Loading...
32C-141 (16) f .y CS \ Carlson&Schmitt Architects,Inc. FAX COVER SHEET TO: Joanne Campbell, Valley CDC (413) 586-7521 Patrick McCarthy, Valley CDC (413) 586-7521 Tilman Lukas, MBL Housing & Development (413) 747-8515 Karen Leveille, HAP, Inc. (413) 731-8723 Bob Desrosiers, Desrosiers & Son, Inc. (413) 593-3335 Steve Vukovich, PDSI (413) 587-0031 Derek Cavanaugh, MHIC (617) 850-1106 Anthony Patillo, Northampton Bldg. Com. (413) 587-1272 Andy Pavlica, Engineering Design Associates (413) 788-0967 Sandy Lake, Robert W. Hall Consulting Eng. (413) 789-3295 Emily Holmberg, E.B. Holmberg & Associates (413) 529-2237 Gregory Kereakaglow, E.B. Holmberg &Assoc (413) 534-0884 FROM: Kevin Rothschild-Shea RE: Millbank Affordable Housing Job Meeting — 09/26/03 DATE: September 26, 2003 Pages: 3 1 South End Bridge Circle ABnwnm,hlassathvsetts 01001 (413)7865556 telephone (4121 786!130 jar www car4on-schmitt.com OLH ON JCiy �vL ��IVJ S e N'•JS1dvo HLu 4 i,y ;, .� vd r � General • Change Orders -- Upgrade kitchen cabinets — Carlson & Schmitt Architects to return with door and sample for color review. • Desrosiers to adjust siding quote (Change request #15 for $10,629.00), deducting vinyl upgrade at brick wall of 18 Michelman, carrying these costs separate— see Masonry Summary. • Desrosiers to submit interior flooring, finish schedule selections will be required soon. + John Walker provided planting screen layout for north parking lot — Kevin Rothschild-Shea to review white pines with John Walker. • John Walker to assist with details/size for dumpster enclosure. • Satellite Parking — Desrosiers to complete curb and make available to Millbank in one week. • Detention Ponds —Carlson & Schmitt to submit letter to E.B. Holmberg. Carlson & Schmitt Architects to draft Change Order #7 and forward for review--circulate Change Order numbers 5, 6, and 7 for signature. • Karen Leveille indicated schedule could not slide any further without serious problems with lenders. • Desrosiers seeking payment for July/August requisitions. • HFP submittal status — Carlson & Schmitt Architects to review with Robert W. Hall Consulting Engineers. Next Job Meeting: October 10, 2003, 9:00 a.m. Pencil Requisition Meeting: October 24, 2003, 9:00 a.m. cc: Attendees Anthony Patillo, Northampton Building Commissioner Andy Pavlica, Engineering Design Associates Sandy Lake, Robert W. Hall Consulting Engineers Emily Holmberg, E.B. Holmberg & Associates Gregory Kereakaglow, E.B. Holmberg & Associates Derek Cavanaugh, MHIC Joanne Campbell, Valley Community Development Corporation 2 ,, .d 9 Lnc Div uc19-9SL sllutir�5 e NOSlP` UtiVL� < < �007� vc Ud. 3o? L1i EC E �1WE Carlson&Schmitt Architects,Inc. I E„ 2 203 ; DEPT OF BUILDING INSPECTIONS Millbank Affordable Housing NnPlHA 100,ran T090 , .... .Job- eeting...September 2.6, 2003 _ ... Attendees: Patrick McCarthy, Valley Community Development Corporation Tilman Lukas, MBL Housing & Development Robert A. Desrosiers, Desrosiers & Son, Inc. Karen Leveille, HAP, Inc. Steve Vukovich, PDSI Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc. Progress: • Site Work o Precast curb—60% complete. • 18 Michelman— No progress. • 34 Michelman • First Floor: Exterior walls 95% complete: bearing stud wall framing 100% complete. • Second Floor: Bearing walls 50% complete; exterior 100% complete. • 79 Michelman o HVAC installation 100% complete and up and running. 18 Michelman • Desrosiers to offer breakdown for credit of masonry sealer and repointing, and proposed cost for furring and vinyl siding; with upgrade for vinyl shingle/trim as detailed. • Desrosiers to mobilize and schedule mason; final review/vinyl pricing to be wrapped up in the next few days. 79 Michelman • Hot Water Heaters — Robert W. Halls okayed proposed venting cost and specified combustion air vent size for door — metal grilles to be one each side of door. • PVC venting reviewed in two units — generally coordination between gas piping and venting lowers venting and the associated soffit more than is acceptable. All piping/venting to be installed as tight as possible to framing/finish ceiling. In both instances tighter coordination will allow for a 2" increase in final ceiling height; adjust as required. • B Fixtures — Robert W. Hall rejected interpretation, requesting additional cost. • Credit refrigerant lines — Robert W. Hall okayed credit. • Desrosiers to submit HVAC and plumbing owner's manual to Millbank, assist with operation questions. 19outh End B i4gs Circle Agawam,Massachusatb 01001 (413)7865556 telephone (413)7866130faz www.carlson,schmitt.com nn ninn .n�i nn � nri � q n n �� �I 4 � i rrr.? -n,. n cis ' d sac i� nn !9-nSL' 111'rdH0S e N10Slab'D UTvt7 : H �u�� �G ad.�