32C-141 (18) l Carlson&Schmitt Architects,Inc. FAX COVER SHEET TO: Joanne Campbell, Valley CDC (413) 586-7521 Patrick McCarthy, Valley CDC (413) 586-7521 Tilman Lukas, MBL Housing & Development (413) 747-8515 Karen Leveille, HAP, Inc. (413) 731-8723 Bob Desrosiers, Desrosiers & Son, Inc. (413) 593-3335 Steve Vukovich, PDSI (413) 587-0031 Derek Cavanaugh, MHIC (617) 850-1106 Anthony Patillo, Northampton Bldg. Com. (413) 587-1272 Andy Pavlica, Engineering Design Associates (413) 788-0967 Sandy Lake, Robert W. Hail Consulting Eng. (413) 789-3295 Emily Holmberg, E.B. Holmberg & Associates (413) 529-2237 Gregory Kereakaglow, P.B. Holmberg & Assoc (413) 534-0884 Andrew Winter, Mass Housing (617) 854-1028 FROM: Kevin Rothschild-Shea RE: Millbank Affordable Housing Job Meeting — November 14, 2003 DATE: November 18, 2003 Pages: 3 1 South£nd Bridge Circle Agawam,Uaatachusetu 01001 (413)7865556 telephone (413)786.6130 fax www,carWn-echmiti.com Fit FRZF uN [ ; i9 � II (u°N�iS x' QHIPO Mt QI 'O 'P ' 'UN A* Is • Dryer Venting — Flexible 4" not approved; Carlson & Schmitt Architects/Robert W. Hall to verify vent size; alternate configuration at first floor to extend to back of building in soffit along wall common to stair hall. • Bath Venting — Alternate horizontal/lateral venting allowed, 4" flex duct not approved. Robert W. !-fall to confirm size/configuration. Boilers — Combustion/make-up air as installed in townhouse 1 and 2 not approved. Vent pipe to allow for 2" clearance to combustibles, Robert W. Hall investigating alternate venting layout laterally between joists to sidewall in lieu of vertical installation. Combustion air, to changed to lateral/or vertical installed tight to party wall framing — Robert W. Hall to offer final layout. Submit vent pipe and termination shop drawings. • Hot Water Heater Venting — In order to avoid extended vertical vent at back side of building, change in water heater to power vent, with revised unit configuration —Carlson & Schmitt Architects/Robert W Hall to advise. • General Note — Coordination of all trades critical to minimize soffits/intrusions to finish space. All questions/conflicts to be reviewed with architect/engineering team before installation. ♦ interior f=inishes — Carpet and sheet viny! samples reviewed. Carpet with pad to be installed in units — Carlson & Schmitt Architects to obtain additional samples and layout color boards. Common area — upgrade to direct glue, maybe add 1/4' underlayment if required. 79 Michelman • Basement demolition complete, Desrosiers has tagged floor trusses for replacement. Northampton Building Inspector and Engineering Design Associates to confirm scope of required replacement. • Desrosiers has outlined the scope of work and is generating budget numbers. General • Carlson & Schmitt Architects to coordinate/detail dumpster enclosure. Pencil Requisition Meeting: November 21, 2003, 9.00 a.m. cc: Attendees Joanne Campbell, Valley Community Development Corporation Steve Vukovich, PDSI Derek Cavanaugh; MHIC Andrew Winter, Mass Housing Anthony Patillo, Northampton Building Commissioner Andy Pavlica, Engineering Design Associates Sandy Lake, Robert W. Hall Consulting Engineers Emily Holmberg, E.B. Holmberg & Associates Gregory Kereakaglow, E.B. Holmberg &Associates 2 ErS ' d 6$E6 aN OE l9 98L 11lWHOS ri NOSIPO iVVll Di EOo! 8l noN Carlson&Schmitt Architects;Inc. Millbank Affordable Housing Job Meeting — November 14, 2003 Attendees: Patrick McCarthy, Valley Community Development Corporation Tilman Lukas, MBL Housina & Development Robert A. Desrosiers, Desrosiers & Son, Inc. Karen Leveille, HAP, Inc. Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc. Progress: • Site Work o Curb— 100% complete. • Sidewalk bituminous base coat installed. • Timber guard rail installed. • I andscapinq at north lot perimeter installed. • 18 Michelman — No change. • 34 Michelman o Roof shingle 70% complete. o Window/door installation complete. o Plumbing waste and vent complete. o Heat piping 70% complete. o Sprinkler installation underway. • 79 Michelman o Alarm complete, awaiting inspections. o Miscellaneous items required: Map (Carlson & Schmitt Architects to update and forward to Well Design), key tag at knox box, fire extinguishers, and engraved plates! 18 Michelman • Desrosiers and Easthampton to highlight possible partial/early fire alarm installation. Carlson & Schmitt Architects/Robert W. Hall to review with Fire Chief and advise. 34 Michelman • Telephone Service — Verizon has located pole at north east end of building, south of sidewalk. • Fire Protection — Proceeding ahead of approved shop drawings. Piping in attic is not endorsed by design team, and pipe (in townhouses) near rear rafters is too tight to rafters to allow for suggested insulation levels. Coordination with mechanical venting is not complete: tie-in with probable soffit at second floor to be reviewed. Any/all work installed is at contractor's risk, 1 South End Bridge Circle Agawam,kfas8achusetta 01041 (413)7863336 telephone (413)786-6130 fax www.car4onschmict.com ?;i% 6RFF o QtlG 98L 11'uti S � NOS18VO itibii :il FAQ Hl �o�i