32C-141 (26) CS \
• Porch Framing — Carlson & Schmitt Architects to investigate alternate
framing/wall ledger for first and second floor framing.
Schedule:
• Hopeful completion/move-in date of July 1, 2004.
Pencil Requisition Meeting — May 28, 2004 10:00 a.m.
Meetings. May 7th, May 14th, and May 21"at 9:00 a.m.
cc: Attendees
Joanne Campbell, Valley CDC
Ray Weaving,MHIC
Anthony Patillo, Northampton Bldg. Com.
Andy Pavlica,Engineering Design Associates
Sandy Lake, Robert W. Hall Consulting Eng.
Emily Holmberg, E.B.Holmberg &Associates
Gregory Kereakaglow, E.B. Holmberg & Assoc
Andrew Winter, Mass Housing
Nancy Sampson, MHP
3
tr%b ' d tNoION H19-98L iiMUS '3 NOS1dU kltl8 tOOZ * 8 ��ab
CS
HVAC
Miscellaneous repairs to duct connections to be completed; insulation to
be pulled back to allow for owner/engineer re-inspection.
Bathroom Flooring.
Unit#1: Provide Levelastic over existing flooring and new sheet vinyl
overlay with threshold (transition strip); caulk perimeter and
plumbing fixtures.
Unit#2: Adhere loose sheet vinyl at door opening; provide threshold
(transition strip), 14 round trim at tub/floor juncture; caulk perimeter
and fixtures.
Unit#3- Provide underlayment, new sheet vinyl flooring; threshold (transition
strip); caulk perimeter and fixtures.
Unit#4: No change
Unit#5 No change
Unit #6 Condition is dirty but intact, general contractor to price new sheet
vinyl floor over existing.
General contractor to provide abatement credit.
Landing 004, Stair 5, First Floor — Desrosiers indicates flooring/underlayment
needed here; maybe walk-off matt over underlayment?
Carpet Changes:
Unit # 2 and Unit #5: Bedroom 2; maintain existing wood floor, patch where
needed; submit carpet credit.
Bedroom 1 — Floor is rough sanded, patch where needed; carpet to remain in
contract.
Unit#3: Bedroom 2 —Can we patch wood floor and delete carpet?
Miscellaneous
• Common Laundry— Is coin-op still being pursued?
• Site Lights — Timer not specified; electrical contractor to install seven-day
programmable timer. Coordinate with Robert W. Hall for equipment
review/coordination.
• HVAC rebate being pursued by Pat McCarthy.
t/E ' d t900'ON 0119-98L IiIWS � NOSIM k lt: E ti00% 'E . ,,EW
F
Carlson&Schmitt Architects,Inc.
Millbank Affordable Housing
Job Meeting —April 30, 2004 (Revised)
Attendees: Patrick McCarthy, Valley Community Development Corporation
Robert A. Desrosiers, Desrosiers & Son, Inc.
Tilman Lukas, MBL Rousing & Development
Karen Leveille, HAP, Inc.
Steve Vukovich, PDSI
Derek Cavanaugh, MHIC
Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc.
34 Michelman
• Carpet installation underway at last townhouse.
Paint touch ups and final inspections scheduled for next week.
• Carlson & Schmitt Architect to punch remaining units at end of next week;
Desrosiers to complete original punch list, ready for re-punch.
• Wall sconces at townhouses look acceptable; Desrosiers to submit
additional fixture for re-tamping review with Patrick, and final approval.
Exterior Doors — Paint color to be: Benjamin Moore 1267
• Kevin Rothschild-Shea to review air barrier at gable ends.
18 Michelman
• Interior framing 95% complete
• Electrical rough complete in two apartments.
• Exterior doors installed.
• Roof near complete at south side.
• North porch demolition near complete.
• Plumbing/Gas rough complete.
• HVAC near complete.
Electrical
• Robert W. Hall memo circulated to general contractor; revised costs due in
middle of next week,
• Stan Russin at Robert W. Hall reviewed miscellaneous electric rough
question with Easthampton Electric; rear porch doors; change side wall
lights to ceiling.
1 South End 6rid8v Circle Agawam,Afa$sachusetts 01001 (413)786.6556 telephone (418)786-6130 fax www.wr&on�sohmitt.com
t/Z 'd t900 '0N 0E19-96t 111iWS 7 NOS1ddZ) Nldlt:E t00Z *E F E W
Carlson&Schmitt Architects,Inc.
air4r
- Y 2'004
FAX COVER SHEET
TO: Joanne Campbell, Valley CDC (413) 586=7521
Patrick McCarthy, Valley CDC (413)586-7521
Tilman Lukas, MBL Housing &Development (413) 747-8515
Karen Leveille, HAP, Inc. (413) 731-8723
Bob Desrosiers, Desrosiers & Son, Inc. (41.3) 593-3335
Steve Vukovich, PDSI (4.13) 587-0031.
Derek Cavanaugh, MHIC (617)850-1106
Anthony Patillo, Northampton$idg. Com. (413)'587-1272
Andy Pavlica, Engineering Design Associates (41.3) 788-0967
Sandy Lake, Robert W. Hall Consulting Eng.. , (413) 789-3295
Emily Holmberg, E.B.Holmberg& Associates (413) 529-2237
Gregory Kereakaglow, E.B. Holmberg & Assoc (413) 534-0884
Andrew Winter, Mass Housing (617) 854-1028
FROM: Kevin Rothschild-Shea
RE: Millbank Affordable Housing
Job Meeting April 30, 2004
DATE: May 3, 2004 Pages: 4
Job Meeting Minutes- Revised
Corrected:
Job Meeting Date to April 30,2004
Date of Pencil Requisition Meeting is May 281' at 1.0:00 a.m.
1 South,End Bridge Code Agawam,Maaeac1weto 01001 (913)786555601,phon* (913)T86b130jnz www.ear1aon4A-iU.co-