32C-141 (59) q, Interior Finishes:
The four handicap accessiblCeiianeous accessories,
a• Th t for mis
are complete touch-up? etc, The upper floors are
painting touch-up, fixtures, kitchens, floors and
Progressing with trim,
painting to be completed.
5 , Mechanical:
a, Electrical -
1. Lighting, switching, receptacles and power
connections have been accfin r
tag wells. work is progressing
units and s tages for the remaining units on the
different s
upper floors.
emergency lighting and fire alarm
2• Exit lights s and erne operational*
and smoke detector systems are
b, plumbing
1, All plumbing lines anf ixt ale in the first floor
installed and are operation Work is progressing in
handicap accessible units. units on the
different stages for the remaining
upper floors.
C. H.V.A.C• - operational
1• The heating
and ventilating system is
with several areas still to receive final
balancing.
6. Life Safety and Handicap Access Issues:
materials and methods as required by the e of
a, Components, to meet the Construction Type
Contract Documents, Code, 780 CMR'
the Massachuseots State Building
ntractors.by been adhered
b. Handicap
access into the first floor apartments have
Codea
tructed tari the °
bee n designed and cons to meet 521
of Massachusetts Archit crfrom the rear of the
CMR• The second ramp exits
building still remain to be constructed.
e
2 of 2
NOV r c: •988 r {
November 21, 1988
CONSTRUCTION CONTROL REPORT NO. 1
Phase I, Building No. 3
Millbank Condominium Nov " 1
Millbank Lane
Millbank MA 01060
' DEFI OF R P`
NORTH, ". +S
1. Site Work:
a. Below grade utility work has been accomplished
including underground electric, water, sanitary and
drainage.
b. Landscaping, including seeding, shrubs, trees, etc.
remains to be done next Spring. This, however, does
not affect egress requirements. Driveways, parking and
sidewalks are operational.
2. Building Structure:
a. In the Summer of 1987 , unsuitable fill was removed and
structural fill brought in and compacted. Compaction
Tests taken by Allied Testing Company had to meet a 95%
Proctor.
b. Concrete footing and foundation walls were also
constructed in 1987 .
C. Wood framing commenced in the Spring of 1988. Walls,
floors and roofs have been completed according to
Contract Documents and have been in service for several
months now with no apparent deficiencies.
3 . Thermal and Moisture Protection:
a. Exterior doors and windows are installed, caulked and
weatherstripped.
b. Wall and roof insulation has been installed per
Contract Documents.
C. The single ply membrane roof is in service. Cap
flashing remains to be installed.
d. Portions of the west wall remain to be clapboarded and
trimmed out.
1 of 2
1 r
NOV x
SPECTIONS
i
Axr.�il'rLC�'s l c;. November 22 , 1988 .IAA.o,osa
Mr. Edward Tewhill
Building insp ector
City Hall Annex
Northampton, Massachusetts 01060
Re: Phase I ,
Building No. 3
Millbank Condominium
Millbank Lane
Northampton, Massachusetts 01Q60
Dear Ted:
Enclosed, please find the Contruction Control Report
for the above project as prescribed by the
State Building Code 780 CMR Section 127 •
Massachusetts
Respectfully yours,
ARCHITECTS INC.
n '� 6 `� f l°!✓�l
Chuck whitham
Cw/rk
enclosure
. O'�,MAStiACHUSF.TT50}060 (�13)58i-,2`i A L09CONCC?RD�iRCFT;fK1'vt!�1 13HA��1.btA�SiCHl'SE"i"TJOl 'O1 ifrl"i� =
A
.� l `r
_ �.
! i
TRANSMITTAL t y
NW
LETTER
AIA DOCUMENT G510
PROJECT: Mil lbank II, Building MA 01060 --ARCHITECT'S
(name, address) PROJECT NO:
Northampton, MA
DATE: November 22, 19 8 8
r �
TO: Britt Construction If enclosures are not as noted, please
inform us immediately.
Armory Street
Northampton, MA If checked below, please:
ATfN: Paul Britt ( ) Acknowledge receipt of enclosures.
L• -� ( ) Return enclosures to us.
WE TRANSMIT:
(X ) herewith ( ) under separate cover via
( ) in accordance with your request
FOR YOUR:
( ) approval ( ) distribution to parties ( ) information
( ) review & comment ( ) record
use ( )
THE FOLLOWING:
( ) Drawings ( ) Shop Drawing Prints ( ) Samples
( ) Specifications ( ) Shop Drawing Reproducibles ( ) Product Literature
( ) Change Order (X ) Report
COPIES DATE IREV.NO. DESCRIPTION ACTION
CODE
1 11/22/88 Construction Control Report for referenced
project
ACTION A. Action indicated on item transmitted D. For signature and forwarding as noted below under REMARKS
CODE B. No action required E. See REMARKS below
C. For signature and return to this office
REMARKS
COPIES TO: (with enclosures)
❑ ARCHITECTS INC.
❑ 78 Main Street
❑ Northampton, MA. 01060
file ❑
❑ BY: Chuck Whitham