2009_01_26 N'Hamp Brew. Site Visit Notes ■ 16 Call Rd Colrain, MA 01340 ■ 413.624.9669 413.624.9635 fax ■ office@austindesign.biz Architect’s Site Visit Notes Construction Control Northampton Brewery - Lift & Dormer 11 Brewster Court Northampton, MA 01060 visit date: 26 January 2009 visit by: Chris Farley (CF), Austin Design Inc. copy to: Louis Hasbrouck (LH), Local Building Inspector Janet Egelston (JE), Owner Sean Jeffords (SJ), Beyond Green Construction Ryan Hellwig (RH), Structural Engineer Bill Austin (BA), Austin Design Inc. _____________________________________________________________________________ This site visit was made to check on the status of construction work and specifically to review the conditions at the new egress door from the mezzanine to the roof deck. The following items were noted - 1. The existing finish floor on the mezzanine is 8 1/4” below the finish floor on the roof deck and so an interior ramp is needed. CF will prepare a sketch showing the ramp, railings, required clearances, etc. and provide it to SJ and JE for review and comment prior to forwarding a copy to LH and the AAB. 2. The hinge side of the new egress door has been switched to allow for adequate latch side clearance – see attached sketch SK-1. 3. HVAC, roofing, trim, and interior finish work is ongoing. 4. SJ will be meeting with Thyssenkrupp on Tuesday, 27 January to review the lift requirements and installation. CF recommends SJ confirm the expected receipt date for the lift shop drawings. 5. BA is in contact with AccuFab and is scheduling an on-site meeting to review the proposed covered walkway structure. Items have been recorded as seen and understood by this writer. Please notify Chris Farley if you note any omission or if you have a correction. Unless notified to the contrary, these notes are assumed accurate and complete. Respectfully submitted, Chris Farley, Austin Design Inc., MA lic. # 11043