Loading...
32C-141 (31) Jun 28 04 02. 4 7p Robt W Hall Cons Engrs 413 789 3295 P- Robt, W. flail Consulting Engi eUs, Inc. � - __ _— -__— - �wssewn ee.�..aaa� -'- - S40 Meadow Street Extension,Ste.2 - - -- Agawam,Mits-sact e:!seiLl 01001-0002 -- ---— Phone:(413)789-0460 Fax:(413)829-3295 Report,No, Page 1 of Project Miilbank Affordabie Housing Job No. 003-3650 pay/Dat. Friday/June 25, 2004 Engineer Karlanne Bullens Location Northa«pton.MA Contractor Derosier and Son Subcontractor(s) JMS Mechanical Weather Sunny } Air Temp 65 10:30 AM PM Ground Conditions dry CempanylRep mot with: HVAC Plumbing Electrical Fire Protection Bob Derosier a l � Corn rents. 18 Michelman construction progress- Ductwork in the Attic was inspected and the worst of the installation has been corrected. There are still some long runs of flexible ductwork and the flexible return ductwork still has some tight turns, t-iowever, it should be noted that duet installation in the Attic is difficult and the system as installed should produce the scheduled airflows. It is our recorrimcndation that Attic ductwork be accepted if the systems can be balanced to within 5%of the scheduled alrtiow.Any areas with insufficient airflows wiii be redone by the Mechanical Sub-contractor, Filters have not been installed in the Attic units. too not run units until the filters are installed. Provide a complete set of spare filters as specified. Blown In insulation was observed behind two of the supply registers.Contractor shall clean the visible debris, i 1nnz-1A50_0t Ullharlk Affordable HousinglCorre06-25.2044 3850 HVAC COR.doc Page 1 tit 'd t f 90'ON 0£ 19-98t 11IAM ' NOSIPN AdD £ t001 6i 0i, General Motes • Desrosiers to submit As-Builts/Owner Manuals; begin site close-out/site fence removable. • Allowances - Desrosiers to submit close-out documentation for all allowances • Soil testing • Carpet • Hardware. • Sheet vinyl • Temporary heat • Site Closeout - WPA; Form 5 - Order of conditions, Item #11 notes requirements. Owner/Contractor to coordinate request for site closeout. 18 Miehelman -Close-out Punch Four units to be complete, 7/07/04, ready for lead reinspections by owner's agent, 7115104; last two units ready for lead reinspect- ions and punch list. cc: Attendees Joanne Campbell, Valley CDC Karen Leveille, HAP, Inc. Steve Vukovich, PDSI Nancy Sampson, MHP Ray Weaving, MHIC Anthony Patilio, Northampton Bldg. Com. Andy Pavlica, Engineering Design Associates Sandy Lake, Robert W. Hall Consulting Eng. Andrew Winter, Mass Housing z t%8 � b(90 �N Q8I9 981_ 111WH9S NbS�Hy� Nl�iBtr:� t00( '6( uo� Carlson&Sch-mid Architects,Inc. Millbank Affordable Housing Job Meeting —June 25, 2004 Attendees: Patrick McCarthy, Valley Community Development Corporation Robert A. Desrosiers, Desrosiers & Son, Inc. Titman Lukas, MBL Housing & Development Derek Cavanaugh, MHIC Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc. 18 Michelman • Progress • Five of six kitchen counters installed • Paint: primer complete, first coat underway • Kitchen floors complete; three of four bath floors complete • Vinyl siding —loose ends remain • Site —walk/grading at front yard undemmy • HVAC reinspections note attached • Water Heater — per Robert W. Hall all units appear to meet requirements of specifications and submittals. • Desrosiers to submit substrate letter; vinyl siding manufacturer will not submit, interpretation. • Carlson & Schmitt Architects submitted Maytag coin-op alternatives • Doorbell estimate submitted, Carlson & Schmitt Architect to forward to Robert W. Hall; alternate wireless doorbell not submitted for townhouse apartments at 34 • Kevin Rothschild-Shea and Pat McCarthy to coordinate site signage requirements/notation 34 Michelman • Fencing at rear lawn not specified • Landscape— Memo withstanding, project specification generally indicates: Section 2000 Paragraph 3.1 Construction Methods F— Irrigation H — Maintenance Minimum Requirements G — Acceptable Lawn —J. Walker to visit Paragraph 3.2 —Planting A.2 —Furnish mulch, fertilizer, etc. A.3 —Watering AA - Staking 1 South End Bridge Cttcle .Agawam,Massachuse(ts 01001 (413)7865536 telephone (413)786-6130fc x www.cartron-sohaitt.com V;`U 'd tr190 L 111i�N��S a NOSI��t� WdE� � ti00i �? ���' i C f000 Carlson&SchmittArchifects,Inc. i `4 P;!H('+`a'" 'Tl;),TSj ++t Mr^0 FAX COVER. SHEET TO: Joanne Campbell, Valley CDC (413) 586-7521 Patrick McCarthy, Valley CDC (413) 586-7521 Tilman Lukas, MBL Housing & Development (413) 747-8515 Karen Leveille, HAP, Inc. (413) 731-8723 Bob Desrosiers. Desrosiers & Son, Inc. (413) 593-3335 Steve Vukovich, PDSI (413) 587-0031 Derek Cavanaugh, MHIC (617) 850-1 106 Anthony Patillo, Northampton Bldg. Com. (413) 587-1272 Sandy Lake, Robert W. Hall Consulting Eng. (413) 789-3295 Andrew Winter, Mass Housing (617)854-1028 Andy Pavlica, Engineering Design Associates (413)788-0967 Nancy Sampson, MHP (617)854-1028 Ray Weaving, MHIC (617) 850-1106 FROM: Kevin Rothschild-Shea RE: Millbank Affordable Housing Job Meeting Minutes -June 25, 2004 DATE: June 29, 2004 Pages: 4 1 South End Bridge Circle Agawam,MaaaachwdU 01001 (913)7865556 telephone (413)786.6130 fax usuw.carlaonschmitt.eom t/l -d b190 -ON OE19-98C 11MUS � NOSIP) Mt:Z ti0067 '6Z ' unl�