Loading...
32C-141 (12) CSA water heater alongside existing, or installing furnace first in order to ensure residents do not lose hot water. • Bob Desrosiers indicated sewer pump manhole (for 79 Michelman) adjacent to new grading will have to be raised —will submit cost estimate. General • Kevin Rothschild-Shea to submit alternate vinyl shingle layout for 18 and 34 Michelman for Desrosiers to price. • Pencil Requisition — Okay, except raised foundation at 34 to be billed to 100%. • Carlson & Schmitt Architects to review/coordinate yard lights with Desrosiers. Next meeting: August 8'h Pencil Requisition—August 29th cc. Attendees Anthony Patillo, Northampton Building Commissioner Andy Pavlica, Engineering Design Associates Sandy Lake, Robert W. Hall Consulting Engineers Emily Holmberg, E.B. Holmberg & Associates Gregory Kereakaglow, E.B. Holmberg &Associates Joanne Campbell, Valley Community Development Corporation 2 S!E 'd b9 B 'ON Ofi9-98t 11 MIS i NOSIdU M t:Z SQOU rr ` Carlson&Schmitt Architects,Inc. Millbank Affordable Housing Job.Meeting —July 25, 2003 Attendees: Patrick McCarthy, Valley Community Development Corporation Tilman Lukas, MBL Housing & Development Robert A. Desrosiers, Desrosiers & Son, Inc. Karen Leveille, HAP, Inc. Steve Vukovich, PDSI Commercial Building Solutions Derek Cavanaugh, MHIC Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc. Progress: • Site Grading • Site Rough— 95% • North Parking —95% • Ponds— Rough Grading— 100% • Drainage—Tie to "west pond" remains. • 18 Michelman — Stair foundations complete and backfilled; downspout tie- in underway. 34 Michelman — Engineered floor beams— in place. 18 Michelman • Basement Masonry — Mason removed bricks at bulging wall — Desrosiers to submit price to rebuild, • Brick Gable — Desrosiers to submit cost adjustment for brick repair vs. vinyl siding. 34 Michelman • Desrosiers to submit estimate for additional paving/sidewalk due to raised grade (at south parking in front of 79 Michelman). • Desrosiers to submit estimate for dumpster pad. • Kevin Rothschild-Shea reviewed vinyl fence/dumpster screen information; John Walker will assist with specification/detail. 79 Michelman • Fire Alarm — Meeting scheduled for 7/28/03 10:00 a.m. to review requirements. • Desrosiers outlined details involved with gas conversion; sub meeting scheduled for 7/28/03 at 10:30 a.m. Contractors to consider installing 1 South End Bridge Circle Agoworn Mawachuaettu 01001 (413)786.5556 telephone (413)786-6130 fox www.cor4cn-5chlnitt.com S/Z ,d ti9c8,ON OD9-98L il1AHOS 'i NOSIdU Ad€ :Z EOOZ '9Z ' 17 I L r ( C'� ( s ; ,'r ------- C Fri I arlson&Schmitt Architects,Inc. ? J U L 2 0,0 3 DFM OF Bull ON;IN7WO `5 r,rr(t7A to�'•nh is ,�....-_._.....� FAX COVER SHEET TO: Joanne Campbell, Valley CDC (413) 586-7521 Patrick McCarthy, Valley CDC (413) 586-7521 ., Tilman Lukas, MBL Housing & Development (413) 7478515 Karen Leveille, HAP, Inc. (413) 731-8723 Bob Desrosiers, Desrosiers & Son, Inc. (413) 593-3335 Steve Vukovich, PDSI (413) 587-0031 Derek Cavanaugh, MHIC (617) 850-1106 Anthony Patillo, Northampton Bldg. Com. (413) 587-1272 Andy Pavlica,'Engineering Design Associates (413) 788-0967 Sandy Lake, Robert W. Hall Consulting Eng. (413) 789-3295 Emily Holmberg, E.B. Holmberg& Associates (413) 529-2237 Gregory Kereakaglow, E.B. Holmberg &Assoc (413) 529-2237 FROM: Kevin Rothschild-Shea RE: Millbank Affordable Housing Job Meeting—07/25/03 DATE: July 25, 2003 Pages: 3 1 South End Bridge Circle Agawam,Mamachusstts 01001 (413)7865556 telephone (413)786,6130jaa www.corlson schmit1com 8,/l d t9N '0N H[9-98C lifWHOS i NOSIdU Md t:Z H 'q'( Tr