Loading...
32C-141 (5) Carlson&SchmittArchaects,Inc. FAX COVER SHEET TO: Joanne Campbell, Valley CDC (413) 586-7521 Patrick McCarthy,Vafley CDC (413) 586-7521 Tilman Lukas, MBL Housing & Development (413) 747-8515 Bob Desrosiers, Desrosiers & San, Inc: (413) 593-3335 Steve Vukovich, POSI (413)587-00.31 Anthony Patiilo, Northampton Bldg. Com. (413) 587-1272 Sandy Lake, Robed W. IiMl Consulting Eng. {413) 789-3285 Andy Paviica, Engineering Design Associates (413) 788-0967 FROM: Kevin Rothschild-Shea RE: Millbank Affordable Housing Job Meeting --03121/03 DATE: March 24, 2003 PAGES: 2 15outh End Bridge Cirde Agawan+,Naswchwew 01001 (41?)786.3556 WVhone (413)186-6130f= www.eari4orhechmat,.com c/I *d H69'ON H19-96L ilkWS q NOS1Nd0 Utid9ti E 16H, Carlson&Schmitt Architects,Inc. Millbank Affordable,Housing Job Meeting - March 21,2i3C3 Present: JOanreGampbell, Valley COmff"ant Corporation Patrick McCarthy, Valley Community Development Corporation Tilman Lukas, MBL4#ous4rtg &t3EVe"Opment Robert A. Desrosiers, Desrosiers&Son, Inc. Steve Vukovich, PL�`S�Commercial Building Solutions Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc. Progress: 34 Michelman • Pile installation 40% complete. 18 Michelman • Basement ciear4{cut, new steel to+urrms and bearing wail installation complete. • Brick pier engaged with boulder to be changed to typical steel columns/ New Issues: 34 Michelman • Carlson &SchrrW Amhitects 10 for Awd pale dale steels to Steve Vukovich • Piie number 4 encountered obstruction; Carlson & Schmitt issued sketch this m n atit -,evlsed pale c�y3 arjd additional Rite to fie installed. Pile numbers 27 an ncountered poor soil. Desrosier to forward remaining pi a reports; Carls .& wit# will sutcsetluerrtly offer revisedladditional pile requirements. • Desrosier to ap*far lrermh permit,inquire status of water main relocation. • Carlson &Schmitt investigating first floor beam revisions. 79 Michelman • Carlson & Schmitt Architects to forward revised fire alarm requirements. General: • Pencil requisition reviewed and approved; Desrosier to submit(6) six copies, with required forms to Can a Sclfatt Architects. • Next month Desrosier to begin outlining revised schedule. Nextrneeiing:--Fcaday;-Apr'{1-f&-2gp3;-g;Q . cc: Attendees AM"Plat%, Northampton.Buftrt Commissi.o�p�er - Sandra Lake, Robert W. Hall Consulting Engineers Andy Pavlica, Engineering Design Associates 1 Jourh End Bridge Circle {493)786-6989 fax mwco.-r1-n-4jn*z,—