06-039 (8) CONSTRUCTION CONTROL FIELD INSPECTION REPORT
Project: Zoe Senior Retirement Community
SAGE ENGINEERING&CONTRACTING, INC. Job Location: "345 Haydenv lle Road
199 SERVISTAR INDUSTRIAL WAY, SUITE 2 Northampton, MA 01060
WESTFIELD, MASSACHUSETTS 01085 Inspection Date: 01-06-2014
(413)662-4884 Time: 11:00 AM to 01:00 PM
Sage Job Number: 0482-04-13
Building No: BP-2013-1096
WEATHER: Light drizzle,39
EST. %OF COMPLETION: 20%
CONSTRUCTION SUPERVISOR: Ed Fortini,Sage Engineering&Contracting, Inc.
PRESENT AT SITE
-Sage Engineering&Contracting, Inc.
-McCain and Sons(Plumbing Sub Contractor)
-Gustafson Electric(Electrical Sub Contractor)
-Warehouse Mechanical(Fire Protection Sub Contractor)
Equipment:
-Storage Container -Sage Storage Trailer
-Lull 844C -Mobile Office Trailer
-(2)Portable Restroom Facilities -JLG Lift RSC-600
WORK IN PROGRESS
- 2 nd and 3` waste and vents lines west of gridline 6.5
- Soundboard is being installed 2nd floor east of gridline 6.5
- VTAC units and cabinets are being installed on 2nd floor east of gridline 6.5
- 3`d floor east of gridline 6.5 drywall is being taped and sanded
- Siding is being installed east of gridline 6.5
- Shingled roof is being installed west of gridline 6.5
- Blocking is being installed 1St floor east of gridline 6.5
- Drywall is being huntq on the 3`d floor east of gridline 6.5
- Rough electric on 1S floor east of gridline 6.5
- Fire protection is being installed on the first floor east of gridline 6.5
- Dividing beams in elevator shaft are being installed
WORK COMPLETED SINCE PREVIOUS INSPECTION
- 2" and 3` floor rough framing of bearing walls and partition walls west of gridline 6.5
- 3`d floor deck is installed west of gridline 6.5
- Insulation has been installed on second floor east of gridline 6.5
- Rough plumbing 1 at floor east of gridline 6.5 in kitchen area
- Rough plumbing 1 at floor west of gridline 6.5
- Poly vapor barrier is installed 2nd and 3`d floor east of gridline 6.5
OBSERVATIONS
Work in Progress Is In Compliance With Plans&Specifications.
INFORMATION OR ACTION REQUIRED
OV
COMMENTS
4s-INSPECTION BY: Nikolaidis Frank DeMarinis, P.E.
DATE: 1 DATE: 01-06-2013
0 � - 0 3 � (o '3
SAGE ENGINEERING AND CONTRACTING9 INC.
DE51GN-13UILD DEVELOPMENT, ARCHITECTURAL ENGINEERING, AND CONSTRUCTION MANAGEMENT
January G", 2014
J JAM - 8 2014
Lou15 Hasbrouck, Building Comm155ioner
City of Northampton < < � + D60 �1O"� �
21 2 Main Street
Northampton, Ma 01 OGO
RE:Zoe Senior Retirement Community, 345 Haydenville Road, Northampton, Ma
SAGE Project No. 0482
City of Northampton Building Permit No: 13P-201 3- 1095
Dear Mr. Hasbrouck:
On behalf of Chakalo5 Investments, Inc., please find the enclosed Construction Control
Field In5pection Report dated 01 -OG- 14 a5 required by The 2009 International
BuildmcJ Code and the Ma55achu5ett5 State Amendment to the 2009 International
Building Code for your reference on the exi5ting project in progress named above.
We are available at your convenience to review the in5pection reports, answer any
que5tion5 or concerns you may encounter regarding this project.
Sincerely,
Elia5-Dimitri5 Nikolaidi5
Junior Engineer
SAGE ENGINEERING*CONTRACTING, INC.
199 5ERV15TAR INDUSTRIAL WAY-SUITE 2
WE5TFIELD, MA55ACHU5ETT5 01085
TEL: 413-5G2-4884 - FAX: 413-5G2-4899
PAGE I OF I www.5aee-IIc.com