18D-051 (10) MASSACHUSETTS STATE BUILDING CODE
CONSTRUCTION CONTROL FINAL REPORT
DATE: / AV)-) q
BUILDING PERMIT#: BP- 013-0780
PROJECT TITLE: Proposed Automobile Dealership
PROJECT LOCATION: 347 King Street, Northampton, Massachusetts, 01060
NAME OF BUILDING: Country Hyundai
SCOPE OF PROJECT: Construction of a new 18,421sf automobile dealership. Included earthwork,
utility and sewer connections,stormwater management system,footings,
foundations, slab on grade, pre-engineered metal building structure,
exterior walls(composite panels, vertical metal panels, masonry block),
membrane roof, HVAC, sprinkler,fire alarm, electrical, plumbing, site
lighting, and landscaping.
PURSUANT TO SECTION 1.07.6 OF THE MASSACHUSETTS STATE BUILDING CODE, I,
Kimberly M Masiu _ Associated Builders,Inc.
NAME FIRM
4 Industrial Drive,South Hadley MA 01075 (413)536-0021
ADDRESS PHONE NUMBER
MASS. REGISTRATION NO. 40474 BEING A REGISTERED PROFESSIONAL ENGINEER HEREBY
CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE, THE WORK CONCERNING:
X ARCHITECTURAL _ STRUCTURAL MECHANICAL
FIRE PROTECTION ELECTRICAL X_ OTHER(Site Civil)
HAS BEEN COMPLETED IN ACCORDANCE WITH PLANS, SPECIFICATIONS, APPLICABLE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ACCEPTABLE ENGINEERING
PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT.
I FURTHER CERTIFY THAT I HAVE PERFORMED THE PROFESSIONAL SERVICES AND
INSPECTIONS NECESSARY TO ENSURE THAT THE WORK WAS DONE IN ACCORDANCE WITH
THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT.
INTERIM REPORTS SUBMITTED PRIOR TO THE FINAL REPORT FORM A BASIS FOR AND ARE TO
BE CONSIDERED AN INTEGRAL PART OF THIS FINAL REPORT.
IT IS MY OPINION THAT THE WORK HAS BEEN SATISFACTORILY COMPLETED AND IS READY
FOR OCCUPANCY UPON FINAL APPROVALS FROM THE MUNICIPALITY.
�"AAA
OF MAS �
4
O Ki`:r2,L _Y Gn
Professional Seal & Signature
MASSACHUSETTS STATE BUILDING CODE
CONSTRUCTION CONTROL FINAL REPORT
DATE: January 7, 2014
BUILDING PERMIT#: BP-2013-0780
PROJECT TITLE: Proposed Automobile Dealership
PROJECT LOCATION: 347 King Street, Northampton, Massachusetts, 01060
NAME OF BUILDING: Country Hyundai
SCOPE OF PROJECT: Construction of a new 18,421sf automobile dealership. Included earthwork,
utility and sewer connections, stormwater management system,footings,
foundations, slab on grade, pre-engineered metal building structure,
exterior walls(composite panels,vertical metal panels, masonry block),
membrane roof, HVAC,sprinkler,fire alarm, electrical, plumbing, site
lighting, and landscaping.
PURSUANT TO SECTION 107.6 OF THE MASSACHUSETTS STATE BUILDING CODE, I,
Michael Puntin,PE Climate Heating& Cooling,Inc.
NAME FIRM
146 Hubbard Ave.,Pittsfield,MA 01201 413-684-5100
ADDRESS PHONE NUMBER
MASS. REGISTRATION NO. 46860 BEING A REGISTERED PROFESSIONAL ENGINEER
HEREBY CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE, THE WORK CONCERNING:
ARCHITECTURAL _ STRUCTURAL X MECHANICAL
FIRE PROTECTION _ ELECTRICAL _ OTHER(specify)
A1 1A PLEASE SEE THE ATTACHED LETTER FOR ANY PROJECT PUNCHLIST ITEMS OR
EXCEPTIONS.
HAS BEEN COMPLETED IN ACCORDANCE WITH PLANS, SPECIFICATIONS, APPLICABLE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ACCEPTABLE ENGINEERING
PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT.
I FURTHER CERTIFY THAT I HAVE PERFORMED THE PROFESSIONAL SERVICES AND
INSPECTIONS NECESSARY TO ENSURE THAT THE WORK WAS DONE IN ACCORDANCE WITH
THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT.
INTERIM REPORTS SUBMITTED PRIOR TO THE FINAL REPORT FORM A BASIS FOR AND ARE TO
BE CONSIDERED AN INTEGRAL PART OF THIS FINAL REPORT.
IT IS MY OPINION THAT THE WORK HAS BEEN SATISFACTORILY COMPLETED AND IS READY
FOR OCCUPANCY UPON FINAL APPROVALS FROM THE MUNICIPALITY.
�k,PytN Of SS
o� Mt .✓�� GGr�
oProfessional Seal & Signature
.46860
,e� GlST �
sStOHAIEN�'
MASSACHUSETTS STATE BUILDING CODE
CONSTRUCTION CONTROL FINAL REPORT
DATE: 01/6/2014
BUILDING PERMIT#: BP-2013-0780
PROJECT TITLE: Proposed Automobile Dealership
PROJECT LOCATION: 347 King Street, Northampton, Massachusetts, 01060
NAME OF BUILDING: Country Hyundai
SCOPE OF PROJECT: Construction of a new 18,421sf automobile dealership. Included earthwork,
utility and sewer connections, stormwater management system,footings,
foundations,slab on grade, pre-engineered metal building structure,
exterior walls(composite panels,vertical metal panels, masonry block),
membrane roof, HVAC, sprinkler,fire alarm,electrical, plumbing,site
lighting, and landscaping.
PURSUANT TO SECTION 107.6 OF THE MASSACHUSETTS STATE BUILDING CODE, I,
DAVID P KRAUSE 342 BRITTON STREET CHICOPEE ,MA 4.13-536-9222
Name ADDRESS PHONE NUMBER
MASS. REGISTRATION NO. 5233 BEING A LICENSED PROFESSIONAL HEREBY CERTIFY THAT I HAVE
PREPARED AND DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND
SPECIFICATIONS CONCERNING:
ARCHITECTURAL _STRUCTURAL _MECHANICAL
X FIRE PROTECTION _ELECTRICAL _OTHER(specify)
HAS BEEN COMPLETED IN ACCORDANCE WITH PLANS, SPECIFICATIONS, APPLICABLE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ACCEPTABLE ENGINEERING
PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT.
I FURTHER CERTIFY THAT I HAVE PERFORMED THE PROFESSIONAL SERVICES AND
INSPECTIONS NECESSARY TO ENSURE THAT THE WORK WAS DONE IN ACCORDANCE WITH
THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT.
INTERIM REPORTS SUBMITTED PRIOR TO THE FINAL REPORT FORM A BASIS FOR AND ARE TO
BE CONSIDERED AN INTEGRAL PART OF THIS FINAL REPORT.
IT IS MY OPINION THAT THE WORK HAS BEEN SATISFACTORILY COMPLETED AND IS READY
FOR OCCUPANCY UPON FINAL APPROVALS FROM THE MUNICIPALITY.
Signature
MASSACHUSETTS STATE BUILDING CODE
CONSTRUCTION CONTROL FINAL REPORT
DATE: January 7, 2014
BUILDING PERMIT#: BP-2013-0780
PROJECT TITLE: Proposed Automobile Dealership
PROJECT LOCATION: 347 King Street, Northampton, Massachusetts, 01060
NAME OF BUILDING: Country Hyundai
SCOPE OF PROJECT: Construction of a new 18,421sf automobile dealership. Included earthwork,
utility and sewer connections,stormwater management system,footings,
foundations, slab on grade, pre-engineered metal building structure,
exterior walls (composite panels, vertical metal panels, masonry block),
membrane roof, HVAC,sprinkler, fire alarm,electrical, plumbing, site
lighting, and landscaping.
PURSUANT TO SECTION 107.6 OF THE MASSACHUSETTS STATE BUILDING CODE, I,
Robert F. Griffiths Robt.W.Hall Consulting Engineers Inc.
NAME FIRM
540 Meadow Street Extension,Agawam,MA 01001 413-789-0960
ADDRESS PHONE NUMBER
MASS. REGISTRATION NO. 33161 BEING A REGISTERED PROFESSIONAL ENGINEER HEREBY
CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE, THE WORK CONCERNING:
ARCHITECTURAL _ STRUCTURAL _ MECHANICAL
FIRE PROTECTION _ ELECTRICAL X OTHER (specify)
(Plumbing Only)
HAS BEEN COMPLETED IN ACCORDANCE WITH PLANS, SPECIFICATIONS, APPLICABLE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ACCEPTABLE ENGINEERING
PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT.
I FURTHER CERTIFY THAT I HAVE PERFORMED THE PROFESSIONAL SERVICES AND
INSPECTIONS NECESSARY TO ENSURE THAT THE WORK WAS DONE IN ACCORDANCE WITH
THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT.
INTERIM REPORTS SUBMITTED PRIOR TO THE FINAL REPORT FORM A BASIS FOR AND ARE TO
BE CONSIDERED AN INTEGRAL PART OF THIS FINAL REPORT.
IT IS MY OPINION THAT THE WORK HAS BEEN SATISFACTORILY COMPLETED AND IS READY
FOR OCCUPANCY UPON FINAL APPROVALS UNICIPALITY.
-tti OF
R08ERT F.
GRIFFITHS `!�►
MECRAACAL
No.3316
MFG
T
Professional Seal & Signature
MASSACHUSETTS STATE BUILDING CODE
CONSTRUCTION CONTROL FINAL REPORT
DATE:
BUILDING PERMIT#: BP-2013-0780
PROJECT TITLE: Proposed Automobile Dealership
PROJECT LOCATION: 347 King Street, Northampton,Massachusetts,01060
NAME OF BUILDING: Country Hyundai
SCOPE OF PROJECT: Construction of a new 18,421sf automobile dealership. Included earthwork,
utility and sewer connections,stormwater management system,footings,
foundations,slab on grade, pre-engineered metal building structure,
exterior walls(composite panels,vertical metal panels, masonry block),
membrane roof, HVAC,sprinkler,fire alarm,electrical,plumbing,site
lighting,and landscaping.
PURSUANT TO SECTION 107.6 OF THE MASSACHUSETTS STATE BUILDING CODE, I,
41"f� /A W'� 1). L l ZvT/
NAME FIRM
ZZ ot.A FV12,M 121) /).wL nz� CIA y 3 2 9 f 9��;7
ADDRESS PHONE NUMBER
MASS. REGISTRATION NO. BEING A REGISTERED PROFESSIONAL ENGINEER
HEREBY CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE, THE WORK CONCERNING:
ARCHITECTURAL _ STRUCTURAL _ MECHANICAL
FIRE PROTECTION ELECTRICAL _ OTHER(specify)
HAS BEEN COMPLETED IN ACCORDANCE WITH PLANS, SPECIFICATIONS, APPLICABLE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ACCEPTABLE ENGINEERING
PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT.
I FURTHER CERTIFY THAT I HAVE PERFORMED THE PROFESSIONAL SERVICES AND
INSPECTIONS NECESSARY TO ENSURE THAT THE WORK WAS DONE IN ACCORDANCE WITH
THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT.
INTERIM REPORTS SUBMITTED PRIOR TO THE FINAL REPORT FORM A BASIS FOR AND ARE TO
BE CONSIDERED AN INTEGRAL PART OF THIS FINAL REPORT.
IT IS MY OPINION THAT THE WORK HAS BEEN SATISFACT RILY C MPLETED AND IS READY
FOR OCCUPANCY UPON FINAL APPROVALS FROM THEM NICIPA' TY.
Professional Seal &Signature
ABASSOCIATED BUILDERS, INC.
4INDUSTRIAL DRIVE-SOUTH HADLEY,MA 01075-(413)536-0021 FAX(413)536-0908
January 10, 2014
Louis Hasbrouck, Building Commissioner
City of Northampton
212 Main Street
Northampton, MA 01060
RE: Building Permit BP-2013-0780—Request for Certificate of Occupancy
Country Hyundai
347 King Street,Northampton, MA 01060
Dear Mr. Hasbrouck,
We are pleased to inform you that construction under the above referenced permit is substantially
complete pending final inspections by the municipality.
We have enclosed our latest field inspection report,photographs and final construction control
affidavits from all of the respective designers.
Please note that final landscaping will be completed as soon as possible, pending weather conditions.
We will notify you as soon as we have the work completed.
It has been a pleasure working with you and your staff.
Sincerely,
Kimberly M. Masiuk, P.E.
Project Engineer
cc: Carla J.Cosenzi,Cosenzi Automotive Realty,LP(1)
AB Project File(1)
tf
fF
j
•yy
c
{fi
Cy;
t
}
L'
c
N
O
T
2
,r J�
111)lill
��li
0
N
ti
O
O
� M v
h
^s V
n � i
S
t c.
Y
1
� r
ii 9
t
.m
j
h i--1-i J I
IN
#fill
a
+
f� A �� f:- 11111111
I t Yff ` o
tt t
n � �
3 s v
N
r
0
0
'm
v
c
T
2
r »
i ,
s{ 'Ina n s s{=!':i�s 'e in Faa
•4:1.. s.. ,n.
� k
look
a
-- AWAM
w
�r �
Aloof
MW IL
, _ a
��■ �' �� Ali �j'
i
x I
v. 3
W!!
Clft t _
in
a
SPECIAL INSPECTION FIELD REPORT
ASSOCIATED BUILDERS, INC Project Country Hyundai
4 INDUSTRIAL DRIVE Job Location 347 King Street, Northampton,MA
SOUTH HADLEY, MA 01075 Date 01-08-2014
(413)536-0021 Building Permit No. BP-2013-0780
PRESENT ON-SITE
Associated Builders, Inc. (Site Inspectors)—Kimberly Masiuk, Ryan Crandall, &Timothy Houle
Associated Builders, Inc. (General Contractor)—Paul Ciolek
JLC Services, Inc. (Cleaning Subcontractor)
Climate Heating &Cooling, Inc. (HVAC Subcontractor)
Dealer Solutions (Dealership Subcontractor)
Gustafson Electric(Electrical Subcontractor)
Broadway Office Interiors Owner's Furniture Subcontractor
WORK SUMMARY 99%Complete
Erosion Control Silt fence and silt sacks in use. Straw waddles and erosion control mats in use along
King Street. To remain until vegetation has been established in spring.
Earthwork Complete
Sanitary Sewer Complete
Storm Drainage Complete
Water Service Complete
Gas Service Complete
Electric Service Complete
Site Lighting Complete
Tel/Data Service Complete
Paving &Curbing Complete
Landscaping, Fencing & Final landscaping to be completed in spring as weather permits.
Si na e
Footings & Foundation Complete
Floors Complete
Exterior Concrete Complete
Steel Framing/Sheeting Complete
Carpentry Complete
Foundation Insulation Complete
Building Insulation Complete
Membrane Roof Complete
Exterior Wall Finishes Complete
Doors &Windows Complete
Interior Finishes Complete
Plumbing Complete
Fire Protection Complete
HVAC Complete
Electrical Complete
Fire Alarm Complete
Miscellaneous Owner's furniture installation in progress
NOTES &OBSERVATIONS
Construction under the above referenced permit is substantially complete pending final inspections by municipality.
ATTACHMENTS
Photographs
ENGINEER: DATE:
tf mberly M.M 7 wk,P.E.
ASSOCIATED BUILDERS, INC.
4INDUSTRIAL DRIVE•SOUTH HADLEY,MA 01075•(413)536-0021 FAX(413)536-0908
I �
0
January 08, 2014
Louis Hasbrouck, Building Commissioner
City of Northampton
212 Main Street
Northampton, MA 01060
RE: Building Permit#BP-2013-0780
Country Hyundai—Proposed Dealership
347 King Street,Northampton, MA
Dear Mr. Hasbrouck,
In accordance with the Massachusetts State Building Code requirements for Special
Inspections, we are providing you with our latest Field Inspection Reports and associated
documents.
Please call if you have any questions or concerns.
Sincerely,
Associated Builders,Inc.
Kimberly Masiuk, P.E.