32C-141 (26) CS \ • Porch Framing — Carlson & Schmitt Architects to investigate alternate framing/wall ledger for first and second floor framing. Schedule: • Hopeful completion/move-in date of July 1, 2004. Pencil Requisition Meeting — May 28, 2004 10:00 a.m. Meetings. May 7th, May 14th, and May 21"at 9:00 a.m. cc: Attendees Joanne Campbell, Valley CDC Ray Weaving,MHIC Anthony Patillo, Northampton Bldg. Com. Andy Pavlica,Engineering Design Associates Sandy Lake, Robert W. Hall Consulting Eng. Emily Holmberg, E.B.Holmberg &Associates Gregory Kereakaglow, E.B. Holmberg & Assoc Andrew Winter, Mass Housing Nancy Sampson, MHP 3 tr%b ' d tNoION H19-98L iiMUS '3 NOS1dU kltl8 tOOZ * 8 ��ab CS HVAC Miscellaneous repairs to duct connections to be completed; insulation to be pulled back to allow for owner/engineer re-inspection. Bathroom Flooring. Unit#1: Provide Levelastic over existing flooring and new sheet vinyl overlay with threshold (transition strip); caulk perimeter and plumbing fixtures. Unit#2: Adhere loose sheet vinyl at door opening; provide threshold (transition strip), 14 round trim at tub/floor juncture; caulk perimeter and fixtures. Unit#3- Provide underlayment, new sheet vinyl flooring; threshold (transition strip); caulk perimeter and fixtures. Unit#4: No change Unit#5 No change Unit #6 Condition is dirty but intact, general contractor to price new sheet vinyl floor over existing. General contractor to provide abatement credit. Landing 004, Stair 5, First Floor — Desrosiers indicates flooring/underlayment needed here; maybe walk-off matt over underlayment? Carpet Changes: Unit # 2 and Unit #5: Bedroom 2; maintain existing wood floor, patch where needed; submit carpet credit. Bedroom 1 — Floor is rough sanded, patch where needed; carpet to remain in contract. Unit#3: Bedroom 2 —Can we patch wood floor and delete carpet? Miscellaneous • Common Laundry— Is coin-op still being pursued? • Site Lights — Timer not specified; electrical contractor to install seven-day programmable timer. Coordinate with Robert W. Hall for equipment review/coordination. • HVAC rebate being pursued by Pat McCarthy. t/E ' d t900'ON 0119-98L IiIWS � NOSIM k lt: E ti00% 'E . ,,EW F Carlson&Schmitt Architects,Inc. Millbank Affordable Housing Job Meeting —April 30, 2004 (Revised) Attendees: Patrick McCarthy, Valley Community Development Corporation Robert A. Desrosiers, Desrosiers & Son, Inc. Tilman Lukas, MBL Rousing & Development Karen Leveille, HAP, Inc. Steve Vukovich, PDSI Derek Cavanaugh, MHIC Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc. 34 Michelman • Carpet installation underway at last townhouse. Paint touch ups and final inspections scheduled for next week. • Carlson & Schmitt Architect to punch remaining units at end of next week; Desrosiers to complete original punch list, ready for re-punch. • Wall sconces at townhouses look acceptable; Desrosiers to submit additional fixture for re-tamping review with Patrick, and final approval. Exterior Doors — Paint color to be: Benjamin Moore 1267 • Kevin Rothschild-Shea to review air barrier at gable ends. 18 Michelman • Interior framing 95% complete • Electrical rough complete in two apartments. • Exterior doors installed. • Roof near complete at south side. • North porch demolition near complete. • Plumbing/Gas rough complete. • HVAC near complete. Electrical • Robert W. Hall memo circulated to general contractor; revised costs due in middle of next week, • Stan Russin at Robert W. Hall reviewed miscellaneous electric rough question with Easthampton Electric; rear porch doors; change side wall lights to ceiling. 1 South End 6rid8v Circle Agawam,Afa$sachusetts 01001 (413)786.6556 telephone (418)786-6130 fax www.wr&on�sohmitt.com t/Z 'd t900 '0N 0E19-96t 111iWS 7 NOS1ddZ) Nldlt:E t00Z *E F E W Carlson&Schmitt Architects,Inc. air4r - Y 2'004 FAX COVER SHEET TO: Joanne Campbell, Valley CDC (413) 586=7521 Patrick McCarthy, Valley CDC (413)586-7521 Tilman Lukas, MBL Housing &Development (413) 747-8515 Karen Leveille, HAP, Inc. (413) 731-8723 Bob Desrosiers, Desrosiers & Son, Inc. (41.3) 593-3335 Steve Vukovich, PDSI (4.13) 587-0031. Derek Cavanaugh, MHIC (617)850-1106 Anthony Patillo, Northampton$idg. Com. (413)'587-1272 Andy Pavlica, Engineering Design Associates (41.3) 788-0967 Sandy Lake, Robert W. Hall Consulting Eng.. , (413) 789-3295 Emily Holmberg, E.B.Holmberg& Associates (413) 529-2237 Gregory Kereakaglow, E.B. Holmberg & Assoc (413) 534-0884 Andrew Winter, Mass Housing (617) 854-1028 FROM: Kevin Rothschild-Shea RE: Millbank Affordable Housing Job Meeting April 30, 2004 DATE: May 3, 2004 Pages: 4 Job Meeting Minutes- Revised Corrected: Job Meeting Date to April 30,2004 Date of Pencil Requisition Meeting is May 281' at 1.0:00 a.m. 1 South,End Bridge Code Agawam,Maaeac1weto 01001 (913)786555601,phon* (913)T86b130jnz www.ear1aon4A-iU.co- b%l d b900 ON 0£ 10-98L 111WHOS ri NOSIaU k0t:'C t00£ -£ . AeN