Loading...
32C-141 (9) r i i 79 Michelman Robert W. Hall Consulting Engineers to push on fire alarm investigation noted last meeting. • Owner (group) offered approval for expanded/original A/C scope of work valued at$16,500.00 — see attached. Next meeting June 200 at 9:00 a.m. Pencil Requisition Scheduled Meetings July 1 Vh at 9:00 a.m. July 25Th at 9:00 a.m. Pencil Requisition cc: Attendees Anthony Patillo, Northampton Building Commissioner Andy Pavlica, Engineering Design Associates Derek Cavanaugh, MHC Steve Vukovic-h, POSI Commercial Building Solutions Sandy Lake, Robert W. Hall Consulting Engineers Emily Holmberg, E.B. Holmberg & Associates Gregory Kereakaglow, E.B. Holmberg &Associates 2 E!8 'd 916L*0N 0819-98L 111WHOS Ii NOSIdVO WdLBE` 8008 '91 ' O r Carlson Be Schmitt Architects,Inc. Millbank Affordable Housing Job Meeting —June 6, 2003 Present: Joanne Campbell, Valley Community Development Corporation Patrick McCarthy, Valley Community Development Corporation Tilman Lukas, MBL Housing & Development Robert A. Desrosiers, Desrosiers & Son, Inc. Karen Leveille, HAP, Inc. Kevin Rothschild-Shea, Carlson & Schmitt Architects,Inc. Progress: • Rebar fabrication on site at 90%. • Concrete walls at 20% complete. • Rough grade at south side of 34, raised to approximate elevation. Old News- • Contractor estimate for Geotextile below paved areas submitted by Desrosiers. • Excess fill: E.B. Holmberg has red-line drawings on site; Carlson & Schmitt Architects has requested copy for review; Holmberg moving toward final definition. 18 Michelman • Carlson & Schmitt Architects to review drawing and specification and offer opinion regarding brick repair at basement. -Brick Veneer: Bob Desrosiers requested alternate repair and finish in lieu of specified work, lintels and brick repair will be completed, and suggests no maintenance vinyl siding. -Kevin► Rothschild-Shea raised con erg regarding moisture retention behind siding and/or within brick wall. Carlson & Schmitt Architects to review wall composition with Robert W. Hall before suggesting alternate treatment. Desrosiers to mobilize for porch stair foundation while concrete work at 34 is underway. 34 Michelman • Foundation pier raised with 24" sonotube, four #4's vertical, with #3's horizontal- • Additional pile information attached. • Kevin Rothschild-Shea to submit revised vinyl sketches. • Additional cost for drilling - $8,500:00 approved. Carlson & Schmitt to draft change order. • Holmberg to comment on Desrosiers' drainage questions of 5/21703 I South End Bridge Circle Agawam,Massachusetts 01001 (418)736,5556 telephone (413)786d130fax wwWxo,1eori,,chm4.com £1c' -d (� 16t'aN 0£ 19-9St IIMHOS ' NOS1dU VudC£ £ £QOG f PtP J Carlson&Schmitt Architects,Inc. ; 6 2003 ° .,ySPfC,1C'aS a"4 01050_- FAX COVER SHEET TO: Joanne Campbell, Valley CDC (413) 586-7521 Patrick McCarthy, Valley CDC {413) 586-7521 Ti man Lukas, MBL Housing &Development {413) 747-8515 Karen I-eveitle, HAP,Inc. (413) 731-8723 Bob Desrosiers, Desrosiers &Son, Inc. (413)593-3335 Steve Vukovich, PDSI (413)587-0081 Derek,Cavanau h MHIC, (617)850-1106 ., '[ (413) 587-1272 Andy Pavlica, Engineering Design Associates (413) 788-0967 Emily Holmberg, E.B. Holmberg & Associates (413) 529-2237 -Gregory Kereakaglow, E.B. Holmberg & Assoc (413)529-2237 Sandy Lake, Robert W. Hall Consulting Eng. (413) 789-3295 FROM: Kevin Rothschild-Shea RE: Millbank Affordable Housing Job Meeting —06106/03 DATE: June 16, 2003 Pages: 3 I South End Bridge Ctrele Agowom,Mossochueetts 01001 (413)7865556 telephone (4f8)786-6130 fox www.ea{eorr schneitt eor i CE19-9SL illiM S q NOSIdVO H LE : Z H CZ ­91 * L "