32C-141 (6) Carlson 4-Sc1 mitt ArchAects.,I=
FAX CD V PR SHEET
T4: Joanne Campbell. Valley CDC (413) 586-7521
Patrick McCarthy,Malley CDC {413) 586-7521
Tilman Lukas, MBL.Housing& Development (413) 747-8515
Bob Desrosiers, Desrosiers & Sun, tnc. (413)593-3335
Steve Vukovich, PDSI (413) 587-0031
Derek Cavanaugh, MHIC
(15 17.)85D-1'IOf)
Anthony Patillo, Northampton Bldg- Com. (413) 587-1272
Sandy Lake, Robert W. Hall Consulting Eng. (413)789-3295
Army Pavhca, Engineering Design Associates (413) 788-4967
FROM: Kevin Roth schlld-Shea
RE: Millbank Affordable Housinq
_lob Meeting —04/24/93
DATE: Anil 28, 2003 PACES: 2
15owh End,8ndige Circle Agawam,Mauar_huwttu 01001 (413)7865566 telephone (413)7866190 jar www.c4,twn4chmiu.com
Ili . � CU OKI (1410-flA� I IINtia1C til�Cl)#ti1 Htiir�R 490,7 Sl7 ltlH
Carlson SamitfArEhitcM lnc.
Millbank Affordable Housing
Job Meeting -April N, 2003
Present: Joanne Campbell, valley Community Development Corporation
Patrick McCarthy,Valley Community Development Corporation
Tilman Lukas, MBL dousing &Development
Robert A. Desrosiers, Desrosiers& Son, Inc.
Steve Vukovich, PDSI Commercial Building Solutions
Derek Cavanaugh, MHIC
Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc.
Progress'
34 Michelman
• Foundation Ex6�vation 90% complete.
• Pile installation 5.50% complete.
• Concrete caps and formwork 5-10% complete.
• Desrosiers to submit cost for revised pile and pile. can costs for#4; 27 and 28
18 Michelman
• Basement brick rep air/repointing undervay.
79 Michelman
• Desrosiers to push for additional fire alarm pricing.
• Water main relocation and installation completed.
Water quality test scheduled; Desrosiers to copy results to Carlson &
Schmitt Architects,
New Issues:
18 Michelman:
• Carlson & Schmitt Architects to revisit and review brick, repointing scope and
specification,quality is generally poor and minimal.
34 Michelman
• Carlson & Schmitt Architects to contact OTQ to revisit excavation, and concrete
material: and repot on soil conditions and disposal options for concrete waste.
Desrosiers to estimate volume and unit cost for breaking up concrete and
trucking off site.
• Engineering Design Associates visited site last week, will submit report,
• Desrosiers to submit concrete mix data, and continue testing per engineer
directive.
General:
Carlson & Sch�.zitt Architects to fax distribute per,L;i recs:isition to all parties;
please contact Kevin Rothschild-Shea before Wednesday with comments.
cc: Attendees
Anthony Patilio, Northampton Building Commissioner
Sandra Lake, Robert W.Hall Consulting Engineers
Andy Paviica, Engineering Design Associates
1 South End Bridge Circle Agawam,Mmiachuaetti 01001 (4131 7805-15.5-56 Olephona (41 q)79A-61,?0 ft,± -_ww.car!sor s_alrt t. on
�,i7 � cFCi obi �si.a-gg! i��Gyu�c � hins��H� iriy�ti :g cnn� a` adH