Loading...
Sec Construct Controls 2012-11-01Tk~uJ#~f1~ ~~p~~ Of'\t A~P~, R~1'>01 ~,f1~0210g-161g P~(6f}) 12/-'>200 Fu (611) 12/-~'>2 SECONDARY CONSTRUCTION CONTROL DOCUMENT (for Professional Engineers/Architects responsible for only a portion of a controlled project) Date: October 30, 2012 Project Title: Project Location: Northampton. Massachusetts Scope of Project: Additions and Renovations IN ACCORDANCE WITH SECTION 107.6.2.2 OF THE MASSACHUSETTS STATE BUILDING CODE, 8TH EDITION, I, Mark W. Felgate, P.E. MASS. REGISTRATION NO. 47531, BEING A REGISTERED PROFESSIONAL ARCHITECT/ENGINEER HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT ARCHITECTURAL STRUCTURAL MECHANICAL FIRE PROTECTION ELECTRICAL OTHER (specify) FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 107.6.2.2: 1. Review of shop drawings, samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit, and approval for conformance to the. design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards listed in Appendix B. PURSUANT TO SECTION 107.6.2.2, I SHALL SUBMIT PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE INSPECTION SERVICES DEPARTMENT. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF T E PROJECT FOR OCCUPANCY. . Signature J..t,.DY"d:{4...!::;~:ri'~~~===-MY COMMISSION. EXPIRES -'-"-;~"-f--'-'7-""'--'-'o'--!I Signature and Seal of registered professional: Tk~tJ;d.~H~ ~~Pdf.M:,~ DoN. A~Pkt, R~1101 ~,H~0210g-1~1g P~(~f}) ItJ-1200 Fu (~11) 12/-~12 SECONDARY CONSTRUCTION CONTROL DOCUMENT (for Professional Engineers/Architects responsible for only a portion of a controlled project) Dale: October 30, 2012 Project Title: Project Location: Northampton, Massachusetts Scope of Project: Additions and Renovations IN ACCORDANCE WITH SECTION 107.6.2.2 OF THE MASSACHUSETTS STATE BUILDING CODE, 8TH EDITION. I, Charles P. Sharples, P.E. MASS. REGISTRATION NO. 28940, BEING A REGISTERED PROFESSIONAL ARCHITECT/ENGINEER HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT ARCHITECTURAL STRUCTURAL X MECHANICAL FIRE PROTECTION ELECTRICAL OTHER (specify) FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH PLANS. COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 107.6.2.2: 1. Review of shop drawings. samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit, and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical. construction components requiring controlled materials or construction specified in the accepted engineering practice standards listed in Appendix B. PURSUANT TO SECTION 107.6.2.2. I SHALL SUBMIT PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE INSPECTION SERVICES DEPARTMENT. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY C ~PLETION A EAD N,E S OF FOR OCCUPANCY. y/ 30 ruSCRIBED AND SWOR.N TO BEFORE ME THIS _ DAY OF ~h-L) ,.2 0 I ::2­ ~j(~ . . . . MY COMMISSION EXPIRES!?j2071 •.20f f A PUBLIC· I' I Signature and Seal of regislered professional: