32A-255 (118) MLITC:ALFE * THORNE, INC.
ARCHITECT'S AOWNER
HITECT U 150 Main Street
FIELD REPORT CONSULTANT ❑ Northampton, MA 01060
AIA u(xUMtNT 0711 FIELD ❑ (413) 586-5775 ,--
PROJECT: Hotel Northampton FIELD REPORT NO: 14
Rooms #200 - #500
CONTRACT: ARCHITECT'S PROJECT NO: 8634 . 00
DATE TIME 11: 15 A.M. WEATHER Sunny TEMP. RANGE 70
EST % Of COMPLETION 50% CONFORMANCE WITH SCHEDULE (t, -)
WORK IN PROGRESS PRESENT AT SITE M. Gelotte , J. Cascio (Miller)
S . Jablonski
Metal stud framing for Rooms #200 and #300.
Room #400 wall lines layed out, windows cut down for doors Rooms
and #500.
OBSERVATIONS
(1) J. Cascio pointed out potential problem with door jamb for door
into bathroom Room #200 .
(2) Slab in closet of Room #300 was extended.
W SOW
t,
R ;
K. BUiIDING INSPECTtptyS
ITEMS TO VERIFY OR ACTION REQUIRED
(1) J. Cascio will adjust wall framing if necessary for bathroom door
to fit in Room #200, M. Ge otte concurred.
ATTACHMENTS
REPORT BY: Steve Jablonski "- cc : Dennis Smith, William Ni.mo ay
AIA DOCUMENT 6711 • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION • AIA® • m 1972
THE AMERICAN INSTITUTE Of ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON,D.C.20006 page OI pages