Loading...
32C-141 (10) CS \ Carlson&Schmitt Architects,Inc. FAX COVER SHEET TO: Joanne Campbell, Valley CDC (413) 586-7521 Patrick McCarthy, Valley CDC (413) 586-7521 Tilman Lukas, MBL Housing & Development (413) 747-8515 Karen Leveille, HAP, Inc. (413) 731-8723 Bob Desrosiers, Desrosiers & Son, Inc. (413) 593-3335 Steve Vukovich, PDSI (413) 587-0031 Derek Cavanaugh, MHIC (617) 850-1106 Anthony Patillo, Northampton Bldg. Com. (413) 587-1272 Andy Pavlica, Engineering Design Associates (413) 788-0967 Emily Holmberg, E.B. Holmberg & Associates (413) 529-2237 Gregory Kereakaglow, E.B. Holmberg & Assoc (413) 529-2237 Sandy Lake, Robert W. Hall Consulting Eng. (413) 789-3295 FROM: Kevin Rothschild-Shea RE: Millbank Affordable Housing Job Meeting— 06/20/03 DATES June 20, 2003 Pages: 3 1 South End.bridge a cle Agawam,Massachu3etts 01401 (413)7866556 telephone (413)786.6130 jaz www.oadsonwwhmiu.aom £ 'l d 9b6L �N OS 19-98t li[AHOS r' NOSldU AdH :: E��G Or unr 34 Michelman • Carlson & Schmitt Architects to submit vinyl elevation sketches. • Holmberg to comment on Desrosiers' drainage questions of 5/21/03. 79 Michelman • Robert W. Hall Consulting Engineers to push on fire alarm investigation noted last meeting. Next meeting: June 11`r' at 9:00 a.m. July 25`h at 9:00 a.m. Pencil Requisition Desrosiers submitted pencil requisition, all line items approved; Change Order#2 submitted by Kevin Rothschild-Shea, Desrosiers billing approved for: 100% Site and Piles 41% Raise Foundation 50% Foundation Vents 0% HVAC at 79 Michelman cc: Attendees Anthony Patillo, Northampton Building Commissioner Andy Pavlica, Engineering Design Associates Derek Cavanaugh, MHIC Sandy Lake, Robert W. Hall Consulting Engineers Emily Holmberg, E.B. Holmberg & Associates Gregory Kereakaglow, E.B. Holmberg & Associates 2 8i8 ' d 8tEL'ON 08i9 98L ilIWHOS M HIZ 3de .J Carlson&Schmitt Architects,Inc. Millbank Affordable Housing Job Meeting -June 20, 2003 Present: Joanne Campbell, Valley Community Development Corporation Patrick McCarthy, Valley Community Development Corporation Tilman Lukas, MBL Housing & Development Robert A. Desrosiers, Desrosiers & Son, Inc. Karen Leveille, HAP, Inc. Steve Vukovich, PDSI Commercial Building Solutions Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc. Progress • Repar 90%. • Concrete foundation walls at 30%. • Drainage structures set, drainage outlet from "pond" installed. 30-50 yards of concrete/bituminous rubble excavated; Desrosiers to dispose of site and price. Old News: • Carlson & Schmitt Architects to search files for Geotextile pricing, schedule for next change order. • Carlson & Schmitt Architects reviewed Holmberg's red-line drawings and requested clarification for grading to the North of 79 Michelman - currently receiving little or no grading; and grading off the edge of drive, downslope to the lawn North of 79 Michelman - Is guardrail required here? 18 Michelman -Brick Repair at Basement • Generally, scope and area of repair conforms with drawing locations. Quality of repair and pointing does not conform to specifications. The Contractor shall point and recourse brick, and repoint area of repair_ Where open joints/loose brick are adjacent to area of repair those areas are to be included in the repair. Kevin Rothschild-Shea, Patrick McCarthy, Bob Desrosiers, and Masonry Contractor to meet on site before/during corrective work. If additional areas are required Carlson & Schmitt Architects will specify. • Northeast Corner and West Wall Repair: Interior repairs at these areas (if needed)and hold off until exterior repairs are underway. • East Brick Wall: Preliminarily Robert W. Hall indicates vinyl cladding will negatively affect the performance of the wall. Carlson & Schmitt Architects to visit and verify insulation/vapor barrier presence/location. 1 South,End Bridge Circle Agawam,Massachusetts 01001 (413)7865556 telephone (413)786-6130 jax www.cnrW r1- 4mitt.com U17 6 -d CEi9-99L 8b6L �N 1111NH�S i�OSldd� Gudl� E FOOc G� ��