29 North Main Field Report 061509 M A R G O J O N E S Architects I N C O R P O R A T E D June 16, 2009 ARCHITECT’S FIELD REPORT No. 1 Clinical & Support Options Project #: 0901 29 North Main Street, Florence, MA Date: Monday, June 15, 2009, 2 PM Present: Joanne Jackson, Clinical & Support Options; George Dole, Margo Jones Architects. Observations and Discussion: 1. All sprinkler heads have been replaced with new code compliant heads. Additional sprinkler lines to closets have been run. Sprinkler heads have been installed in lowered ceilings at first floor bathrooms. 2. Damaged plaster ceilings at second floor where water damage occurred due to burst sprinkler pipes have been removed and replaced with gypsum wallboard ceilings. 3. New emergency lighting is installed throughout the building. Joanne noted that horns and strobes are being installed in every bedroom. 4. The fire alarm system is in the process of being installed. 5. Painting is ongoing. 6. Carpeting has been installed at some locations on the second floor. Ongoing. 7. Second floor long thin bathroom has shower stall installed. Joanne noted that the end portion of the bathroom is designated as storage only. Joanne noted the top of shower wall was lowered to allow full access on the sprinkler head water throw radius. Joanne noted the building inspector and fire department have reviewed the bathroom layout. 8. Vents are being installed in all bathrooms. 9. Rough plumbing is installed for laundry room at second floor, facing street. 10. Basement Review: Joanne noted all new electric outlets are GFI. A sump pump may be installed to remove water during major rain storms. 11. Electrical Service: The new service is 200 amps. New fluorescent lighting is being installed. 12. Attic Review: Sprinkler heads have been installed. 13. Kitchen cabinets are being installed. 14. Fire blocking has been installed in all exposed ceiling locations. 15. Photo documentation of work in progress was done. 16. Time line: Joanne noted that all contractors are scheduled to be substantially complete by June 25th, so that a temporary CO may be issued. Respectfully Submitted, George Dole Margo Jones, Architects cc: Karin Jeffers, Pat Lavelle, Joanne Jackson, Clinical & Support Options; Louis Hasbrouck, Local Inspector and Zoning Enforcement; file Field Report Page 1 of 1