Loading...
Doherty-02-09-11DW 9' - 9 3 / 4 " 12' - 2 3/4" 3' - 8 " 9' - 6 3/4" 9' - 8 " 5' - 8 1/4" 13 ' - 0 " c . o . 36"x80" full glass 48"x42" double pella casement 10 ' - 0 " 14' - 10 1/2" dw frame for recessed wall oven / micro ref Kitchen Laundry Dining Living Room Bath Guest Bedroom #2 Entry Master Bedroom New Deck Garage Mudroom 36" 36 " b i f o l d washer new LVL beam above (3) ply 1 3/4" x 9 1/2" (dining kitch) 30" vanity 9' - 1 0 " shelf & pole Bath1.Install 5/8" fire rated drywall to ceilings between first and second floor apartments. 2.All windows on first floor to be replaced. Notes refinish front door 5' - 1 3 / 4 " 32 " x 6 0 " t u b / s h o w e r 30" 7' - 8" jenn-air cooktop bookcase& column 10 ' - 0 " roll top desk 3' - 4 3 / 4 " Closet Closet existing plumbing chase 2 3 12 10 11 4 13 B1 1 5 6 install new fire rated door in new location D D D E E C C B B B A K I G G F L M A2 new fire rated door flooring to remain no work Up drywall bottom of stairwell patch existing wood floor as needed new window casing and baseboard wood floor tile floor ne w w i n d o w c a s i n g an d n e w b a s e b o a r d refinish existing wood floor new LVL beam above (3) ply 1 3/4" x 9 1/2" (living-kitch) wood transition strip existing beam above refinish existing wood floor wood floor tile floor tile floor tile floor tile floor DN save/install wainscotting Dn. 1' - 0 " 4' - 0 " correct decking Dn lally column and footing below new built up post 36 " x 4 8 " s h o w e r 14 install owner supplied cat door 15 install new fire rated door frame floor below install new fire rated door (w spring hinges)16 shelf & pole 24" vanity by owner 7 8 storage shelves 2' - 2"8' - 6 3/4"4' - 6 " 5' - 0 " 16'-0"x7'-0" overhead door new garage door with LVL beam above (2) ply 1 3/4" x 11 7/8" (garage heade) new built up post new built up post 17 dn.5' - 0 " dryer 2' - 6" spring hinges insulate half wall w/ cap 34" new 34" fire rated door A1 Install: pull down stair Brosco wood folding stair with (thermograd) Dn. Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: W r i g h t B u i l d e r s , I n c . Pr e p a r e d f o r t h e e x c l u s i v e u s e o f W R I G H T B U I L D E RS , I N C . s t a f f , s u b c o n t r a c t o r s , a n d s u p p l i e r s . Al l o t h e r u s e s p r o h i b i t e d . 48 B A T E S S T R E E T NO R T H A M P T O N , M A S S A C H U S E T T S 0 1 0 6 0 41 3 - 5 8 6 - 8 2 8 7 F A X 4 1 3 - 5 8 7 - 9 2 7 6 I N C O R P O R A T E D BU I L D E R S WR I G H T c Sheet No. 1/4" = 1'-0" 119 North Maple Street Northampton, MA First Floor Plan Addition Jack Doherty 09/13/10 10/01/10 12/09/10 12/21/10 12/30/10 01/31/11 02/09/11 A1 Review Review Review Review Review Review Review 1/4" = 1'-0"1 First Floor Plan 1/4" = 1'-0"2 Partial Second Floor Plan Door Schedule MarkWidthComments 12' - 8"existing door 23' - 0"screen door (spring hinges) 33' - 0"hinged door 43' - 0"full glass door 52' - 4"hinged door 62' - 6"hinged door 72' - 6"hinged door 82' - 6"hinged door 103' - 0"bifold door 112' - 0"hinged door 122' - 6"hinged door 132' - 6"hinged door 142' - 8"hinged door rated 152' - 8"hinged door rated 162' - 8"hinged door rated (spring hinges) 1716' - 0"overhead garage door A12' - 10"hinged door rated B12' - 6"hinged door rated Construction Set 7' - 2"7' - 2" 2x 8 p . t . 1 6 " o . c . (3) 2x8 p.t. beam (2) big foot footings EQ EQ EQ EQ (3) 2x10 beam (3) 2x10 beam new lally column and footing (typ of 3) install new vapor barrier and insulation at perimeter repair beam saw cut concrete floor for new footing add new footing and lally column below new post on first floor masonry repair by allowance Slab on grade for garage Basement Crawlspace new 18" storage shelves new 18" storage shelves install spray foam MSI @ basement perimeter priortoshelve install NN N N *install (4) new hopper windows 1/2" pressure treated plywood 2x4 legs (2) 2x4 pressure treated base 1' - 6" 1/2" particle board 1/2" particle board 2x4 shelf supports 2' - 0 " 2' - 0 " 2' - 0 " Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: W r i g h t B u i l d e r s , I n c . Pr e p a r e d f o r t h e e x c l u s i v e u s e o f W R I G H T B U I L D E RS , I N C . s t a f f , s u b c o n t r a c t o r s , a n d s u p p l i e r s . Al l o t h e r u s e s p r o h i b i t e d . 48 B A T E S S T R E E T NO R T H A M P T O N , M A S S A C H U S E T T S 0 1 0 6 0 41 3 - 5 8 6 - 8 2 8 7 F A X 4 1 3 - 5 8 7 - 9 2 7 6 I N C O R P O R A T E D BU I L D E R S WR I G H T c Sheet No. As indicated 119 North Maple Street Northampton, MA Basement Addition Jack Doherty 09/13/10 10/01/10 12/09/10 12/21/10 12/30/10 01/31/11 02/09/11 S1 Review Review Review Review Review Review Review 1/4" = 1'-0"1 Basement 3/4" = 1'-0"2 Detail Shelving Construction Set