Loading...
17 Trumbull - HotTub! RYAN S. HELLWIG, PE ! STRUCTURAL ENGINEER ! July 6, 2011 Michele St. Pierre Noho Properties P. O. Box 1444 Northampton, MA 01061 Re:17 Trumbull Road Northampton, MA Subject:Deck Support for Hot Tub The following is a summary report of my evaluation of the above-mentioned issue. The live load is 90 psf live at the hot tub for an extent of about 7 feet from the west end, and 40 psf elsewhere on the deck. The deck joists are 2x8 P.T. spaced at 16" on center with a span of about 6'-3". They are adequate for this loading. Joist hangers must be rated for a minimum of 500 lbs. The north end of the joists bear on a double 2x10 P.T. beam that spans the full 19 ft. width of that section of the building. For this loading, the span of this beam needs to be reduced by placing a post down onto the exterior wall below, approximately 8 feet from the northwest corner, in order to clear the window. There must be a stud in the wall under this new post location. The south end of the joists bear on a double 1.75" x 11.875" LVL beam under the deck along the main house. For this loading, this beam is sufficient. However, full bearing must be provided at each end on studs in the sidewalls below. These need to be added if they do not exist. Some field verification is therefore required. Respectfully, Ryan S. Hellwig, PE Massachusetts Professional Engineer #37300 - STRUCTURAL Copy to:Chuck Miller, Ass’t Building Commissioner - cmiller@northamptonma.gov ! 28 ALDRICH STREET ! NORTHAMPTON, MA 01060 ! ! Voice = 413-584-HLWG (4594) ! Fax = 413-584-HLWFax (4593) ! Email = rshpe@crocker.com !