Loading...
220529_PlumbingHangersandSupportsCOCA-COLA NORTH AMERICA JOB NO. 7588.20 ISSUED: 070910 LINE ADDITIONS NORTHAMPTON, MASSACHUSETTS PLUMBING HANGERS AND SUPPORTS 220529 - 1 of 5 SECTION 220529 PLUMBING HANGERS AND SUPPORTS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. The other Contract Documents complement this Section. B. Division 01 – General Requirements and Section 220000 govern all Work of Division 22. C. Other specification sections (Divisions 02-14, 21, and 23-26) may contain requirements related to Division 22. 1.02 SUMMARY A. This Section includes the following hangers and supports for plumbing system piping and equipment: 1. Steel pipe hangers and supports. 2. Trapeze pipe hangers. 3. Metal strut framing systems. 4. Roof pipe supports. 5. Pipe positioning systems. 6. Equipment supports. B. Related Sections include the following: 1. Division 05 Section “Metal Fabrications” for structural-steel shapes and plates for trapeze hangers for pipe and equipment supports. 1.03 DEFINITIONS A. MSS: Manufacturers Standardization Society for The Valve and Fittings Industry Inc. B. MFMA: Metal Framing Manufacturers Association. COCA-COLA NORTH AMERICA JOB NO. 7588.20 ISSUED: 070910 LINE ADDITIONS NORTHAMPTON, MASSACHUSETTS PLUMBING HANGERS AND SUPPORTS 220529 - 2 of 5 1.04 PERFORMANCE REQUIREMENTS A. Design supports for single and multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system contents, and test water. B. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components. 1.05 QUALITY ASSURANCE A. Comply with MSS SP-58 “Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application, and Installation.” B. Comply with MFMA-3 “Metal Framing” and MFMA-102 “Guidelines for the Use of Metal Framing”. C. Welding: Qualify procedures and personnel according to AWS D1.1, “Structural Welding Code – Steel.” D. Welding: Qualify procedures and personnel according to the following: 1. AWS D1.1, “Structural Welding Code – Steel.” PART 2 - PRODUCTS 2.01 GENERAL A. Hangers and Supports Finish Types: 1. Stainless Steel: T304 Stainless Steel mill finish. 2. Galvanized, Metallic Coatings: Pre-galvanized (hot dip mill galvanized) in accordance with ASTM A653 or Hot dip galvanized (after fabrication) in accordance with ASTM A153. 3. Galvanized, Metallic Coatings: Electro-plated in accordance with ASTM B633. 4. Nonmetallic Coatings: Factory PVC coated. 2.02 STEEL PIPE HANGERS AND SUPPORTS A. Description: MSS SP-58, Types 1 through 58, factory-fabricated components. Refer to Part 3 “Hanger and Support Applications” article for where to use specific hanger and support types. COCA-COLA NORTH AMERICA JOB NO. 7588.20 ISSUED: 070910 LINE ADDITIONS NORTHAMPTON, MASSACHUSETTS PLUMBING HANGERS AND SUPPORTS 220529 - 3 of 5 2.03 TRAPEZE PIPE HANGERS A. Description: MSS SP-58, Type 59, shop- or field-fabricated pipe-support assembly made from structural-steel shapes with MSS SP-58 hanger rods, hardware, and U- bolts. 2.04 METAL STRUT FRAMING SYSTEMS A. Description: MFMA-3, shop- or field-fabricated pipe-support assembly made of steel channels and other components. 2.05 ROOF PIPE SUPPORTS A. Roof Pipe Supports, General: Manufactured assemblies of corrosion-resistant components to support roof-mounted piping without roof membrane penetration. B. Manufacturers: 1. MIRO Industries, Inc. 2. PHP Systems/Design. 3. Cooper B-Line. 4. Unistrut. 2.06 PIPE POSITIONING SYSTEMS A. Description: IAPMO PS 42, system of metal brackets, clips, and straps for positioning piping in pipe spaces for plumbing fixtures for commercial applications. 2.07 EQUIPMENT SUPPORTS A. Description: Welded, shop- or field-fabricated equipment support made from structural-steel shapes. PART 3 - EXECUTION 3.01 HANGER AND SUPPORT APPLICATIONS A. Specific hanger and support requirement are specified on drawings. B. Comply with MSS SP-58 for pipe hanger selections and applications that are not specified on the drawings. COCA-COLA NORTH AMERICA JOB NO. 7588.20 ISSUED: 070910 LINE ADDITIONS NORTHAMPTON, MASSACHUSETTS PLUMBING HANGERS AND SUPPORTS 220529 - 4 of 5 C. Refer to the “Plumbing Hanger and Support Material Schedule” on drawings for application of hanger and support materials. 1. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing. D. Comply with MFMA-102 for metal strut framing system selections and applications. E. Use pipe positioning systems in pipe spaces behind plumbing fixtures to support water distribution and drainage piping for plumbing fixtures. F. Equipment support applications are indicated on the drawings and/or equipment specifications. 3.02 TRAPEZE AND EQUIPMENT SUPPORT FABRICATION A. Cut, drill, and fit metal fabrications for trapeze pipe hangers and equipment supports. 1. Fabricate from ASTM A 36/A 36M steel shapes selected for loads being supported. B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations. C. Field Welding: Comply with AWS D1.1 procedures for shielded metal arc welding, appearance and quality of welds, and methods used in correcting welding work, and with the following: 1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. 2. Obtain fusion without undercut or overlap. 3. Remove welding flux immediately. 4. Finish welds at exposed connections so no roughness shows after finishing and contours of welded surfaces match adjacent contours. 3.03 HANGER AND SUPPORT INSTALLATION A. Steel Pipe Hanger Installation: Install hangers, supports, clamps, and attachments as required to properly support piping from building structure. B. Refer to the “Plumbing Pipe Hanger and Support Spacing Schedule” on drawings for hanger and support spacing. COCA-COLA NORTH AMERICA JOB NO. 7588.20 ISSUED: 070910 LINE ADDITIONS NORTHAMPTON, MASSACHUSETTS PLUMBING HANGERS AND SUPPORTS 220529 - 5 of 5 C. Trapeze Pipe Hanger Installation: Where several pipes can be installed in parallel and at the same elevation support piping on fabricated trapeze pipe hangers. D. Metal Strut Framing System Installation: Arrange for grouping of parallel runs of piping and support together on field-assembled metal framing systems. 1. Select for loads being supported. E. Roof Pipe Supports Installation: Assemble components and mount on smooth roof surface. Do not penetrate roof membrane. F. Pipe Positioning System: Install per manufacturer’s instructions. G. Install lateral bracing with pipe hangers and supports to prevent swaying. H. Support all piping from building structure. 1. Do not attach hangers and supports to metal deck. 2. Do not support piping from other pipes, ductwork or other equipment. I. Do not attach hangers and supports to metal deck. J. Load Distribution: Install hangers and supports so piping live and dead loads and stresses from movement will not be transmitted to connected equipment. K. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and so maximum pipe deflections allowed by ASME B31.1 for power piping and ASME B31.9 for building services piping are not exceeded. 3.04 ADJUSTING A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe. B. Trim excess length of hanger and support rods to 1-1/2 inches. 3.05 PAINTING A. Touch Up: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint on miscellaneous metal are specified in Division 09 Section “Field Painting.” B. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A 780. END OF SECTION