32C-141 (22) oJe
• Finishes — Schedule submitted to Desrosiers & Son, sheet vinv_I floor
selections still outstanding.
79 Michelman
• Schedule critical here, General Contractor to gush for early fire alarm
installation and testing. Five units to be comnletert hPfnrP .lani inry gdth
structure and fire stonninn to hp- CmmnlAtA in firct flnnr „nit by 1-mni t- 7A r
General
• Dumpsier enciosure estimate in nand.
• Verizon — Robert W. Hall to chase Quentin at Verizon reo_ardina
availability of wiring in Michelman Avenue.
• Carlson & Schmitt Architects to keep pushing Northampton Fire Chief for
iigilVi (n & It7JJC1UIC 5)/StUFn nut approved).
• Buiier room change order proposal sut,mltted by Uesrosiers.
• Uesrosiers to submit price for two additional evergreens at north lot.
Next Meeting: December 29, 2003. 8:30 a.m.
cc: Attendees
Derek Cavanaugh, MHIC
Andrew Winter, Mass Housing
,♦„u,v„r , G\I/tV, t`IVIUIQII11.71V11 ouiiwrey l.Vllllilt„IU11+'rr
Ai-,Jy Powilua, EllynieCiiiiy Design /-associates
San6y Lake, Robert W. hail uonsuning engineers
Em11y Holmberg, LB. Holmberg & Associates
Gregory Kereakaglow, E.B. Holmbergi &Associates
Steve Vukovich, PDSI
2
E F ri UI6 ON i 11UNK) N0SINV,) AV9O' F U U -F,(7- 300
r
�J \ Carlson&Schmitt Architects.Inc.
Millbank Affordable Housing
Job Meeting — December 19, 2003
Attendees: Patrick McCarthy. Vallev Community Development Corporation
Joanne Campbell, Valley Community Development Corporation
Robert A. Desrosiers, Desrosiers & Son, Inc.
Karen Leveille, HAP, Inc.
Tilman Lukas, MBL Housing & Development
Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc.
Progress:
• Site Work
o Liqhtinq at north lot in place and on.
• 18 Michelman — Masonry at gable end complete, General Contractor to
allow for Architect inspection before siding is installed.
• 34 Michelman
o Gas pipinq 100% complete
o HVAC —Venting complete, except four townhouses.
o Electrical - Rough approximately 80% complete.
o Siding— 50% complete.
• 7A MichPiman
o Fire alarm inspection complete for north six units, move in to start
today.
o Demolition underway.
1 R AAirhoimnn
• Fire alarm contractor submittinq alternate addressable system for review.
34 MichPiman
• Fire Alarm contractor submitting alternate addressable system for review.
n v r%� ii C3 n Vin I I UA IAuz i dw iwvi k 1 vqulf u5 HVA0 unyn►uul review,
connection and iaorication do not appear to meet specirncation
requirements.
• Carlson & Schmitt Architects/Robert W. Hall to finalize townhouse ventina
ASAP
• Schedule — Generally looks two to six weeks behind schedule, Desrosiers
to update.
� v vU1 JVJ F L�aJ.��a 1 �nau�c� — va�wv�i lII va.iu�nu real a.�naCVW W IJJ61C IIIIgI
II ICI IIV
• t=ire Protection —z" maximum extension anowea at all ceiling locations.
• Miscellaneous HVAC shop drawings still not submitted.
1 South End Fridge Cirde Agawam,Masaachusetu 01001 (413)786.9556 telephone (413)786.6130 jas www.corlsor"chmice.com
E i GFIF CN Oglq-gR/ IIIVu 1� x NcS1NV' AlVgC :F Uj0" a�
. mac -/fie
r,
`^ f
L 1 \
bd1lSVlt OtJVilltlitlNl�HlltlG�S,IIIG.
FAX COVER SHEET
TO: Joanne Campneii, Vaiiey CDC (4'13) 586-752i
Patrick McCarthy, Valley CDC (413) 5t3b-/5;11
Tilman Lukas. MBL Housinq & Development (413) 747-8515
Karen Leveille, CIA°, Inc. (41'3) 7,,1-8723
mUL) uesrusiers, Liestu51C15 of OVII, II IL. t•+1JJ J�rJJJ J
Steve vuKovicn, vuJl t4 i37 5u1-w31
Derek Cavanaugh, MHIG (b1 /) tsou-11Ub
Anthonv Patillo. Northamoton Blida. Com. (413) 587-1272
rN11vy I cwa+u, `i.aJn.�.�iniy v�..'�y. ...� ----
Jd11UY L-c%r%G, 1\VVVIl vv. 119311 VvI1JUIMIlj fr.11y. ���•�J 1 VJ-..+�.��
Lrnuy r1vIrnUCry, G.D. r1VIt11UVIY OI /15JVti14MZC ``i 1J) OL�-LLJI
Gregory KereaKagiow, LA5. HOimoerCq 6, Assoc (4-13) U34-UOO'+
Andrew Winter. Mass Housino (b1 /1 &A-1UZk5
FRt)AA• Kavin Rnthcrhilri-ShAa
RF• Millhank Affordable Housina
Ink AAnotinn — rlcramhAr 1 U 7nnI
23 nnno pa 7
I So.th End Bridae Circle Azewam.Mamachuretu 01001 (413)7865556 telenho-e (413)75"130/az www.carllon-jchmctt.rnm
ni J OIC AI PIQ_ORI AiLl1C K �I�;CI*'fir) 61iHC C ^nn7