2013-03-04 - 10065 - Architect Field ReportM:\10065 - Gate House\Documents\CA\Field Reports\2013-03-04 - 10065 - Architect Field Report.docx Page 1 of 1 TIME: 1:00PM CONDITIONS: PARTLY CLOUDY TEMPERATURE: 40’s PRESENT: Brad Hutchison, (Kuhn Riddle Architects), Ryan Hellwig(Ryan S. Hellwig, PE) John Averill (WBI) OBSERVATIONS: x Roof trusses set and sheathed. x LVL ledger with Denseglass® cement board pre-installed at elevator shaft at second floor. x Application of roofing in progress on West side of building. x Installation of roof fascia, rake, soffit and soffit returns in progress and nearing completion. x Elevator shaft walls framed up to second floor ceiling level. x Windows had been delivered to job site. x Corrective measures as requested by structural engineer visible and documented photographically. Report by: Charles Roberts, AIA Project Manager/Architect Kuhn Riddle Architects TO Charles Miller DATE : 03/04/13 PROJECT: GATEHOUSE cc: Jonathan Wright (WBI) PROJECT NO. 10065 Dan Dodge (Opal Development) SUBJECT: FIELD REPORT FIELD REPORT #4 ! RYAN S. HELLWIG, PE ! STRUCTURAL ENGINEER ! FIELD REPORT March 5, 2013 Charles Roberts Kuhn Riddle Architects 28 Amity Street, Suite 2B Amherst, MA 01002 Re:The Gatehouse / Lot 18 Village Hill Road Northampton, Mass. Site Visit:3-4-13 Conditions:Partly sunny & low 40's Present:Brad Hutchison (Kuhn Riddle Architects) John Averill (Wright Builders - GC) The roof trusses were installed and sheathed, and roofing installation was in progress. The primary purpose of this visit was to observe the roof sheathing nailing patterns prior to finishing the roofing. The short-term goal now is to close in the building. Framing work on the inside is ongoing, and another site visit, to check the final condition of the framing, will be made in the future, once that work is complete. I also checked on the work done to correct deficiencies noted in my last visit (3-15-13). A piece of LVL has been put in place of the SPF upper wall plate. The additional three screws have been installed in each stud at the ledger at the elevator shaft for support of the roof trusses. Respectfully, Ryan Hellwig Massachusetts Professional Engineer #37300 - STRUCTURAL ! 28 ALDRICH STREET ! NORTHAMPTON, MA 01060 ! ! VOICE = 413-584-HLWG (4594) ! FAX = 413-584-HLWFax (4593) !