Loading...
32C-141 ENGINEERING DESIGN C� ASSOCIATES , INC . 27 November 2002 _.. .-.� Building Department City Hall 212 Main Street Northampton,MAO 1060 Attention: Mr.Anthony Patillo Building Inspector Reference: Millbank Affordable Housing Michelman Avenue Northampton,Massachusetts Dear Mr.Patillo: At your request,our office has reviewed the calculation we prepared for our foundation design against the product information provided us by the A.B.Chance Company, manufacturers of the"Micropiles"to be used at the above-mentioned project and the calculations prepared by A.B.Chance's engineer,Mr. Gary Seider, P.E.. Based on the information prepared by and supplied to us,the pile loading is less than the 22 ton limit (780 CMR 1817.3.2)requiring that the piles be load tested. If y u have stions concerning this matter,please feel free to contact me directly. eering esign Asso Wes, In . Andrew lica,Jr.P.E. d:\2002_eda\projects\c&s\baystate\correspond\bldg_dept_l202.doc 969 Main Street Springfield,Massachusetts 01103 Phone:413.788.0182 Fax:413.788.0967