Loading...
32C-163 (18) DEC 31 ► 1 K i lC h e l l & Austin 413-256-8521 inc. ..�. i Architecture and Community Design T y'Boltwood Walk, Amherst, Massachusetts 01002 OBSERVATION REPORT Project Randolph Place Phase of Construction Interior Finishes Date December 30 , 1986 Observed By Comments - There have been no changes to the exterior of the building since the last report . Third floor south Plumbing fixtures and vinyl flooring has been installed in the units . Third floor central : Sheet rock has been hung and 30% of taping has been completed . Third floor north : All work has been completed except finish paint , flooring , plumbing and electric fixtures and appliances . Second floor north : Sheetrock & taping have been completed . The ceilings have been sprayed . 25% of the trim work has been completed . Second Floor Central : The units have been sheet rocked . Second Floor South : 50% of plumbing fixtures & vinyl flooring has been installed First Floor South : 100% of trim & cabinet work has been installed . 20% of the painting has been completed . First Floor Central : 100% insulation completed . First Floor North : 100% of sheet rock has been installed , 80% of it has been taped . 30% of the ceilings have been sprayed . All of the work completed to date is to specifications and code .