COCA-COLA PLAN REVIEW (2)COCA-COLA Chilled Juice Addition 45 Industrial Drive Northampton, MA BUILDING PLAN REVIEW NO. 1 FOUNDATION ONLY Plan review comments based upon the following codes: Massachusetts State Building Code 780 CMR 7th Edition. PROJECT: COCA-COLA Chilled Juice Addition 45 Industrial Drive Northampton, MA  USE GROUP: Non-separated Mixed Use (S-1, F-2) UNLIMITED AREA BUILDING  CONSTRUCTION TYPE: II-B (noncombustible; unprotected) Submitted for review were the following: City of Northampton building permit application dated 7/6/10; letter from Troy L. Sandlin, RA Project Architect for Hixon dated 7/2/10; Project manual signed and sealed by registered Massachusetts professional engineer Mark S. Frey, William H. Wiseman, and architect Thomas J. Hellmann dated 7/2/10; sheets C1.1, C1.2, C21., C2.2, C3.1, C3.2, C4.1, C4.2, C5.1 signed and sealed by registered Massachusetts professional engineer William H. Wisemann dated 7/2/10; sheets AD1.1e, AD1.1F, AD1.1g alt, A00.1, A00.2, A00.3, A0.1e, A0.2, A1.1g, A1.1g alt, A3.0, A3.5, A4.1, A6.1, A6.3, A7.2 signed and sealed by registered Massachusetts architect Thomas J. Hellmann dated 7/2/10; sheets S0.1, S1.1e, S1.1g, S1.2, S2.1, S2.2e, S2.3, S3.1, S3.2, S3.3 signed and sealed by registered Massachusetts professional engineer William H. Wisemann dated 7/2/10; sheets MD1.1, M00.1, M00.2, M00.3, M00.4, M1.1e, M1.1g, m1.2e, M2.1, M5.5, ED1.1, E00.1, E00.2, E1.0, E4.1 signed and sealed by registered Massachusetts professional engineer Mark S. Frey dated 7/2/10. Building Code Review No. 1: Submit signed and sealed structural calculations by a Massachusetts registered professional engineer that indicate the design consideration for all dead, live, snow, wind, and seismic loads as well as all load combinations. Sections 110.8, 1603-1614 Submit steel shop drawings for all rebar placement. Section 106.1.1 Submit construction control affidavits that are signed and sealed by the responsible Massachusetts registered architects and engineers. Section 116 Depict open perimeter on site plan for the unlimited area building to ensure firefighting access is continuous around building. Section 507.2 Submit a list of special inspections on structural fill and concrete. Sections 1703 *NOTE: This permit is being issued with the understanding that it is at the holder’s risk with the building operation and without assurance that a permit for the entire building will be granted. Section 111.13 Based upon this review these plans are CONDITIONALLY APPROVED. Plans and specifications must be revised to correct deficiencies and resubmitted (three sets) for our final review and approval. A written description of the corrective action must be provided and identified by the corresponding comment number in the review. Following this procedure will expedite the re-review process and avoid delays in receiving final approval. Failure to identify a code violation during this process of the plan review DOES NOT give the permit applicant the right nor authority to violate the code. The final installation and construction must be in accordance with the code.