Loading...
32C-141 (32) • Site Closeout — WPA, Form 5 — Order of conditions, Item #11 notes requirements. Owner/Contractor to coordinate request for site closeout. • Lead inspector scheduled for 7/07 at 1:00 p.m. • Schedule — Tight as usual — Meter bank to be complete next Wednesday; Desrosiers to coordinate fire alarm inspection requirements, i.e. key tags, maps, testing etc. • August 10�h or 12th tentatively set for Open House. • Next meeting, 7/09, 1:00 p.m. • Pencil Req. —7/16, 10:00 a.m. cc: Attendees Joanne Campbell, Valley CDC Tilman Lukas, MBL Housing & Development Derek Cavanaugh, MHIC Karen Leveille, HAP, Inc. Steve Vukovich, PDSI Nancy Sampson, MHP Ray Weaving, MHIC Anthony Patillo, Northampton Bldg. Com. Andy Pavlica, Engineering Design Associates Sandy Lake, Robert W. Hall Consulting Eng. Andrew Winter, Mass Housing 2 E E 'd c'990 ,ON H19-98t L MHOS � NOSIdU WUtZ :6 tool ' t Inr Carlson&schmittkaitects,Inc. Millbank Affordable Housing Job Meeting — July 2, 2004 Attendees: Patrick McCarthy, Valley Community Development Corporation Robert A. Desrosiers, Desrosiers & Son, Inc. Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc. 18 Michelman Progress o All kitchen counters and plumbing complete. o Paint: Five units complete, sixth today—door and trim finish remains. o All bath floors complete, resetting plumbing. o Site: Graded, ready for planting/paving. Desrosiers to submit substrate letter; vinyl siding manufacturer will not submit, interpretation. Doorbell estimate under review. Electrical change orders under review. Site Signage: Four site signs reviewed; 1. North parking lot—"Exit"with right arrow. 2. Speed bumps—"Exit"with left arrow. 3. East edge (near dumpster)—"Exit' with right arrow. 4. South entrance — ,,Exit" with left arrow. Signs to be white with black lettering/arrows, round poles, sign mounting height 6-6" AFF to center. Landscaping — John Walker to visit and review lawn for acceptance. General Notes Desrosiers to submit As-Builts/Owner Manuals; begin site close-out/site fence removable. Allowances— Desrosiers to submit close-out documentation for all apowances o Soil testing o Carpet o Hardware o Sheet vinyl o Temporary heat 556 telephone (413)786r6130jas www.carlson-acli+n 1 South Ehd Bridge Circle Agawam, s am,Maachusetfs 01001 (413)785iu.com 0� ,� . 1 ���� o� 0819-HL 111WH�S NOSl��i� iUV9� g b0 ' L I�� i CS Carlson&Schmitt Architects,Inc. J,04 it NS FAX COVER SHEET TO: Joanne Campbell, Valley CDC (413) 586-7521 Patrick McCarthy, Valley CDC (413) 586-7521 Tilman Lukas, MBL Housing & Development (413)747-8515 Karen Leveilie, HAP, Inc. (413) 731-8723 Bob Desrosiers, Desrosiers & Son,Inc. (413) 593-3335 Steve Vukovich, PDS1 (413) 587-0031 Derek Cavanaugh, MHIC (617)850-1106 Anthony Patillo, Northampton Bldg. Com. (413) 587-1272 Sandy Lake, Robert W. Hall Consulting Eng. (413) 789-3295 Andrew Winter, Mass Housing (617) 854-1028 Andy Pavlica, Engineering Design Associates (413) 788-0967 Nancy Sampson, MHr (517) 330-1919 Ray Weaving, MHIC (617)850-1106 FROM: Kevin Rothschild-Shea RE: Millbank Affordable Housing Job Meeting Minutes—July 2, 2004 DATE: July 7, 2004 Pages: 3 I South.Grid Brid9v Ode Agawam,MaBsochwetts 01001 (413)786.5'556 telephone (413)7566130 fax www.corLGon4chmitt.00m U1 'd Z990 *ON U19-98L iiINOS � NOSIdU P9i � 6 tG ' L * I �r