32C-141 (10) CS \ Carlson&Schmitt Architects,Inc.
FAX COVER SHEET
TO: Joanne Campbell, Valley CDC (413) 586-7521
Patrick McCarthy, Valley CDC (413) 586-7521
Tilman Lukas, MBL Housing & Development (413) 747-8515
Karen Leveille, HAP, Inc. (413) 731-8723
Bob Desrosiers, Desrosiers & Son, Inc. (413) 593-3335
Steve Vukovich, PDSI (413) 587-0031
Derek Cavanaugh, MHIC (617) 850-1106
Anthony Patillo, Northampton Bldg. Com. (413) 587-1272
Andy Pavlica, Engineering Design Associates (413) 788-0967
Emily Holmberg, E.B. Holmberg & Associates (413) 529-2237
Gregory Kereakaglow, E.B. Holmberg & Assoc (413) 529-2237
Sandy Lake, Robert W. Hall Consulting Eng. (413) 789-3295
FROM: Kevin Rothschild-Shea
RE: Millbank Affordable Housing
Job Meeting— 06/20/03
DATES June 20, 2003 Pages: 3
1 South End.bridge a cle Agawam,Massachu3etts 01401 (413)7866556 telephone (413)786.6130 jaz www.oadsonwwhmiu.aom
£ 'l d 9b6L �N OS 19-98t li[AHOS r' NOSldU AdH :: E��G Or unr
34 Michelman
• Carlson & Schmitt Architects to submit vinyl elevation sketches.
• Holmberg to comment on Desrosiers' drainage questions of 5/21/03.
79 Michelman
• Robert W. Hall Consulting Engineers to push on fire alarm investigation
noted last meeting.
Next meeting: June 11`r' at 9:00 a.m.
July 25`h at 9:00 a.m. Pencil Requisition
Desrosiers submitted pencil requisition, all line items approved; Change Order#2
submitted by Kevin Rothschild-Shea, Desrosiers billing approved for:
100% Site and Piles
41% Raise Foundation
50% Foundation Vents
0% HVAC at 79 Michelman
cc: Attendees
Anthony Patillo, Northampton Building Commissioner
Andy Pavlica, Engineering Design Associates
Derek Cavanaugh, MHIC
Sandy Lake, Robert W. Hall Consulting Engineers
Emily Holmberg, E.B. Holmberg & Associates
Gregory Kereakaglow, E.B. Holmberg & Associates
2
8i8 ' d 8tEL'ON 08i9 98L ilIWHOS M HIZ
3de
.J
Carlson&Schmitt Architects,Inc.
Millbank Affordable Housing
Job Meeting -June 20, 2003
Present: Joanne Campbell, Valley Community Development Corporation
Patrick McCarthy, Valley Community Development Corporation
Tilman Lukas, MBL Housing & Development
Robert A. Desrosiers, Desrosiers & Son, Inc.
Karen Leveille, HAP, Inc.
Steve Vukovich, PDSI Commercial Building Solutions
Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc.
Progress
• Repar 90%.
• Concrete foundation walls at 30%.
• Drainage structures set, drainage outlet from "pond" installed. 30-50 yards
of concrete/bituminous rubble excavated; Desrosiers to dispose of site
and price.
Old News:
• Carlson & Schmitt Architects to search files for Geotextile pricing,
schedule for next change order.
• Carlson & Schmitt Architects reviewed Holmberg's red-line drawings and
requested clarification for grading to the North of 79 Michelman - currently
receiving little or no grading; and grading off the edge of drive, downslope
to the lawn North of 79 Michelman - Is guardrail required here?
18 Michelman -Brick Repair at Basement
• Generally, scope and area of repair conforms with drawing locations.
Quality of repair and pointing does not conform to specifications. The
Contractor shall point and recourse brick, and repoint area of repair_
Where open joints/loose brick are adjacent to area of repair those areas
are to be included in the repair. Kevin Rothschild-Shea, Patrick
McCarthy, Bob Desrosiers, and Masonry Contractor to meet on site
before/during corrective work. If additional areas are required Carlson &
Schmitt Architects will specify.
• Northeast Corner and West Wall Repair: Interior repairs at these areas (if
needed)and hold off until exterior repairs are underway.
• East Brick Wall: Preliminarily Robert W. Hall indicates vinyl cladding will
negatively affect the performance of the wall. Carlson & Schmitt
Architects to visit and verify insulation/vapor barrier presence/location.