2013_02_07 - 10065 - Architect Field Report - 10065 - Architect Field Report.docx Page 1 of 2 TIME: 2:00PM CONDITIONS: SUNNY TEMPERATURE: 30’s PRESENT: Brad Hutchison, Charles Roberts (Kuhn Riddle Architects) John Averill (WBI) OBSERVATIONS: x Second floor exterior walls framed and sheathed. x Second floor trusses set and decked with plywood. x Second floor decking cut for post bearing as per structural engineer’s detail. x First floor exterior walls framed. x First floor shear walls framed. x Shear wall hold-downs installed. x Pre-installed fibercement panels behind ledgers visible at shear wall for fire-rated wall stair wall detail at floor- bearing conditions. x LVL girders set. x Insulation visible in window/door headers. x Contractor estimated that roof trusses would be set the middle of the following week. x Contractor showed architects mock-up of suggested modifications to exterior trim detail. Architects approved. TO Charles Miller DATE : 02/07/13 PROJECT: GATEHOUSE cc: Jonathan Wright (WBI) PROJECT NO. 10065 Dan Dodge (Opal Development) SUBJECT: FIELD REPORT FIELD REPORT #3 M:\10065 - Gate House\Documents\CA\Field Reports\2013-02-07 M:\10065 - Gate House\Documents\CA\Field Reports\2013-02-07 - 10065 - Architect Field Report.docx Page 2 of 2 2 Report by: Charles Roberts, AIA Project Manager/Architect Kuhn Riddle Architects