32C-141 (12) CSA
water heater alongside existing, or installing furnace first in order to
ensure residents do not lose hot water.
• Bob Desrosiers indicated sewer pump manhole (for 79 Michelman)
adjacent to new grading will have to be raised —will submit cost estimate.
General
• Kevin Rothschild-Shea to submit alternate vinyl shingle layout for 18 and
34 Michelman for Desrosiers to price.
• Pencil Requisition — Okay, except raised foundation at 34 to be billed to
100%.
• Carlson & Schmitt Architects to review/coordinate yard lights with
Desrosiers.
Next meeting: August 8'h
Pencil Requisition—August 29th
cc. Attendees
Anthony Patillo, Northampton Building Commissioner
Andy Pavlica, Engineering Design Associates
Sandy Lake, Robert W. Hall Consulting Engineers
Emily Holmberg, E.B. Holmberg & Associates
Gregory Kereakaglow, E.B. Holmberg &Associates
Joanne Campbell, Valley Community Development Corporation
2
S!E 'd b9 B 'ON Ofi9-98t 11 MIS i NOSIdU M t:Z SQOU
rr `
Carlson&Schmitt Architects,Inc.
Millbank Affordable Housing
Job.Meeting —July 25, 2003
Attendees: Patrick McCarthy, Valley Community Development Corporation
Tilman Lukas, MBL Housing & Development
Robert A. Desrosiers, Desrosiers & Son, Inc.
Karen Leveille, HAP, Inc.
Steve Vukovich, PDSI Commercial Building Solutions
Derek Cavanaugh, MHIC
Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc.
Progress:
• Site Grading
• Site Rough— 95%
• North Parking —95%
• Ponds— Rough Grading— 100%
• Drainage—Tie to "west pond" remains.
• 18 Michelman — Stair foundations complete and backfilled; downspout tie-
in underway.
34 Michelman — Engineered floor beams— in place.
18 Michelman
• Basement Masonry — Mason removed bricks at bulging wall — Desrosiers
to submit price to rebuild,
• Brick Gable — Desrosiers to submit cost adjustment for brick repair vs.
vinyl siding.
34 Michelman
• Desrosiers to submit estimate for additional paving/sidewalk due to raised
grade (at south parking in front of 79 Michelman).
• Desrosiers to submit estimate for dumpster pad.
• Kevin Rothschild-Shea reviewed vinyl fence/dumpster screen information;
John Walker will assist with specification/detail.
79 Michelman
• Fire Alarm — Meeting scheduled for 7/28/03 10:00 a.m. to review
requirements.
• Desrosiers outlined details involved with gas conversion; sub meeting
scheduled for 7/28/03 at 10:30 a.m. Contractors to consider installing
1 South End Bridge Circle Agoworn Mawachuaettu 01001 (413)786.5556 telephone (413)786-6130 fox www.cor4cn-5chlnitt.com
S/Z ,d ti9c8,ON OD9-98L il1AHOS 'i NOSIdU Ad€ :Z EOOZ '9Z ' 17
I L r ( C'� (
s ; ,'r -------
C
Fri I
arlson&Schmitt Architects,Inc.
? J U L 2 0,0 3
DFM OF Bull ON;IN7WO `5
r,rr(t7A to�'•nh
is ,�....-_._.....�
FAX COVER SHEET
TO: Joanne Campbell, Valley CDC (413) 586-7521
Patrick McCarthy, Valley CDC (413) 586-7521 .,
Tilman Lukas, MBL Housing & Development (413) 7478515
Karen Leveille, HAP, Inc. (413) 731-8723
Bob Desrosiers, Desrosiers & Son, Inc. (413) 593-3335
Steve Vukovich, PDSI (413) 587-0031
Derek Cavanaugh, MHIC (617) 850-1106
Anthony Patillo, Northampton Bldg. Com. (413) 587-1272
Andy Pavlica,'Engineering Design Associates (413) 788-0967
Sandy Lake, Robert W. Hall Consulting Eng. (413) 789-3295
Emily Holmberg, E.B. Holmberg& Associates (413) 529-2237
Gregory Kereakaglow, E.B. Holmberg &Assoc (413) 529-2237
FROM: Kevin Rothschild-Shea
RE: Millbank Affordable Housing
Job Meeting—07/25/03
DATE: July 25, 2003 Pages: 3