needs to be identified.
2-4. The ceiling height in the corridor at the base of the ramp was
discussed. The ceiling height in this area will be 7'-8" in height.
HEALTHCARE ARCHITECTS INC. 64 GOTHIC STREET NORTHAMPTON, MASSACHUSETTS 01060 413-585-1512
3-3. The corridor area in front of the stairwell will have the necessary
demolition work done this week.
3-4. The elevator lobby area will be worked on during nights or weekends.
3-5. Med Air will be piped into the patient headwalls.
3-6. The existing exhaust ducting will be revisited, so that the ductwork
sizes can be reduced to reflect the current and future needs of the west
part of the (first floor west wing). Chad will talk to Ron.
Respectfully submitted,
HEALTHCARE ARCHITECTS INC.
Edward L. Jendry, A. . I A'�- .
ELJ/al
*Discussions of this Meeting have been recorded as understood by the Writer. Please
notify the Writer immediately of any omissions or corrections. These Minutes will
be considered true and correct if not contested by the adjournment of the next Project
Meeting.
x x
MAY 2 01999
THCA April 21, 1999 Vin;®F WJ1 Et�r
EEALRE
...._ ��
`,RCFIITECI'S WC MINUTES OF CONSTRUCTION MEETING NO.3
CORPORATE DIRECTOR Temporary Joint Center
Edward Lkaft A.LA. Cooley Dickinson Hospital
Northampton,Massachusetts
SENIOR PRINCIPAL
CJ.Wbfth m Those Present
PRINCIPALS Ernest Margeson Cooley Dickinson Hospital
EScott Johnson Cooley Dickinson Hospital
A=LawrrmceK= Don Spear Cooley Dickinson Hospital
Richard P.VI& Mitch Kowalski Cooley Dickinson Hospital
Chad Moran M.J. Moran
ENGINEERING ASSOCI&W Edward Jendry Healthcare Architects Inc.
WMi=M.Bury.P.E.
Ramald G.Sre 1wW P.E.
Issues Discussed
1-13. The completion date is still scheduled for May 15, 1999, but may
change due to D.P.H. delays.
2-3. In terms of the nurse-call system; a Dukane System will be used in
lieu of Executone. The lead-time needs to be identified.
2-5. Ed will ask Ron Stenlund to talk to the Hospital's engineering
department sometime in the next few days.
2-8. P.A. speakers will be installed in the corridors.
2-9. Interim Life Safety Measures will be performed when the corridor to
the new addition is temporarily closed down.
2-10. Blocking needs to be installed in the walls for the T.V. brackets.
New Business:
3-1. Bill Morini needs to reprice the flooring work due to a change in the
scope of work.
3-2. Asbestos Abatement is scheduled for April 27, 1999. Electron
microscope testing will be done in lieu of an air sample.
HEALTHCARE ARCHITECTS INC 64 GOTHIC STREET NORTHAMPTON, MASSACHUSETTS 01060 413-585-1512
New Business:
4-1. The connecting ramp between the west wing and the new addition
will be taken out of service for a two week period,beginning this
Sunday morning.
4-2. The final price agreement has been reached with the Dukane Nurse
Call System vendor. Price will be $6,000.00 plus cabling costs.
4-3. There should be no smoking in front of P.T. by the Contractors.
4-4. Contractor parking has been designated in the front lot near Locust
Street.
4-5. The hair-washing sink will be installed by the Hospital in the shower
room.
Respectfully submitted,
HEALTHCARE ARCHITECTS INC.
G 9I.A.
�Edward L. Jendry,
ELJ/al
*Discussions of this Meeting have been recorded as understood by the Writer. Please
notify the Writer immediately of any omissions or corrections. These Minutes will
be considered true and correct if not contested by the adjournment of the next Project
Meeting.
"AY 2.01999
G
HEALTHCARE
April 28, 1999 .,.,. : .. .::-
ARCHMECM INC. MINUTES OF CONSTRUCTION MEETING NO. 4
CORPORATE DIRECTOR Temporary Joint Center
E wudLJ=ft A1j. Cooley Dickinson Hospital
Northampton,Massachusetts
SENIOR MINCIPAL
C.J. Those Present
PRINCIPALS Ernest Margeson Cooley Dickinson Hospital
Dw
RiiCb dHaina EKWs=w Scott Johnson Cooley Dickinson Hospital
A=Lawrwm Knox Don Spear Cooley Dickinson Hospital
R,cbardpWilk Mitch Kowalski Cooley Dickinson Hospital
Kurt Peterson Cooley Dickinson Hospital
ENGII1EEmGASBOCIATES Chad Moran M.J. Moran
WMiam KBWry.PL
Rr�1au.St0RjUAa.PX. Edward Jendry Healthcare Architects Inc.
Issues Discussed
1-13. The completion date is still scheduled for May 15, 1999, but may
change due to D.P.H. delays.
2-3. In terms of the nurse-call system; a Dukane System will be used in
lieu of Executone. The lead-time needs to be identified.
2-5. Ed will ask Ron Stenlund to talk to the Hospital's engineering
department when he is in town again.
2-9. Interim Life Safety Measures will be performed when the corridor to
the new addition is temporarily closed down.
2-10. Blocking needs to be installed in the walls for the T.V. brackets.
3-1. Bill Morini needs to reprice the flooring work due to a change in the
scope of work.
3-4. The elevator lobby area will be worked on during nights or weekends.
3-6. The existing exhaust ducting will be revisited, so that the ductwork
sizes can be reduced to reflect the current and future needs of the west
part of the (first floor west wing). Chad will talk to Ron.
HEALTHCARE ARCHITECTS INC. 64 GOTHIC STREET NORTHAMPTON, MASSACHUSETTS 01060 413-585.1522
1
5-2. The new sprinkler piping will be run below the existing pharmacy
ceiling. This area will be renovated at a later point in time.
5-3. The D.P.S. approval needs to be obtained once the D.P.H. approval
has been received from the state.
5-4. Ed will call Emile Guy to try and expedite the paperwork approval
from D.P.H. for the project.
Respectfully submitted,
HEALTHCARE ARCHITECTS INC.
a / `
Edward L. Jendry,A.
ELJ/al
*Discussions of this Meeting have been recorded as understood by the Writer. Please
notify the Writer immediately of any omissions or corrections. These Minutes will
be considered true and correct if not contested by the adjournment of the next Project
Meeting.
MAY
S
>MAMCARE May 5, 1999
ARCHITECrS INC MINUTES OF CONS UM(jN MEETING NO. 5
CORPORATE DntECMR Temporary Joint Center
E wwdLJ=dry,Al-&- Cooley Dickinson Hospital
Northampton,Massachusetts
SENIOR PMCiPAL
cI.whd= Those Present
PIMCIPALS Ernest Margeson Cooley Dickinson Hospital
D0°Hahm Scott Johnson Cooley Dickinson Hospital
RidwdE Kana=
A=LawrmmXn= Mitch Kowalski Cooley Dickinson Hospital
R;chudPVM Kurt Peterson M.J. Moran
Chad Moran M.J. Moran
ENGIIM0J1 VG ASSOCIATES Edward Jendry Healthcare Architects Inc.
WMi=xBau1,P-E
RmAAG.SUMkZ ,PY
Issues Discussed
1-13. The completion date is still scheduled for May 15, 1999, but may
change due to D.P.H. delays.
2-5. Ed will ask Ron Stenlund to talk to the Hospital's engineering
department when he is in town again.
2-9. Interim Life Safety Measures will be performed when the corridor to
the new addition is temporarily closed down.
3-1. Bill Morini needs to reprice the flooring work due to a change in the
scope of work.
3-4. The elevator lobby area will be worked on during nights or weekends.
Schedule to be established.
4-3. There should be no smoking in front of P.T. by the Contractors.
4-4. Contractor parking has been designated in the front lot near Locust
Street.
New Business:
5-1. The nurse call system components will arrive the week of the 10'h of
May.
HEALTHCARE ARCHI'T'ECTS INC 64 GOTHIC STREET NORTHAMPTON. MASSACERISETTS 0100 413-585-1512
New Business:
6-1. A firewatch needs to be performed whenever soldering work is being
done.
6-2. The existing asbestos remaining insulation material will be wrapped, \
inventoried and labeled.
Respectfully submitted,
HEALTHCARE ARCHITECTS INC.
Edw�C PX1
Edward L. Jendry, A. -A. �-
ELJ/al
*Discussions of this Meeting have been recorded as understood by the Writer. Please
notify the Writer immediately of any omissions or corrections. These Minutes will
be considered true and correct if not contested by the adjournment of the next Project
Meeting.
r �
MAY (
. 4
Q t
May 12, 1999 d ' ' 0f Usa; pttdr,t` Z11
EMALTECAREUf�i riAMpr� f
ARCl3T'TECTS INC. MINUTES OF CONSTRUCTION MEETING NO. 6
CORPORATE DMECTOR Temporary Joint Center
EdwatdLJ=dry•.A3A Cooley Dickinson Hospital
Northampton,Massachusetts
SENIOR PRINCIPAL
c.I.wbitham Those Present
PMCYFALB Ernest Margeson Cooley Dickinson Hospital
nO°Hihw Mitch Kowalski Cooley Dickinson Hospital
Riehud a Xau a
A=La.rreaceU= Kurt Peterson M.J. Moran
RichudPVM Chad Moran M.J. Moran
Edward Jendry Healthcare Architects Inc.
ENGWEEMG ASSOCLAM
VrQ=bLBrry.P.E
RrmaW G.S—)-1A P Issues Discussed
f
2-5. Ed will.ask Ron Stenlund to talk to the Hospital's engineering
department when he is in town again.
2-9. Interim Life Safety measures will be performed when the corridor to
the new addition is temporarily closed down.
3-1. Bill Morini needs to reprice the flooring work due to a change in the
scope of work.
3-4. The elevator lobby area will be worked on during nights or weekends.
Schedule to be established.
4-3. There should be no smoking in front of P.T. by the Contractors.
5-1. The nurse call system components will arrive the week of the 10th of
May.
5-2. The new sprinkler piping will be run below the existing central sterile
ceiling. This area will be renovated at a later point in time.
5-3. The D.P.S. approval needs to be obtained once the D.P.H. approval
has been received from the state.
HEALTHCARE AROU I'EC'f5 INC. 64 GOTHIC STREET NORTHAMPTON, MASSACHUSETTS 01060 413-585.1512
New Business:
7-1. In terms of the project completion date,the completion date will be
accomplished from the date (D.P.H.) approves the project as follows:
M.J. Moran............................. 2-1/2 Weeks
Hospital Work Forces................ 6 Weeks
7-2. There will be no handrails in the corridor, at this point in time. If it is
desired by the Hospital or required by D.P.H. in their inspection, the
handrails will then be installed in the unit.
7-3. Work will now proceed on the exterior wall finish of the east exterior
wall.
7-4. Vinyl paneling will be used on the shower walls in lieu of ceramic
tile.
END OF MINUTES
Respectfully submitted,
HEALTHCARE ARCHITECTS INC.
dward L. Jendry, I.A� L
ELJ/al
*Discussions of this Meeting have been recorded as understood by the Writer. Please
notify the Writer immediately of any omissions or corrections. These Minutes will
be considered true and correct if not contested by the adjournment of the next Project
Meeting.
UU; MAY 2
1)ko I�Of 8q U
;� x: r ' GTION's
>MALTHCARE May 19, 1999 �,E ,
ARCffiTEC'TS INC MINUTES OF CONSTRUCTION MEETING NO. 7
CORPORATE DIRECTOR Temporary Joint Center
EdwardLkadry.Al& Cooley Dickinson Hospital
Northampton,Massachusetts
SENIOR PMCIPAL
C.I.whidham Those Present
PRMCIL'ALS Ernest Margeson Cooley Dickinson Hospital
o°aHaft`` Scott Johnson Cooley Dickinson Hospital
RicWdE Kanmw
A=LawmaccYLAM Mitch Kowalski Cooley Dickinson Hospital
Richard PVr& Kurt Peterson M.J. Moran
Chad Moran M.J. Moran
ENGINEr MG ASSOCIATES Edward Jendry Healthcare Architects Inc.
William M.Barry,PL
Raaald G.Steol®d..P.E.
Issues Discussed
2-9. Interim Life Safety measures will be performed when the corridor to
the new addition is temporarily closed down.
3-1. Bill Morini needs to reprice the flooring work due to a change in the
scope of work.
3-4. The elevator lobby area will be worked on during nights or weekends.
Schedule to be established.
4-3. There should be no smoking in front of P.T. by the Contractors.
4-4. Contractor parking has been designated in the front lot near Locust
Street.
5-2. The new sprinkler piping will be run below the existing central sterile
ceiling. This area will be renovated at a later point in time.
5-3. The D.P.S. approval needs to be obtained once the D.P.H. approval
has been received from the state.
5-4. Ed has called Emile Guy to.try and expedite the paperwork approval
from D.P.H. for the project. Ed will call him on a weekly basis to try
and move the approval process along.
HEALTHCARE ARCHITECTS INC. 64 GOTHIC SrREEr NORTHAMPTON, MASSACHUSETTS 01060 413-585.2512
'Discussions of this Meeting have been recorded as understood by the Writer.
Please notify the Writer immediately of any omissions or corrections. These
Minutes will be considered true and correct if not contested by the adjournment of
the next Project Meeting.
2 of 2
July 21, 1999
MINUTES OF CONSTRUCTION MEETING NO. 16
HEALTHCARE
ARCHITECTS INC. '
Temporary Joint Center
Cooley Dickinson Hospital
Northampton,Massachusetts
CORPORATE DMECTOR
EdwwdLJmft ALA.
Those Present:
SMOR PRINWAL
G.whid= Ernest Margeson Cooley Dickinson Hospital
Scott Johnson Cooley Dickinson Hospital
Don Spear Cooley Dickinson Hospital
On��' Bob Herfarth Cooley Dickinson Hospital
Richard Kaumos Mitch Kowalski Cooley Dickinson Hospital
Ann LAwn=z Knox Ann Ridabock Cooley Dickinson Hospital
Richard P Wilk Kurt Peterson M.J.Moran
Edward Jendry Healthcare Architects Inc.
ENGRIEERING ASSOCIAITS
waliamM.Barry,PE Issues Discussed:
Rca1dQ Sxeai®d,PE
5-3. The Department of Public Safety approval needs to be obtained once the
Department of Public Health approval has been received from the State.
Ernie will contact the Department of Public Safety to review the project
10-6. A fire damper for the Pharmacy needs to be put in before the project is
completed.
10-9. New signage needs to be ordered. Ernie will talk to Kathy and Ann about
this issue.
142. The flooring cove base needs to be finished.
New Business:
16-1. A crash cart is needed for the Unit. Scott will get Ann a crash cart.
16-2. The Unit will open on Monday.
END OF MINUTES
Respectfully submitted,
HEALTHCARE ARCHITECTS INC.
Edward L.Jendry,A
ELJ/acp
1 of 2
HEALTHCARE ARCHITECTS INC. 64 GOTHIC STREET NORTHAMPTON, MASSACHUSETTS 01060 413-585-1512
TRANSMITTAL O -L`
LETTER
AIA DOCUMENT G870
PROJECT: Temporary Joint Center
Nom.__. •_
Cooley Dickinson Hospital ARCHITECT'S� � � � n .�� NO: HAI-99-16
Northampton, Massachusetts U
2 3 ic�gg
: July 22, 1999
5
TO: Mr. Anthony L. Patillo p 0 If closures are not as noted, please
Building. Commissioner NO T;(}hgnf us immediately.
City of Northampton " checked below, please:
Office of the Building Inspector
ATTN. City Hall - 212 Main Street (. ) Ack^ow)edge receipt of enclosures:
L ( ) Retumendosures to us.
WE TRANSW� Prthampton, Massachusetts 0106
(X) herewith ( ) .under separate cover via
( ) in accordance with your request
FOR YOUR:
( ) approval ( ) distribution to parties ( ) information
( ) review & comment (X) record
(X) use ( )
THE FOLLOWINC-
( ) Drawings ( ) Shop Drawing Prints ( ) Samples
( ) Specifications ( ) Shop Drawing Reproducibles ( ) Product Literature
( ) Change Order ( X) Minutes
COPIES DATE REv,NO.I DESCRIPTION ACTION
CODE
1 I 7/21/99 Minutes of Construction Meeting No. 16
I
I
ACTION, A. Action indicated on item transmitted D. For signature and lorwarding a% noted beio`+ under REMARKS
CODE B. No action reauved E. See REMARKS blow
C. For signature and return to this office
Rf MARKS
COPIES TO: (with enclosures)
0 HEALTHCARE ARCHITECTS INC.
r7 64 GOTHIC STREET
[) NORTHAMPTON, MASSACHUSETTS 01060
BY: Ann Paquette for Ed Jendry
AiA DOCI—SWO G510 +oR : 19•C [D,^Ta[)♦ AIA* - CLaS'R+Gt•11- -19% ONE PAGE