32C-141 (59) q, Interior Finishes: The four handicap accessiblCeiianeous accessories, a• Th t for mis are complete touch-up? etc, The upper floors are painting touch-up, fixtures, kitchens, floors and Progressing with trim, painting to be completed. 5 , Mechanical: a, Electrical - 1. Lighting, switching, receptacles and power connections have been accfin r tag wells. work is progressing units and s tages for the remaining units on the different s upper floors. emergency lighting and fire alarm 2• Exit lights s and erne operational* and smoke detector systems are b, plumbing 1, All plumbing lines anf ixt ale in the first floor installed and are operation Work is progressing in handicap accessible units. units on the different stages for the remaining upper floors. C. H.V.A.C• - operational 1• The heating and ventilating system is with several areas still to receive final balancing. 6. Life Safety and Handicap Access Issues: materials and methods as required by the e of a, Components, to meet the Construction Type Contract Documents, Code, 780 CMR' the Massachuseots State Building ntractors.by been adhered b. Handicap access into the first floor apartments have Codea tructed tari the ° bee n designed and cons to meet 521 of Massachusetts Archit crfrom the rear of the CMR• The second ramp exits building still remain to be constructed. e 2 of 2 NOV r c: •988 r { November 21, 1988 CONSTRUCTION CONTROL REPORT NO. 1 Phase I, Building No. 3 Millbank Condominium Nov " 1 Millbank Lane Millbank MA 01060 ' DEFI OF R P` NORTH, ". +S 1. Site Work: a. Below grade utility work has been accomplished including underground electric, water, sanitary and drainage. b. Landscaping, including seeding, shrubs, trees, etc. remains to be done next Spring. This, however, does not affect egress requirements. Driveways, parking and sidewalks are operational. 2. Building Structure: a. In the Summer of 1987 , unsuitable fill was removed and structural fill brought in and compacted. Compaction Tests taken by Allied Testing Company had to meet a 95% Proctor. b. Concrete footing and foundation walls were also constructed in 1987 . C. Wood framing commenced in the Spring of 1988. Walls, floors and roofs have been completed according to Contract Documents and have been in service for several months now with no apparent deficiencies. 3 . Thermal and Moisture Protection: a. Exterior doors and windows are installed, caulked and weatherstripped. b. Wall and roof insulation has been installed per Contract Documents. C. The single ply membrane roof is in service. Cap flashing remains to be installed. d. Portions of the west wall remain to be clapboarded and trimmed out. 1 of 2 1 r NOV x SPECTIONS i Axr.�il'rLC�'s l c;. November 22 , 1988 .IAA.o,osa Mr. Edward Tewhill Building insp ector City Hall Annex Northampton, Massachusetts 01060 Re: Phase I , Building No. 3 Millbank Condominium Millbank Lane Northampton, Massachusetts 01Q60 Dear Ted: Enclosed, please find the Contruction Control Report for the above project as prescribed by the State Building Code 780 CMR Section 127 • Massachusetts Respectfully yours, ARCHITECTS INC. n '� 6 `� f l°!✓�l Chuck whitham Cw/rk enclosure . O'�,MAStiACHUSF.TT50}060 (�13)58i-,2`i A L09CONCC?RD�iRCFT;fK1'vt!�1 13HA��1.btA�SiCHl'SE"i"TJOl 'O1 ifrl"i� = A .� l `r _ �. ! i TRANSMITTAL t y NW LETTER AIA DOCUMENT G510 PROJECT: Mil lbank II, Building MA 01060 --ARCHITECT'S (name, address) PROJECT NO: Northampton, MA DATE: November 22, 19 8 8 r � TO: Britt Construction If enclosures are not as noted, please inform us immediately. Armory Street Northampton, MA If checked below, please: ATfN: Paul Britt ( ) Acknowledge receipt of enclosures. L• -� ( ) Return enclosures to us. WE TRANSMIT: (X ) herewith ( ) under separate cover via ( ) in accordance with your request FOR YOUR: ( ) approval ( ) distribution to parties ( ) information ( ) review & comment ( ) record use ( ) THE FOLLOWING: ( ) Drawings ( ) Shop Drawing Prints ( ) Samples ( ) Specifications ( ) Shop Drawing Reproducibles ( ) Product Literature ( ) Change Order (X ) Report COPIES DATE IREV.NO. DESCRIPTION ACTION CODE 1 11/22/88 Construction Control Report for referenced project ACTION A. Action indicated on item transmitted D. For signature and forwarding as noted below under REMARKS CODE B. No action required E. See REMARKS below C. For signature and return to this office REMARKS COPIES TO: (with enclosures) ❑ ARCHITECTS INC. ❑ 78 Main Street ❑ Northampton, MA. 01060 file ❑ ❑ BY: Chuck Whitham AIA DOCUMENT G810 TRANSNAITTAL LETTER • APR!L 1970 EDITION • .AI,-A • COPYRIGHT .� 1970 ONE PAGE THE Ar.,f.RICAN INSTITUTE OF ARCHITECTS, 1785 MASSACHUSETTS AVENUE, N.w.,wASWIG70N, D.C.20036