Loading...
24 Hampden ST Construction Set 02-14-1212 December 2011 - rev. per National Grid FOR CONSTRUCTION TABLE OF CONTENTS L1!!SITE X1!!DEMO PLAN A1.0!BASEMENT PLAN A1.1!FIRST FLOOR PLAN A1.2!SECOND FLOOR PLAN A1.3!ATTIC PLAN A1.4!ROOF PLAN A3.1!ELEVATIONS A4.1!SECTIONS A4.2!SECTIONS A5.1!DETAIL WALL SECTION - EXIST A5.2!DETAIL WALL SECTION - ADDITION A5.3 !AIR SEALING SCHEMATIC A9.1!WINDOW SCHEDULE AND DETAILS-Existing A9.2!WINDOW DETAILS - Addition S0!!FOUNDATION S1!!FIRST FLOOR FRAMING S2!!SECOND FLOOR FRAMING S3 !!THIRD FLOOR FRAMING S4!!ROOF FRAMING S5!!ADDITION ROOF FRAMING DETAILS V1!!VENTILATION PLANPlan Review: TRCH 06 Sept 2011 CONSTRUCTION MANAGEMENT FCM SmartBuild Steve Ferrari 103 Ryan Road Florence, MA 01062 413.588.8975 OWNERS Ruth Von Goeler and Kelly Slough 24 Hampden Street Northampton, MA 01060 ARCHITECT Coldham&Hartman Architects Project Manager: Andrew Webster 155 Pine Street Amherst, MA 01002 413.549.3616 VON GOELER / SLOUGH Deep Energy Retrofit Northampton, MA Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n EXISTING FOOTPRINT AREA OF ADDITION 38D-025 38D-024 HA M P D E N S T . BOTH LOTS OWNED BY VON GOELER / SLOUGHSOUTH SIDE SETBACK TO 38D-025 NOT A CONCERN, PER CONVERSATION BETWEEN LOUIS HASBROUCK ANDSTEVE FERRARI, CONSTRUCTION MANAGER - JULY 2011 ZONE URB SIDE SETBACK LINE @ 15'-0" ZONE URB SIDE SETBACK LINE @ 15'-0" Z O N E U R B R E A R S E T B A C K L I N E @ 2 0 ' - 0 " ZO N E U R B F R O N T S E T B A C K L I N E @ 2 0 ' - 0 " L1SITE PLANAND SCOPE 15 D E G MA G N E T I C NO R T H TRUESOUTH 3/32" = 1'-0" Scope of Work Scope exists in two parts: Renovation of Existing and construction of New Addition. Existing Building Re-roofing to include Asphalt Shingles, insulation on the slope to R-62 Above Grade walls to be insulated to the outside with 4" insulating board (R-26) and cavity insulation to be retained (R-13). Remove Existing Windows, install New Casement / Fixed Windows (3X FG) everywhere - R-5 or better. The Existing Brick Foundation to be excavated, water-proofed and air sealed, and insulated to the outside to R-20. Above Grade, the Foundation walls are to be insulated to a further R-20 with Interior spray-applied open cell foam. Below Grade, the Foundation walls will be remain visible. The basement floor will be retained as is. Re-locate Kitchen to South Side. Re-locate First Floor Bath to North side, add mudroom / coat room adjacent. New Addition New asphalt roof constructed and insulated in the cavity to R-41, on the outside with 4" polyiso to R-19.5, total = R-61 2x6 Above Grade Walls to be insulated with cellulose in the cavity and to the outside with 4" polyiso, total = R-44 New Casement / Fixed Windows (3XFG) to be installed, R-5 or better. Below Grade Walls to be insulated to the outside with closed cell spray foam, rated for ground contact and covered for insect resistance, to R-20. Inside the foundation, the sill/band and walls will be insulated above grade with open cell spray foam to a further R-20. Below Grade, they will be insulated to the outside only. New slab floor to be insulated below to R-10. New Living Space to be established at Basement Level and First Floor. New Master Bedroom to be created on Second Floor adjacent to new Second Story Laundry Heating Current Direct Vented Condensing Boiler has capacity to heat both Existing and New spaces. Distribution via hot water radiators. Cooling None to be provided. Ventilation To supply 80cfm continuous balanced ventilation To be provided by HRV or ERV unit installed in the insulated space above the Second Story Laundry. Design intent: supply bedrooms and kitchen; return bathrooms, laundry Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n UP 1 0 x 8 3 / 8 " = 7 ' - 0 " 1 2 3 4 5 6 7 8 9 10 CREATE NEW DOORWAY FROM EXIST BASEMENT DN 1 0 x 8 3 / 8 " = 7 ' - 0 " 5 6 7 8 9 10 UP 1 1 x 9 1 / 2 " = 8 ' - 8 " 1 2 3 4 CREATE NEW DOORWAY REMOVE CHIMNEY AND CHASE DN 1 1 x 9 1 / 2 " = 8 ' - 8 " 5 67891011UP 1 1 x 9 1 / 2 " = 8 ' - 8 " 1234 5 67891011 CREATE NEW DOORWAY TO MBR REMOVE EXISTING WALL-TUB TO REMAIN IN EXISTING LOCATION REMOVE CHIMNEY AND CHASE REMOVE EXISTING DORMER REMOVE ALL EXISTING EAVESSEE A5.1 REMOVE CHIMNEY TO FIRST FLOOR BASEMENTFIRST SECONDROOF X1DEMO PLANS 1/8" = 1'-0" 12 34 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n EXISTING WALL NEW WALL ALL DIMENSIONS TO FACE OF FRAMING A1.0BASEMENT FLOORPLAN 15 D E G MA G N E T I C NO R T H TRUESOUTH DN 1 3 x 8 1 / 8 " = 8 ' - 9 5 / 8 " 1 2 3 4 5 6 7 8 9 10111213 A3 PH 6'-0" 1'- 8 " 2'- 6 " A4 PH 6'-0" 1'- 8 " 2'- 6 " A1 PH 6'-0" 2'- 6 " 1'- 8 " A5 PH 6 ' - 0 " 1'-8" 2'-6" A2 PH 5 1/4" 2'- 0 3 / 4 " 9' - 0 " N1 6'-8" 2'-10" UP 1 0 x 8 3 / 8 " = 7 ' - 0 " 1 2 3 4 5 6 7 8 9 10 A5 . 1 1 A5.21 18'-6" 4'- 0 " 17 ' - 0 " 5'- 1 " 41/2"3'-4"6"8" 6" 3'- 4 " 41/2 " 6'- 1/2 " 5'- 5 " 10'-9" 1 A4.1 1 A4.1 approx. location - VIF approx. location - VIF approx. location - VIF REMOVEOBSOLETECHIMNEY TOFIRST FLOOR RE-ROUTE WASTE PIPEFROM 2ND FLOOR RE-ROUTE WASTE PIPEFROM 1ST FLOOR HOLD STAIR 6"OFF CONCRETEWALL EACHDIMENSION 2X6 STUD WALL CONTINUESINSULATE TO 1'-0" BELOWGRADE -SEE A5.1 2X6 STUD WALLSEE 4/A4.1 INSULATE BEHINDBOILER MOUNTINGPANEL OPEN CELL FOAM WITHINTUMESCENT PAINT -SEE A5.1 STRUCTURAL CONCRETECURB - SEE SOFOUNDATION PLAN 3/4" PV CONDUIT INSTALLEDIN PREP FOR FUTURE SOLARON ADDITION ROOF -COORDINATE WITH PVSQUARED LOCATE FUTURE RADON STACK 2X4 STUD WALL, HELD OFF CONCRETE 2"- SEE A5.2 PROVIDE FOR DEPTH OF CASING AT WALL-WINDOW INTERSECTION-COORD WITH WINDOWS ABOVE IFADJUSTMENT REQUIRED EXISTING BASEMENT NEW BASEMENT - REC ROOMSD 4 A4.1 4 A4.1 3 A4.1 3 A4.1 2 A4.1 2 A4.1 6 A4.1 6 A4.1 7 A4.17 A4.1 0 1/8" = 1'-0" 2 4 6 8 12 14 16 201018 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n EXISTING WALL NEW WALL ALL DIMENSIONS TO FACE OF FRAMING A1.1GROUND FLOORPLAN 1/8" = 1'-0" 15 D E G MA G N E T I C NO R T H TRUESOUTH DN 13 x 8 1/8" = 8'-9 5/8" 7 8 9 10111213 B1 PH 5'-2 1/2" 2'- 4 " 3'- 9 " C1 2 PH 4 ' - 6 " 2'-4" 2'-7 1/2" X1 3'-0" 6'-8" B1 0 PH 1 ' - 7 " 5'-1" 2'-9 1/2" B9 PH 3'-6" 3'- 2 " 6'- 0 " B8 PH 3'-6" 3'- 2 " 8'- 0 " B7 PH 3'-6" 3'- 2 " 2'- 2 1 / 2 " B3 PH 3'-2" 4' - 6 " 4'- 0 " B6 PH 2'-1 1/4" 5'- 0 " 9' - 0 " X2 2'- 1 0 " 6'- 8 " B2 PH 3 ' - 0 " 1'-10" 3'-8" N3 2'-8" 6'-8" N2 6'- 8 " 2'- 0 " B4 PH 3 ' - 8 " 3'-0" 3'-4" N4 6'- 8 " 1' - 6 " DN 1 0 x 8 3 / 8 " = 7 ' - 0 " 5 6 7 8 9 10 UP 11 x 9 1 / 2 " = 8 ' - 8 " 1 2 3 4 A5 . 1 1 1 A4.1 1 A4.1 4'- 0 " 17 ' - 0 " 5'- 1 " 16 ' - 1 " 6'-31/2"31/2"6'-71/2" 8'- 2 1/2 " 3'-0"2'-3"2'-9"3'-3"2'-0"1'-97/8"2'-1" 6"2'-5"1'-6" 8'- 7 5/8 " 3'- 0 " 3'- 0 " 4'-0"31/2"2'-0" 4'- 0 " 5'- 1 0 " 2'- 8 " 8'- 6 " 5'- 1 " 30'-21/2"18'-6" 4'-41/4"13'-4"9'-1"3'-5"6'-0"12'-6" 48'-81/2" 6'- 7 1/ 2 " 6'- 7 1/ 2 " 2'- 5 " 2'- 5 " 7'- 1/4 " 11 3/4 " 13 ' - 3 " 4'- 1 0 " 8'- 0 " 18 ' - 1 " 8'- 0 " 26 ' - 1 " 8'-51/2"4'-1/4"3'-71/2"14'-11/2"12'-0"6'-6" 30'-21/2"18'-6" 8'-51/2"7-7 3/8"14'-11/2"18'-6" 48'-81/2" 26 ' - 1 " 2'- 1 1 " 3'- 0 " 4'-6"2'-6" 7'-0"23/4" 1'-3" 4 A4.1 4 A4.1 3 A4.1 3 A4.1 2 A4.1 2 A4.1 6 A4.1 6 A4.1 7 A4.17 A4.1 SEAL EXISTINGDOOR OPENING PROVIDE NEW INT. DOOR REFRAME TOPROVIDE 3'-0"ACCESS 2X4 FRAMING @ 16"O.C.TIE HALF-WALL TO FLOORSTRUCTURE BELOW HALF-WALL align with pair above align withabove STEP DOWN - 6" ISLAND LOCATION(BUTCHERBLOCK?)CREATE PASS THROUGH / SHELVES? PV CONDUIT INSTALLED INPREP FOR FUTURE SOLAR ONADDITION ROOF LARGE FIELDSTONE STEP4/12 PORCH ROOFON BRACKETS KITCHEN DINING LIVING ENTRY EXISTINGSTAIR CLOAK ROOM COMPUTER BATH SD FINAL K I T C H E N L A Y O U T T O C O M E 0 1/8" = 1'-0" 2 4 6 8 12 14 16 201018 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n EXISTING WALL NEW WALL ALL DIMENSIONS TO FACE OF FRAMING A1.2SECOND FLOORPLAN 1/8" = 1'-0" 15 D E G MA G N E T I C NO R T H TRUESOUTH C4 PH 3'-4" 4'- 6 " 2'- 0 " C7 PH 3'-4" 3'- 0 " 2' - 0 " C6 PH 2'-10 1/8" 2' - 6 " 9'- 0 " C3 PH 3 ' - 0 " 1'-10" 3'-8" C8 PH 1'-11" 4'- 9 3 / 4 " 2' - 4 " C9 PH 1'-11" 4'- 9 3 / 4 " 2' - 3 1 / 2 " C10 PH 1'-11" 4'- 9 3 / 4 " 2' - 3 1 / 2 " C1 1 PH 1 ' - 1 1 1 / 4 " 4'-8 3/4" 2'-8" C1 PH 7'-6 1/8" 2'- 7 3 / 4 " 1'- 1 1 1 / 2 " C2 PH 2'-8" 2' - 4 " 4'- 0 " N9 2'-2" 6'-8" 6'-8" 2'-8" N5 6'- 8 " 2'- 8 " 2'- 1 0 " 6'- 8 " N6 6'-8" 2'-10" N8 3'-0" 6'-8" N7 3'-0" 6'-8" C5 PH 3 ' - 4 " 3'-0" 3'-4" DN 1 1 x 9 1 / 2 " = 8 ' - 8 " 5 6 7 8 9 10 11 B36 W UP 1 1 x 9 1 / 2 " = 8 ' - 8 " 1 2 3 4 5 6 7 8 9 10 11 A5 . 1 1 1 A4.1 1 A4.1 4 A4.1 4 A4.1 3 A4.1 3 A4.1 2 A4.1 2 A4.1 6 A4.1 6 A4.1 7 A4.17 A4.1 12'-0"6'-6" 8'- 6 " 2' - 8 " 5'- 1 0 " 31/2"2'-2"31/2"17 ' - 0 " 3'-117/8" 16 ' - 1 " 18'-6" 2'-1"10'-27/8"6'-6" 18'-6" 2'-111/4" 8'- 6 " 8'- 6 " BATHTUB INORIGINALLOCATION REMOVE CHIMNEY ALIGN DOOR TO WINDOW FIX RUSTY DISCHARGEAT SHOWER HEAD VERIFY EGRESS VERIFY EGRESSWITH MANUF. VERIFY EGRESS VERIFY EGRESS ALIGN WITH C4 PV CONDUIT INSTALLED INPREP FOR FUTURE SOLAR ONADDITION ROOF NOTE: ALLPENETRATIONS TOEXIT NORTH ROOF BEDROOM2(12'-4" x 11'-10")BEDROOM1(12'-4" x 11'-10") OFFICE / GUEST(7'-10" x 13'-2") BATHROOM CLOSET CLOSET LAUNDRY MAIN BEDROOM(11'-8"x16') C SD SD SD SDSD LI N E N CD 0 1/8" = 1'-0" 2 4 6 8 12 14 16 201018 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n EXISTING WALL NEW WALL ALL DIMENSIONS TO FACE OF FRAMING A1.3THIRD FLOORPLAN 1/8" = 1'-0" 15 D E G MA G N E T I C NO R T H TRUESOUTH D3 PH 2 ' - 7 1 / 8 " 2'-3" 2'-8" D1 PH 1'-9 5/8" 2'- 8 " 2'- 5 " D1 2 PH 0 " 1'-11 1/2" 2'-7 1/2" DN 1 1 x 9 1 / 2 " = 8 ' - 8 " 5 6 7 8 9 10 11 A5 . 1 1 1 A4.1 1 A4.1 4 A4.1 4 A4.1 3 A4.1 3 A4.1 2 A4.1 2 A4.1 6 A4.1 6 A4.1 7 A4.17 A4.1 ACTUAL DIMENSIONS ATTICWINDOWS UN-CHECKED - VIF 0 1/8" = 1'-0" 2 4 6 8 12 14 16 201018 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n EXISTING WALL NEW WALL ALL DIMENSIONS TO FACE OF FRAMING A1.4ROOF PLAN 1/8" = 1'-0" 15 D E G MA G N E T I C NO R T H TRUESOUTH 10'-4"2'-51/4"8'-0"9'-1/2" 30'-23/8" 12 ' - 0 " A C T U A L 9'- 2 " A C T U A L 7'-3/4"7'-3/4" RAFTERS -FILL WITH DENSE-PACKED CELLULOSEc. 11.25 INCHES @ R-3.3/INCH = R-37INSULATE TO THE OUTSIDE - 4" POLYISOCYANURATE FOAM BOARD4 INCHES @ R-6.25/INCH = R-25ROOF ASSEMBLY = R-62 RE-ROOF EXISTING ROOF STRUCTURE - 30 YEAR ARCHITECTURAL SHINGLESRE-ROOF TOWER - ASPHALT GUTTER AND DOWNSPOUT -EXACT LOCATION TO BECONFIRMED - DELIVER TO RAINBARREL BELOW (TYP. OF 3) GUTTER AND DOWNSPOUT - TOBE CONFIRMED- DIRECT AWAYFROM FOUNDATION NOTE: ALL PLUMBING PENETRATIONSTO EXIST ROOF NORTH SIDEDO NOT BREAK UP SOUTHERN ROOFPLANE - RESERVED FOR PVINSTALLATION MAINTAIN CLEAR SOUTHERN ROOF PLANE -ALL PENETRATIONS ON NORTH SIDE NEW ROOFEXISTING ROOF EXISTING FULL-SIZE 2"X5" @ 16" O.C. OKAY FOR 9' HORIZONTAL SPANEXISTING FULL-SIZE 2"X4" @ 16" O.C. OKAY FOR 7' HORIZONTAL SPAN INSPECTION AND REPAIRS REQUIRED FOR 6X6 DEFICIENT FRAMINGSCREW LEDGER TO WALL @ BIRDSMOUTH OF NEW VALLEY RAFTERS 0 1/8" = 1'-0" 2 4 6 8 12 14 16 201018 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n 16 ' - 7 1/ 2 " 17 ' - 9 " NEW ROOF OVER ENTIRE STRUCTURE NEW ROOFLINE AT OR BELOW EXISTING CROSS GABLE RIDGE CONFIRM OPERATION OF ALLWINDOWS BEFORE ORDER 10'-6" ALIGN HEAD HEIGHTS WITH WINDOWSAT EXISTING MAIN HOUSE GRADE FROM NEW DOOR AWAY TOGARDEN 17'-0" 5'-10"2'-8"2'-8"5'-10" 17 ' - 1 1/8 " A3.1Elevations1/8" = 1'-0" WESTNORTH EASTSOUTH 12 34 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n 8'- 0 " 7'- 1 0 " 7'- 1 0 1/ 2 " 1'- 0 " 8'- 7 " 1'- 0 " 3'- 3 " 4'- 8 7/ 8 " 7'- 2 3/4 " 15 ' - 1 0 " EXISTING FLOOR LEVEL CEILING HEIGHT AT SUNKEN LIVING ROOM CEILING HEIGHT AT BEDROOM FLAT CEILING CEILING HEIGHT AT BEDROOM EAVE WINDOW HEAD IN LRMATCHES HEAD INEXISTING FIRST FLOOR CEILING HEIGHTAT REC ROOM HEAD HEIGHTAT STAIR HEIGHT TO WINDOW - ASSUMES3.5" TRIM INSIDE CANT CEILING TO MAINTAIN CLEARANCEFOR BIKES (AND RIDERS) 7'- 1 " 8" 6'- 5 " 8" 7'- 1 0 1/ 2 " 1'- 0 " 8'- 7 " 1'- 0 " 4" 7'- 1 0 1/ 2 " 1'- 0 " 6" 8'- 1 " NEW SLAB - INSULATE BELOW(2) LAYERS 2" RIGID BOARD TO R-10 STEPPED FOOTING TO INCLUDE STEPFROM EXISTING BASEMENT TO NEWREC ROOM - DETAILS PER STRUCTURAL EXISTING SLAB TO REMAIN FLAT CEILING ATMASTER BEDROOM FLOOR AT ADDITIONLEVEL TO EXISTINGSECOND STORY FLOOR STEP DOWN TO NEWLIVING ROOM PLATFORM FOR NEWDOOR TO SOUTHSIDEPATIO / GARDEN NEW RIDGE TIED TOEXISTING SECONDARYRIDGE SEE S3 EXISTING DROP BEAM EXISTING FLOOR STRUCTURE TO REMAIN 3" 11 7/8" I-JOiSTS HORIZONTAL LAYERS#4 REBAR - 2 HIGH, 2 LOW RAISED COLLAR TIESSEE S5 FOR DETAILS 11 7/8" I-JOiSTS PARGE COATEXISTING BRICKFOUNDATION? SEE A5.1 FOR INSULATION /SLAB DETAIL 7'- 1 " 5'- 3 " 8'- 4 " 9" 8'- 6 " 9" 9'- 3 1/8 " 57/8 " SLAB CONCRETE MUST BE SOUND AND AT LEAST 4" THICKEXCAVATE AND POUR NEW SLAB AS REQUIRED BRACING WALL TO BES.Y.P. 2X6 #2 @ 16.O.C. FASTEN SOLE PLATE TO SLAB W/ 1/2"DIAMETER ANCHORS @ 8" O.C. FASTEN TOP PLATE TOJOISTS WITH (2) TIMBERLOKSCREWS AT 16" O.C. EXISTING BRICK FOUNDATION WALL SECTIONS 1/8" = 1'-0" STAIR AT ADDITIONSECTION AT MAIN HOUSE - BOWED WALL EXISTING BASEMENT - REC ROOM A4.1 ADDITION 34 12 C 2011 Coldham & Hartman Architects Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCH 17 Jan. 2012 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n 2/ S 4 CA R R Y S P R A Y F O A M O V E R S I L L T O UN D E R S I D E O F E X I S T I N G S U B F L O O R M A X . 3. 5 " O P E N C E L L S P R A Y F O A M T O R - 1 2 ST R I P E X T E R I O R B A C K T O EX I S T I N G B O A R D S H E A T H I N G (2 ) L A Y E R S 2 " F O I L - F A C E D P O L Y I S O ST A G G E R A N D T A P E A L L S E A M S 4 I N C H E S @ R - 6 . 5 / I N C H = R - 2 6 CO N T I N U O U S I N S U L A T I O N TY P A R O R S I M I L A R A S D R A I N A G E P L A N E VE R T I C A L S T R A P P I N G F O R S I D I N G 3 / 8 " M I N . FO R D R A I N A N G E A N D A S M E C H A N I C A L FA S T E N E R F O R H O U S E W R A P D R A I N A G E P L A N E SE E F A S T E N M A S T E R W H I T E P A P E R F O R FA S T E N E R S C H E D U L E O V E R E X T E R I O R F O A M EX I S T I N G S L A B T O B E R E T A I N E D IN S E C T S C R E E N FO R M E D M E T A L B R E A K SE L F - A D H E R E D M E M B R A N E O V E R E N T I R E E X I S T I N G R O O F ( A B ) EX I S T I N G S T R U C T U R E A N D I N T E R I O R FI N I S H E S U N D I S T U R B E D - A L L W O R K DO N E F R O M T H E E X T E R I O R RE M O V E A L L W I N D O W S IN S T A L L N E W C O N S T R U C T I O N W I N D O W S I N P L A N E WI T H T H E F A C E O F T H E O U T E R L A Y E R O F F O A M HO R I Z O N T A L F I B E R C E M E N T S I D I N G RE T A I N E X I S T I N G I N T E R I O R T R I M LO W E X P A N S I O N S P R A Y F O A M S E A L A N T (T Y P . ) ' P U R F I L L ' EX I S T I N G 2 " X 4 " @ 1 6 " O . C . + / - T O R E M A I N EX I S T I N G C A V I T I E S F I L L E D W I T H C E L L U L O S E T O R E M A I N 4" @ R - 3 . 3 / I N C H = R - 1 3 BA C K F I L L MA R K S T U D P O S I T I O N S T O P A N D BO T T O M O F W A L L B E F O R E I N S T A L L I N G FI R S T L A Y E R O F F O A M - S N A P L I N E F O R VE R T I C A L F U R R I N G S T R I P S TR I P L E - G L A Z E D F I B E R G L A S S C A S E M E N T W I N D O W S WH O L E W I N D O W U - V A L U E 0 . 2 0 O R B E T T E R WI T H N A I L I N G F I N S AD H E R E F I R S T L A Y E R P O L Y I S O T O SI L L A S A I R B A R R I E R WR A P P E E L A N D S T I C K I N T O E X I S T I N G RO U G H O P E N I N G EX I S T I N G R O O F R A F T E R S U P G R A D E D A S R E Q U I R E D PE R S T R U C T U R A L - S E E S 5 ST U D W A L L A N D 1 / 2 G W B T O P R O V I D E TH E R M A L B A R R I E R F O R F O A M P L A S T I C IN S U L A T I O N SE E 2 / S 0 F O R D E T A I L A T DE F O R M E D B R I C K W A L L PT F O O T I N G 3" C C S P F W I T H C O A T I N G R A T E D F O R GR O U N D C O N T A C T T O R - 2 0 FI L L C A V I T Y W I T H D E N S E P A C K E D C E L L U L O S E (C A V I T Y I N S U L A T I O N = 7 " @ R - 3 . 5 / I N C H = R - 2 4 . 5 ) (2 ) L A Y E R S 2 " P O L Y I S O F O A M B O A R D (1 ) L A Y E R S 1 . 5 " P O L Y I S O F O A M B O A R D 2X S T R A P P I N G F O R P L Y W O O D A T T A C H M E N T 1/ 2 " G W B T H E R M A L B A R R I E R F O R F O A M P L A S T I C EX I S T I N G F L O O R P L A N E I N S U L A T I O N T O R E M A I N CR E A T E 7 " C A V I T Y F O R I N S U L A T I O N A N D NA I L I N G S U R F A C E F O R G W B BR I C K T O B E C L E A N E D B E F O R E S P R A Y AP P L I C A T I O N , B R I C K S T O B E R E P L A C E D AS R E Q U I R E D NO T E : P R I M A R Y A I R B A R R I E R A T W A L L (F O A M B O A R D ) T A P E D T O P R I M A R Y A I R BA R R I E R A T R O O F (M E M B R A N E ) AP P L I E D E A V E (" C H A I N S A W R E T R O F I T " ) RE M O V E B O T T O M C O U R S E O F S H E A T H I N G AN D R E P L A C E W I T H N E W S T R I P F O R A I R CO N T R O L L A Y E R A D H E S I O N FI L L G A P W I T H C O N T I N U O U S B E A D S P R A Y F O A M CO N T I N U O U S B E A D C O N S T R U C T I O N A D H E S I V E SE A L S O N E L A Y E R T O N E X T ( A I R B A R R I E R ) EX I S T I N G B R I C K FO U N D A T I O N WI T H S T U D W A L L EX I S T I N G A B O V E GR A D E W A L L AB O V E G R A D E W A L L F O R N E W CO N S T R U C T I O N - S E E A 5 . 2 RO O F F O R N E W C O N S T R U C T I O N - SE E A 5 . 2 EX I S T I N G R O O F AS S E M B L Y HO T R O O F A S S E M B L Y : TO T A L R - V A L U E R - 6 2 EX I S T I N G W A L L A S S E M B L Y : TO T A L R - V A L U E R - 3 9 FO U N D A T I O N : R - 2 0 TO T A L E X T E R I O R R O O F I N S U L A T I O N = 5. 5 " @ R - 6 . 5 / I N C H = R - 3 7 . 5 3. 5 " O P E N C E L L S P R A Y F O A M (@ R - 3 . 5 / I N C H = R - 1 2 . 2 5 ) - N O TH E R M A L B A R R I E R R E Q U I R E D A T SI L L A N D B A N D EX I S T I N G B A S E M E N T - N O S T U D W A L L EX I S T I N G W A L L A T M A I N H O U S E A5.1DETAIL WALL SECTION-EXISTING 3/4" = 1'-0" 2 1 C 2011 Coldham & Hartman Architects Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCH 17 Jan. 2012 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n 2/ S 5 A9 . 1 S4 11 1/4 " 1'- 2 1/4 " CA R R Y O P E N C E L L S P R A Y F O A M OV E R S I L L T O U N D E R S I D E O F SU B F L O O R 1. 5 " F O I L F A C E D P O L Y I S O F U L L Y AD H E R E D T O N E W C O N C R E T E WA L L (2 ) L A Y E R S 2 " F O I L - F A C E D P O L Y I S O 4 I N C H E S @ R - 6 . 5 / I N C H = R - 2 6 CO N T I N U O U S I N S U L A T I O N TY P A R O R S I M I L A R A S D R A I N A G E P L A N E VE R T I C A L S T R A P P I N G F O R S I D I N G 3 / 8 " M I N . FO R D R A I N A N G E A N D A S M E C H A N I C A L FA S T E N E R F O R H O U S E W R A P D R A I N A G E P L A N E SE E F A S T E N M A S T E R W H I T E P A P E R F O R FA S T E N E R S C H E D U L E O V E R E X T E R I O R F O A M NE W S L A B IN S E C T S C R E E N RO O F S H E A T H I N G IN S T A L L A L L N E W W I N D O W S I N P L A N E W I T H T H E FA C E O F T H E O U T E R L A Y E R O F F O A M HO R I Z O N T A L F I B E R C E M E N T S I D I N G LO W E X P A N S I O N S P R A Y F O A M S E A L A N T (T Y P . ) ' P U R F I L L ' 2x 6 F R A M I N G CA V I T I E S F I L L E D W I T H C E L L U L O S E 5 . 5 " @ R - 3 . 3 / IN C H = R - 1 8 MA R K S T U D P O S I T I O N S T O P A N D BO T T O M O F W A L L B E F O R E I N S T A L L I N G FI R S T L A Y E R O F F O A M - S N A P L I N E F O R VE R T I C A L F U R R I N G S T R I P S TR I P L E - G L A Z E D F I B E R G L A S S C A S E M E N T W I N D O W S WH O L E W I N D O W U - V A L U E 0 . 2 0 O R B E T T E R WI T H N A I L I N G F I N S AD H E R E S H E A T H I N G T O B A N D J O I S T (P R I M A R Y A I R B A R R I E R ) WR A P P E E L A N D S T I C K I N T O E X I S T I N G RO U G H O P E N I N G 1/ 2 G W B T O P R O V I D E T H E R M A L BA R R I E R F O R F O A M P L A S T I C IN S U L A T I O N PT F O O T I N G 3" C C S P F W I T H C O A T I N G R A T E D F O R GR O U N D C O N T A C T T O R - 2 0 BA C K F I L L FI L L C A V I T Y W I T H C E L L U L O S E ( 1 1 . 2 5 " @ R - 3 . 7 / I N C H = R - 4 1 ) (1 ) L A Y E R 1 . 5 " , ( 1 ) L A Y E R 2 . 5 " P O L Y I S O F O A M B O A R D T O T O T A L 4" @ R - 6 . 5 / I N C H = R - 2 6 2X S T R A P P I N G F O R P L Y W O O D A T T A C H M E N T 1/ 2 " G W B FO R M E D M E T A L B R E A K 1/ 2 " H U B E R Z I P W A L L - T A P E A L L SE A M S A S P R I M A R Y A I R B A R R I E R IN S U L A T E B E L O W TO R - 1 0 O R B E T T E R RO O F S H E A T H I N G AS P H A L T R O O F S H I N G L E S HO U S E W R A P A S D R A I N A G E P L A N E 2x 4 O N F L A T P R O V I D E S W I R E C H A S E AN D F A S T E N I N G F O R G W B FI L L G A P W I T H C O N T I N U O U S B E A D S P R A Y F O A M NE W F O U N D A T I O N WI T H S T U D W A L L AB O V E G R A D E WA L L - N E W NE W R O O F AS S E M B L Y HO T R O O F A S S E M B L Y : TO T A L R - V A L U E R - 6 7 NE W W A L L A S S E M B L Y : TO T A L R - V A L U E R - 4 4 AB O V E G R A D E F O U N D A T I O N : R - 3 7 . 5 BE L O W G R A D E F O U N D A T I O N : R - 2 0 CO N T I N U O U S R O O F I N S U L A T I O N = 1 9 . 5 RO O F C A V I T Y I N S U L A T I O N = R - 4 1 A5.2DETAIL WALL SECTION-ADDITION 3/4" = 1'-0" WA L L A T A D D I T I O N 1 C 2011 Coldham & Hartman Architects Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCH 17 Jan. 2012 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n BE A D S O F ' P U R - F I L L " S T I C K Y " TO P R O V I D E A I R B A R R I E R A N D A D H E S I V E A T F O A M - W A L L A5.3AIR SEALINGSCHEMATICS AD D I T I O N EX I S T I N G 3/4" = 1'-0" 2 1 BLOWER DOOR PRESSURE TEST TO BE CONDUCTED AT COMPLETION OF AIR BARRIER, BEFORE INSTALLATION OF INTERIOR WALL FINISHES.DIAGNOSTIC FOG TESTING WILL BE CONDUCTED TO FIND FLAWS IN AIR BARRIER SYSTEMS PRESSURE TESTING TARGET: 0.1CFM50 / SQUARE FOOT OF SHELL TARGET CFM50 OF FINAL BLOWER DOOR:580CFM50 NOTE: AIR BARRIER AT EXISTING BUILDING TO BE FIRSTLAYER OF FOIL-FACED FOAM, TAPED AT ALL SEAMSAND TRANSITIONSON FOUNDATION WALL, THIS TRANSITIONS TO THEEXTERIOR SPRAYED FOAM INSULATION NOTE: AIR BARRIER AT ADDITION TO BE TAPEDSHEATHING AND EXTERIOR FOAM INSULATION ATFOUNDATION WALL C 2011 Coldham & Hartman Architects Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCH 17 Jan. 2012 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n TAPE OVER NAILING FLANGE HOUSE WRAP NAILING FLANGE IN PLANE OFHOUSEWRAP 2" BLOCKING IN PLANE OFEXTERIOR FOAM LAYER BLOCKING FOR TRIM BACKER ROD AND CAULK SEALWINDOW UNIT TO PICTURE FRAME 2X4 WRAP SELF-ADHEREDMEMBRANE FROMFOAM FACE, OVERBLOCKING, INTOEXISTING R.O. POSITIVE SLOPE AT HEAD FLASHINGALT: PROVIDE END DAMS EXISTING SHEATHING 2" BLOCKING BRICKMOULD WITH NAILING FLANGE CLAPBOARD - PITCH TO OUT TYVEK "FLEXWRAP" LAPS TOHOUSEWRAP ON FACE OF BLOCKING HOUSEWRAP FACE OF EXTERIOR LAYER OFRIGID FOAM IS PRIMARY AIRCONTROL LAYER LOW EXPANSION FOAMSPRAY SEALANT (TYP.) SHIM AT CORNERS AND MULLS 2" BLOCKING SELF-ADHESIVEFLASHING LAPSHOUSEWRAP ONFACE OF BLOCKING HOUSEWRAP SEAL FIRST LAYER OF FOAMTO WINDOW FRAMING VERTICAL STRAPPINGFOR SIDING BACKER ROD ANDCAULK SEALSWINDOW UNIT TOAIR BARRIER SELF-ADHESIVEFLASHINGFASTENS BACK TOEXISTING R.O. HEADJAMB SILLSCHEDULE A9.1SCHEDULE ANDEXISTING WINDOWDETAILS 3" = 1'-0" 12 34 ALL WINDOWS BY ACCURATE DORWINWHOLE WINDOW U-VALUE 0.02 OR LESS, CASEMENT, AWNING, AND FIXEDALL WINDOWS TO BE SUPPLIED WITH NAILING FLANGE C 2011 Coldham & Hartman Architects Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCH 17 Jan. 2012 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n TAPE OVER NAILING FLANGE HOUSE WRAP NAILING FLANGE IN PLANE OFHOUSEWRAP 2" BLOCKING IN PLANE OFEXTERIOR FOAM LAYER BLOCKING FOR TRIM BACKER ROD AND CAULK SEALWINDOW UNIT TO PICTURE FRAME 2X4 POSITIVE SLOPE AT HEAD FLASHINGALT: PROVIDE END DAMS SELF-ADHERED MEMBRANE WRAPSFROM R.O. TO DRAINAGE PLANE ATEXTERIOR FACE OF FOAM(WATER CONTROL) SELF-ADHERED MEMBRANE WRAPSFROM ZIP SHEATHING INTO R.O.(AIR CONTROL) TYVEK "FLEXWRAP" LAPS TOHOUSEWRAP ON FACE OF BLOCKING HOUSEWRAP PEEL AND STICK WRAPSBLOCKING TO R.O PEEL AND STICK TRANSITIONFROM SHEATHING TO R.O. SEAL CLAPBOARD TO SELF-ADHERED MEMBRANE CLAPBOARD - PITCH TO OUT LOW EXPANSION FOAMSPRAY SEALANT (TYP.) SHIM AT CORNERS AND MULLS 2" BLOCKING TAPE OVERNAILING FLANGE HOUSEWRAP VERTICAL STRAPPINGFOR SIDING BACKER ROD ANDCAULK SEALSWINDOW UNIT TOMEMBRANE WRAP SELF-ADHEREDMEMBRANE FROM FOAM FACETO R.O. FRAMING SELF-ADHEREDMEMBRANE WRAPS FROMAIR BARRIER ATSHEATHING INTO R.O. A9.2ADDITION WINDOWDETAILS 3" = 1'-0" HEADJAMB SILL 12 3 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n 18'-6" 4'- 0 " 17 ' - 0 " 5'- 1 " 41/2"3'-4"6"8" 6" 3'- 4 " 41/ 2 " 6'- 1/ 2 " 5'- 5 " 10'-9" 3S0 3S0 2S0 2S0 AREA OF EXISTING BOWED WALL EXISTING 10" DEEP CONCRETE FOOTERTHROUGH SLAB 8" CONCRETE WALLW/#4 BARS HORIZONTALLY - (2) HIGH (2) LOWON 16" FOOTING EXISTING BRICK FOUNDATION WALL -CONTINUOUS TO FOOTING EXCAVATE TO FOOTING ANDINSULATE ON THE OUTSIDE4" INSULATION BOARD TOPROVIDE R-20 - SEE A5.1 STEPPED CONCRETE FOOTINGSEE 3/S0 STEP FOUNDATION TO PROVIDEWOOD-FRAMED WALL HERE EXISTING BRICKBUTTRESS STEPS TO EXISTING BASEMENT- SEE 2/S0 3'-3" 1'- 5 " POUR CONCRETE CURB AS BUTTRESS FORUNDISTURBED BRICK FOUNDATION WALL EXISTING BRICK FOUNDATION WALL FLOOR SLAB EXISTING BASEMENT NEW SLABINSULATEBELOW 1:2 PITCH #4 HORIZONTAL (TYP OF 4) AS SHOWN #4 @ 18" O.C. BENT 900 AS SHOWN DRILL AND EPOXYINTO EXISTING BRICK 6'- 1 0 " 8'- 0 " 7'- 1 " CUT BACK EXISTING SLAB POUR NEW CONCRETE EDGE POUR NEW FOOTING BELOWEXISTING BRICK FOUNDATIONWALL AT DOOR JAMB - BOTHSIDES EXISTING BRICK FOUNDATIONWALL CUT TO PROVIDEDOORWAY FJ RUN PARALLEL TO EXISTING WALL NEW HEADER HERE NEW POURED CONCRETE STEP S0FOUNDATIONPLAN1/8" = 1'-0" FOUNDATION PLAN NEW CONCRETE BUTTRESS AT ADDITIONSTEPS AND DOOR AT TRANSITION TO EXISTING 0 1/8" = 1'-0" 2 4 6 8 12 14 16 2010181 23 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n A5 . 1 1 A5 . 1 3 A5.12 3'-1/8"4'-4" 5'- 3 " 4'-11" 15'-81/2" 1'-4" 1'- 4 " 18'-6" 16 ' - 1 1 " 1 A4.1 1 A4.1 ADD ADDITIONAL FLOOR JOIST ATNEW DOOR HOLE IN EXISTING BRICKFOUNDATION EXISTING 4X4 WOOD POST EXISTING 4" CONCRETE-FILLED STEEL EXISTING 6X8 DROP BEAM EXISTING 4" SCREW POST EXISTING BRICK COLUMN TRIMMER POST DOWNEXISTING BRICK CHIMNEY BASE (2) 1 3/4" X 9 1/4" LVL EX I S T I N G 2 X 8 F J EX I S T I N G 2X 8 F J EX I S T I N G 2X 8 F J 11 7 / 8 " TR U S S F J EN G ' D B Y MA N U F 4 A4.1 3 A4.12 A4.1 6 A4.1 7 A4.17 A4.1 S1FIRST FLOORFRAMING 1/8" = 1'-0" 15 D E G MA G N E T I C NO R T H TRUESOUTH 0 1/8" = 1'-0" 2 4 6 8 12 14 16 201018 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n 2x6 WALL FRAMING @ 16"O.C. (2) 1 3/4" X 11 7/8" LVL (2) 2x8 (2) 2x6EX I S T I N G F J TO R E M A I N EX I S T I N G F J TO R E M A I N 11 7 / 8 " TR U S S F J EN G ' D B Y MA N U F EXISTING WALL NEW WALL ALL DIMENSIONS TO FACE OF FRAMING S2SECOND FLOORFRAMING 1/8" = 1'-0" 0 1/8" = 1'-0" 2 4 6 8 12 14 16 201018 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n (2) 2x6 (2) 1 3/4" X 9 1/4" LVL 2X 8 R A I S E D C O L L A R T I E S @ 2 4 " O . C . - S E E S 5 EX I S T I N G F J TO R E M A I N EX I S T I N G F J TO R E M A I N EXISTING WALL NEW WALL ALL DIMENSIONS TO FACE OF FRAMING S3THIRD FLOORFRAMING 1/8" = 1'-0" 0 1/8" = 1'-0" 2 4 6 8 12 14 16 201018 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n 2X4 COLLAR TIES ABOVE FLOORFASTEN AT EACH STUD OF SIDE WALLS WITH 3 1/2" OR LONGER, TIMBERLOK ORSIMILAR (1) 1 . 7 5 " X 8 " L V L T O O N E SI D E O F E X I S T I N G 2 X 8 (2) 1. 7 5 " X 8 " L V L - O N E T O EACH S I D E O F E X I S T I N G 2 X 8 (2) 2X10 TYPUNDER ADDITIONCHEEK WALLS (2) 2X10 TYPUNDER ADDITIONCHEEK WALLS COLLAR TIERAFTER (1) 1 . 7 5 " X 8 " L V L T O O N E SI D E O F E X I S T I N G 2 X 8 (2) 1 . 7 5 " X 8 " L V L - O N E T O EA C H S I D E O F E X I S T I N G 2 X 8 (2) 1. 7 5 " X 8 " L V L - O N E T O EACH S I D E O F E X I S T I N G 2 X 8 EXISTING WALL NEW WALL ALL DIMENSIONS TO FACE OF FRAMING 111/4" 1'-3/4"111/4" 43/8 " 1'-21/4" 1'- 4 1/2 " BEVEL 2X12 BEVEL CUT 2X6 - ORGREATER FOR DEEPERPROFILE AT EDGE FASTEN 2X12 BACK TO STRUCTURE SHEATHING ADD 2" BLOCKING AS REQUIRED SECTION - EAVE PART 2X12 BEVELED - SEE SECTION 2X12 'LEDGER' PLAN - APPLIED EAVE S4ROOFFRAMING APPLIED EAVE - SECTIONS ROOF FRAMING APPLIED EAVE - PLAN 2 1 3 Von Goeler - Slough 24 Hampden Street Northampton, MA arw TRCHC2011Coldham & Hartman Architects 4 Nov. 2011 11-11 Date: Project No. REVISIONS Scale: Drawn: Checked:For C o n s t r u c t i o n DN 1 1 x 9 1 / 2 " = 8 ' - 8 " 5 6 7 8 9 10 11 SUPPLY FIRSTFLOOR KITCHEN40CFM CONT. RETURN BR2BELOWRETURN BR1BELOW 2ND FLOOR BADIRECT VENT TO EXTERIOR VENMAR EKO 1.5 HRV80CFM CONTINUOUSWITH 80CFM BOOST INTAKE HRV OUTLET ALL DUCTWORK WITHINCONDITIONED SPACE PROVIDE SOUND ISOLATION ATTIC SUPPLY SECONDFLOOR HALLWAY40CFM DRYER VENTTO OUTDOORS RETURN MBRBELOW- GRILL IN FLATCEILING ATCOLLAR TIES V1VENTILATIONPLAN1/4" = 1'-0" Date: Project: Dwg Ref: Scale: Hampden Street 09 Nov. 11 11-11 A1.0 1/4" DN 1 3 x 8 1 / 8 " = 8 ' - 9 5 / 8 " 1 2 3 4 5 6 7 8 9 10111213 A2 PH 5 1/4" 2'- 0 3 / 4 " 9'- 0 " A5.21 18'-6" 4'- 0 " 17 ' - 0 " 5'- 1 " 41/2"3'-4"6"8" 6" 3'- 4 " 41/ 2 " 6'- 1/ 2 " 5'- 5 " 10'-9" HOLD STAIR 6"OFF CONCRETEWALL EACHDIMENSION STRUCTURAL CONCRETECURB - SEE SOFOUNDATION PLAN 3/4" PV CONDUIT INSTALLEDIN PREP FOR FUTURE SOLARON ADDITION ROOF -COORDINATE WITH PVSQUARED LOCATE FUTURE RADON STACK 2X4 STUD WALL, HELD OFF CONCRETE 2"- SEE A5.2 PROVIDE FOR DEPTH OF CASING AT WALL-WINDOW INTERSECTION-COORD WITH WINDOWS ABOVE IFADJUSTMENT REQUIRED NEW BASEMENT - REC ROOM Sk1Rec Room Stair Date: Project: Dwg Ref: Scale: Hampden Street 09 Nov. 11 11-11 A1.0 1/4" DN 13 x 8 1/8" = 8'-9 5/8" 7 8 9 10111213 B6 PH 2'-1 1/4" 5'- 0 " 9'- 0 " X2 2'- 1 0 " 6'- 8 " B4 PH 3 ' - 8 " 3'-0" 3'-4" 1 A4.1 4'- 0 " 17 ' - 0 " 16 ' - 1 " 4'- 0 " 5'- 1 0 " 2'- 8 " 18'-6" 6'-0"12'-6" 26 ' - 1 " 3'- 0 " 4'-6"2'-6" 7'-0"23/4" 1'-3" 2X4 FRAMING @ 16"O.C.TIE HALF-WALL TO FLOORSTRUCTURE BELOW STEP DOWN - 6" LARGE FIELDSTONE STEP4/12 PORCH ROOFON BRACKETS LIVING Sk2Back Door Dims Date: Project: Dwg Ref: Scale: Hampden Street 3'-0" 3'- 8 " 2X8 ORIGINAL FRAMING 4 12 FLAT CEILINGBEYOND 2x6 LEDGER FASTENEDTHROUGH ONE LAYER OF FOAM 1X8 TWO PIECE METAL HEADFLASHING FOR ROOF Sk3 09 Dec. 2011 11-11 A1.1 3/4"=1'-0" Back Door Roof Date: Project: Dwg Ref: Scale: Hampden Street THESE RAFTERS AREDIFFICULT TO REACH FORDENSE-PACKING BUILD WALL HERE AND FILLCAVITY BEYOND WITH DPC Sk5 9 Dec. 2011 11-11 - NTS Insulation at OldRoof - New Roof Date: Project: Dwg Ref: Scale: Hampden Street VzqCoefe'n tltTlosl/l n't9u,u ,".') il .tv''l ,, a9'4P',\ t1l. r )/,iri <-1L Fop IMe e . rl )' 7f' )+^ oL- c-?%'{lf,avoi,l**tfv'€ ,rUJ,i\c, ry /{ .-rl 6 J Y-ln. s'vlt r --\. \50n '^-"1 --^lf-L(lr r -/./ Lwl I|--Il t/rJ '' Sk69 Dec. 2011 11-11 2/S4 ferrari scale Applied Eave with2x4s Date: Project: Dwg Ref: Scale: Hampden Street BACKER ROD W/CAULK AIR CONTROLTRANSITION FROMSHEATHING TO DOORFRAMING WITH SELF-ADHERED MEMBRANE EXTERIOR JAMB EXTENDER INSULATED INSWING DOOR Sk79 Dec. 2011 11-11 A1.1 1 /12" = 1'-0" Air Control Transitionat Door Date: Project: Dwg Ref: Scale: Hampden Street DN 11 x 9 1/2" = 8'-8" 5 6 7 8 9 10 11 SU P P L Y F I R S T FL O O R K I T C H E N 25 - 3 0 C F M C O N T . RE T U R N B R 2 BE L O W 15 c f m RE T U R N B R 1 BE L O W 15 c f m 2N D F L O O R B A DI R E C T V E N T T O E X T E R I O R VE N M A R E K O 1 . 5 H R V 80 C F M C O N T I N U O U S WIT H 8 0 C F M B O O S T IN T A K E (7 5 - 8 0 c f m ) HR V O U T L E T AL L D U C T W O R K W I T H I N CO N D I T I O N E D S P A C E PR O V I D E S O U N D I S O L A T I O N AT T I C SU P P L Y S E C O N D FL O O R H A L L W A Y 25 - 3 0 C F M DR Y E R V E N T TO O U T D O O R S RE T U R N M B R BE L O W - G R I L L I N F L A T CE I L I N G A T CO L L A R T I E S 30 c f m SU P P L Y A D D I T I O N BA S E M E N T 20 - 2 5 C F M RE T U R N A T T I C A I R 20 C F M C O N T . Ventilation Rates -updated Sk8 09 Jan. 2012 11-11 A1.3 NTS Date: Project: Dwg Ref: Scale: Hampden Street Sk9 18 Jan. 2012 11-11 A1.1 NTSStone Step Date: Project: Dwg Ref: Scale: Hampden Street CONTINUOUS BEAD CONSTRUCTION ADHESIVEBINDS FIRST LAYER POLYISO TO BREAK FORMED METAL BREAK FILL GAP WITH CONTINUOUS BEAD SPRAY FOAM CONTINUOUS BEAD CONSTRUCTION ADHESIVESEALS ONE LAYER TO NEXT CONTINUOUS BEAD ADHESIVEBINDS BREAK TO SHEATHING ADHERE SHEATHING TO BAND JOIST(PRIMARY AIR BARRIER) FORMED METAL BREAK FILL GAP WITH CONTINUOUS BEAD SPRAY FOAM CONTINUOUS BEAD CONSTRUCTION ADHESIVECONNECTS SHEATHING TO BREAK EXISTING WALL NEW WALL Sk1018 Jan. 2012 11-11 A1.1 1 1/2" = 1'-0" Air Control TransitionFoundation 1 2 Date: Project: Dwg Ref: Scale: Hampden Street 2'-0" 1'-2" 3S0 2S0 AREA OF EXISTING BOWED WALL EXISTING 10" DEEP CONCRETE FOOTERTHROUGH SLAB EXCAVATE TO FOOTING ANDINSULATE ON THE OUTSIDE4" INSULATION BOARD TOPROVIDE R-20 - SEE A5.1 EXISTING BRICKBUTTRESS REPLACE EXISTINGFOOTER WITH 24" X 24"CONCRETE PAD, 12" DEEP ADD NEW FOOTER 18" x 30",12" THICK, (3) #4 REBARLENGTHWISE, WITH 3" CLEARTO BOTTOM 4x4 PT POST S.Y.P #1NICE AND STRAIGHT 4x4 PT POST S.Y.P. #1NICE AND STRAIGHT SISTER EXISTING 2X8 OVERHEAD New Footings atExisting Sk11 30 Jan. 2012 11-11 A1.1 1/4" = 1'-0" Date: Project: Dwg Ref: Scale: Hampden Street 1'- 9 1/2 " 8" 1'- 4 " NEW JOIST NAILED TO FACE OF STUDS EXISTING BALLOON-FRAMED WALL 'SISTERED' LVL VALLEY RAFTERS EXISTING 2" X 4 3/4" JOISTS16" +/- O.C. EXISTING 2" X 8" VALLEY RAFTER EXISTING 2X BEARING BLOCK NEW BEARING PAD:(3) 1.75" LVL BLOCKS ON FLAT TOSPAN TWO WALL STUDS BELOW- LOAD PATH CONTINUOUS TO NEWCONCRETE PAD AT BASEMENT -SEE Sk11 "NEW FOOTINGS" EXISTING 2X FJ ~16" O.C. Sk1314 Feb. 2012 11-11 A1.3 3/4" = 1'-0" Valley Rafter Pad atAttic